Minutes of the
Bayfield County Ad Hoc Business Park Planning Committee Meeting
1:30pm, Wednesday, March 1, 2017
Business Park, Ashland, WI
Members Participating: Scottie Sandstrom, Mark Abeles-Allison, Brett Rondeau, Leo Carlson
Members Excused: None
Others Attending: Tony Johanik
Sandstrom called the meeting to order at 1:30pm
PUBLIC COMMENT: None
Minutes of November 2, 2016: Motion Rondeau, Carlson to approve minutes of the Jan 4,
2017. meeting. Motion carried.
Item 4: Sandstrom discussed the issue of the Business Park Road Access. Abeles-Allison noted
we should get confirmation from the Town regarding utilization of State Farm Road and
willingness to maintain the road as a Town road. Mark will send a letter.
Sandstrom noted the RFP should be issued soon. Abeles-Allison will get this out in March for a
return and review by the next meeting on April 5, 2017.
Sandstrom noted the potential to access TEA Funding with DOT for this project. Mark to follow
up with DOT.
Sandstrom will follow up with USDA for road funding assistance for the business park.
Item 5:
Reviewed options 1-3 provided by WisDOT. $50,000 is required for the turn lanes / bypass
lanes with $26,000 is required for State Farm Road Construction / intersection curb and gutter.
Options 1 and 3 were similar with a preference for #3 because of the improved perpendicular
tangent. Since construction is taking place in 2018 it is advisable to proceed now to lower costs
for mobilization and engineering.
Questions to the DOT would be can the county proceed with passing lane and turn lane
improvements without modifications to un-named road. Mark will inquire.
Scottie to speak with Ashland Ford on this matter.
The County could use the TEA grant for this as well if jobs were available.
Rondeau made the motion to recommend to the Exec Committee option 3 if the county were to
proceed with US 2 improvements, Carlson. Motion carried.
Item 6:
Recommended next steps reviewed by Sandstrom. These are Consultant recommendations on
steps to follow for the business park.
#2: ROW: July with new county surveyor
#3: Rezone: No action now
#4: Design main road: underway
#5. Perk tests for septic systems. Dependent on next tenant.
#6: Utilities / water / sewer: pending
#7: US 2 Review: underway
#8: Telecommunications Tower: Add antenna in Moquah.
#9: Regional Storm Water on site:
#10: Obtain wetland designation from DNR. Begin reviewing this process.
#11: Seek outside funding: Ongoing
Item 7:
Motion Abeles-Allison, Rondeau to enter in and out of closed session pursuant to Wis. Statutes
§19.85(1)(e) to deliberate or negotiate the possible sale of land at the Bayfield County Business
Park for future businesses in the Business Park. Johanik was invited to remain in the closed
session. Motion Carried. Entered closed session at 2:30pm.
Motion Rondeau, Abeles-Allison to return to open session. Motion carried. Returned to open
session at 2:50pm.
Item 8. Sandstrom will talk with Seth Hudson about the existing agreement.
Next meeting April 5, 1:30.
Meeting adjourned at 3:10pm