Loading...
HomeMy WebLinkAboutAd Hoc Business Park Planning Committee - Minutes - 2/14/2023K:\Ag Station Business Park Planning Committee\Minutes\2023 Minutes\FEB 14, 2023 MINUTES Business Park.doc Bayfield County Administrator 117 E 5th Street, PO Box 878, Washburn, WI 54891 Ph: 715-373-6181 Fx: 715-373-6153 Mark Abeles-Allison, County Administrator Kristine Kavajecz, Human Resources Director Paige Terry, Clerk III Minutes of the: Bayfield County Ad-Hoc Business Park Planning Committee Tuesday, February 14th, 2023 – 10:00 a.m. Meeting Held at the Town of Eileen Town Hall BAYFIELD COUNTY AD HOC BUSINESS PARK PLANNING COMMITTEE Cole Rabska, Chair Ken Disher Mark Abeles-Allison Marty Milanowski, Vice-Chair Leo Carlson Preston Mikula Jake Hipsher Call to Order: The Bayfield County Ad Hoc Business Park Planning County was called to order at 10:09 a.m. by Committee Chairman Rabska. Members Present: Ken Disher, Mark Abeles-Allison, Cole Rabska, and Marty Milanowski Members Excused: Leo Carlson, Preston Mikula, and Jake Hipsher Others Present: Bruce Markgren- Cooper Engineering President Introductions: Introductions of committee members were made. Public Comment: None Minutes from January 18, 2023: Motion by Milanowski, seconded by Abeles-Allison to adopt the minutes of the January 18, 2023 Bayfield County Ad-Hoc Business Park meeting as presented. Motion Carried. Discussion with Cooper Engineering Regarding Utility Feasibility Study: Bruce Markgren, Cooper Engineering President, reviewed the plans and options available for the utilities. The committee discussed the following topics: • Utilizing a smaller pipe pressure sewer along the right-of-way • Running a sewer line along Highway 137 that would end at the golf course located in the City of Ashland. There is a narrow right-of-way along Highway 137. • The Sadjak area in Bayfield County currently does not have a sewer but there may be a strong interest in the area due to the existing holding tanks. K:\Ag Station Business Park Planning Committee\Minutes\2023 Minutes\FEB 14, 2023 MINUTES Business Park.doc • A possible alternate route along the natural gas line that will then run north parallel to the Northern Great Lakes Visitor Center. • Other sewer options include a group mound or individual mounds/septic. • Options for water include shallow wells. Individual wells would be cost-effective; however, well testing may prove to be a hassle for park residents. Discussion Regarding Ribbon Cutting: The committee discussed holding a ribbon cutting in either May or June 2023. Chairman Rabska will determine the date of the ceremony at a later time and get back to the committee. Discussion Regarding Business Park Policy Regarding Storage: Chairman Rabska stated that current policy does not allow storage units. Rabska explained that the topic will be discussed with the other businesses at the park. Discussion Regarding SSG/WEDC Update of Site Selection Pilot Program: Chairman Rabska delivered a summary of the Site Selection Pilot Program to the committee and stated that the next meeting will occur on March 31, 2023. Discussion Regarding Items Needed to Establish Codes, Covenants, and Restrictions for the Bayfield County Business Park: Abeles-Allison will be providing documentation at a later date. Adjournment: There being no further business to come before the Bayfield County Ad-Hoc Business Park Planning Committee, Committee Chairman, Rabska adjourned the meeting at 11:45 a.m. Respectfully submitted, Mark Abeles-Allison Mark Abeles-Allison, Bayfield County Administrator