HomeMy WebLinkAboutPlanning & Zoning Committee - Agenda - 6/15/2017k/debsdata/zc/phnotice/2017/#6june15 Proofed by:_____
Prepared by: RDS/dak 5/19/17-9:43am); (®6/6/17-12;04pm)
Zoning Committee
PUBLIC HEARING
“REVISED” (6/6/17-12:04pm)
BAYFIELD COUNTY PLANNING AND ZONING COMMITTEE
JUNE 15, 2017 AT 4:00 P.M.
BOARD ROOM, COUNTY COURTHOUSE
WASHBURN, WISCONSIN
The Bayfield County Planning and Zoning Committee of the County Board of
Supervisors will hold a public hearing on Thursday, June 15, 2017 at 4:00 P.M. in the
Board Room of the Bayfield County Courthouse in Washburn Wisconsin relative to the
following:
Lake Superior Big Top Chautauqua, Ltd, owner and Kevin Hunt, agent (located in a
shoreland/wetland zone) request a conditional use permit to operate a (Banquet Hall /
Event Center and Bar, Cocktail Lounge, Tavern) out of an existing structure – consisting
of events, fund raisers, dinner theatre, shuttle pick-up and two sleeping units for
residential use. Property is an 18.59–acre parcel (Tax ID# 33995) described as a parcel
of land in NE NW and Lots 1-9 & Lots 11-19 Block 24 and Lots 1-20 Block 33 and Lots
1-20 Block 34 and Lots 7-10 and Lots 17-20 Block 52 and Lots 7-10 Block 51 of Rice
and Thompson's Addition in Document 2016R0-565855 in Section 23., Township 50
North, Range 4 West, Town of Bayfield, Bayfield County, WI. (* Note: parcels within one
thousand (1,000) feet landward of the ordinary high water mark of navigable lakes, ponds or flowages or within three
hundred (300) feet landward of the ordinary high water mark of navigable rivers or streams or to the landward side of
the floodplain, whichever distance is greater is deemed a shoreland and/or wetland zone).
Benjamin & Lisa Baldwin (non-shoreland) request a conditional use permit to
construct and operate (Machine Shop, Welding, Metal Fabrication & Processing,
Welding Shop; Building Contractor (Equipment & Material Storage); and Sawmill &
Lumber Yard) — [consisting of: construction business, portable sawmill, steel roofing,
roll forming]. Property is a 32–acre parcel (Tax ID# 28940) described as S 32A of the N
½ of the NW ¼ in Document 2015R-557622, in Section 4, Township 51 North, Range 4
West, Town of Russell, Bayfield County, WI.
Bayfield County, owner and Mark Abeles-Allison, agent (non-shoreland) request a
conditional use permit to construct and operate (Building Contractor [Equipment &
Material Storage] and Carpenter Shop, Cabinet Making, Woodworking Shop, etc. –
consisting of: {material, equipment storage, shop for KV Tech}. Property is a 10–acre
parcel (part of Tax ID# 37368) described as the W ½ of the NE ¼ of the NW ¼, lying S
of Tri County Corridor, in Document 2012R-542458, in Section 11, Township 47 North,
Range 5 West, Town of Eileen, Bayfield County, WI.
All interested parties are invited to attend said hearing to be heard. Any person wishing
to attend who, because of a disability, requires special accommodations, should contact
the Planning and Zoning office at 373-6138, at least 24 hours before the scheduled
k/debsdata/zc/phnotice/2017/#6june15 Proofed by:_____
Prepared by: RDS/dak 5/19/17-9:43am); (®6/6/17-12;04pm)
Zoning Committee
meeting time, so appropriate arrangements can be made. Immediately after the public
hearing, the Planning and Zoning Committee will hold its regular monthly meeting.
If further information is desired, please contact the Bayfield County Planning and Zoning
Department, at the Courthouse, Washburn Wisconsin - Telephone (715) 373-6138 or
visit our website: http://www.bayfieldcounty.org/147.
Robert D. Schierman, Director
Bayfield County Planning and Zoning Department
k/debsdata/zc/agenda/#6june2017
Prepared by: RDS/dak (5/19/17-9:51am) Proofed By: _____ Zoning Committee
AGENDA
Bayfield County Planning and Zoning Committee
Public Hearing and Public Meeting
Thursday, June 15, 2017
4:00 P.M.
Board Room, County Courthouse, Washburn, WI
Committee Members: Bill Bussey, Dennis Pocernich, Brett Rondeau, Jeff Silbert and Fred Strand
1. Call to Order of Public Hearing:
2. Roll Call:
3. Affidavit of Publication:
4. Public Comment – [3 minutes per citizen for items not listed on this agenda]
5. Minutes of Previous Meeting(s): (May 18, 2017)
6. Review of Meeting Format – (Hand-Out Slips to Audience)
7. Public Hearing: (open for public comment)
A. Lake Superior Big Top Chautauqua, Ltd/Kevin Hunt (Bayfield) – event center,
fund raisers, dinner theatre, shuttle pick-up and (2) sleeping units for residential use
B. Benjamin and Lisa Baldwin (Russell) – construction business, portable sawmill, steel
roofing and roll forming
C. Bayfield County (Eileen) – material, equipment storage, shop for KV Tech
8. Adjournment of Public Hearing:
9. Call to Order of Planning and Zoning Committee Meeting:
10. Roll Call:
11. New Business: (public comments at discretion of Committee)
A. Lake Superior Big Top Chautauqua, Ltd/Kevin Hunt (Bayfield) – event center,
fund raisers, dinner theatre, shuttle pick-up and (2) sleeping units for residential use
B. Benjamin and Lisa Baldwin (Russell) – construction business, portable sawmill, steel
roofing and roll forming
C. Bayfield County (Eileen) – material, equipment storage, shop for KV Tech
Agenda Review and Alteration
D. Jon Nelson (Bayview) – expansion of mini-storage business (consisting of (2) additional
structures)
E. Due West, LLC (Drummond) – residential garage in commercial zone
F. Committee Members discussion(s) regarding matters of the P & Z Dept.
12. Monthly Report / Budget and Revenue
13. Adjournment Robert D. Schierman, Director
Bayfield County Planning and Zoning Department
k/debsdata/zc/agenda/#6june2017
Prepared by: RDS/dak (5/19/17-9:51am) Proofed By: _____ Zoning Committee
Note: Any aggrieved party may appeal the Planning and Zoning Committee’s decision to the
Board of Adjustment within 30-days of the final decision.
Any person wishing to attend who, because of a disability, requires special accommodations,
should contact the Planning and Zoning office at 373-6138, at least 24 hours before the
scheduled meeting time, so appropriate arrangements can be made.
Please Note: Receiving approval from the Planning and Zoning Committee does not authorize the
beginning of construction or land use; you must first obtain land use application/permit card(s) from the Planning and Zoning Department.