HomeMy WebLinkAbout25-0021wfl
ll J,4id 1 / 2025 to
B^4YFIEL4 117E 5 Street
eid Co. Zoning De Box 58
ashburn, WI 54891
PLANNING & ZONING DEPARTMENT (715)373-6138
perm its Ctbavfieldcountv.wi.aov
www.bavfieldcountv.wi.gov/zonlng
LAND USE PERMIT APPLICATION
County Use Only:
Zoning District:
Shoreland:
Fee Paid:
Refund:
Permit #:
Date:
Property Owner Name:
Authorized Agent Name (if applicable):
bee A7 fn
t
Telephone Number:
Telephon umber: 9 Tfo Peiv.%
5/-3 - cnv
E -Mail Address:
E -Mail Address:
O
Mailing Address:
Mailirt Address:
X960 ,-a,-P0,' r
City, State, Zip:
City, State, Zip:
Ca/eCQ6/e n .v
Contractor:
Telephone Number:
E -Mail Address:
PROJECT LOCATION
Project Address (if different from mailing address):
SEE R TTAc6,cd
Legal Description (if additional space is needed, attach a separate sheet):
Section, Township, Range: 37j;%/ Y4'1 Raw
Town of:
ax D #:
Lot Size (Acres/Squ Feet):
SgE 7TAc - c
PROJECT DESCRIPTION (check
al I that apply)
Foundation Type:
Pr posed Use:
Structure Type:
Residential
❑ Residence/Principal Structure
0 Basement 0 Walkout Basement 0 Slab
O Commercial
0 Detached Garage
0 Crawlspace 0 Ground 0 Skids
❑ Municipal
0 Boathouse (one story only)
❑ Open-sided/Screened
Other (explain): ,t!J4
Proposed Project:
Proposed Sign is: 0 New 0 Replacement
❑ New Construction
Structure (gazebo, etc.)
0 On -premise 0 Off -premise ❑ I -sided 0 2 -sided
ddition/Alteration
0 Stairway to navigable waters
0 On -building 0 Multi -Tenant
O Change/New Use
0 Sign
Length: Width: Height:
❑ Relocate (existing structure)
0 RV Placement
Proposed RV is: 0 New 0 Replacement
❑ Temporary (12 or less months,
❑ Shipping Container
does not apply to RV placement)
0 Shoreland Grading (Class A)
Year: Vin #:
ONRI W,rtEit perk, t
iOther (explain):
E"P'K'..h.i;2 - -d0>3
Alri riT; ./ 'f's. %s /
Make: Model:
PROPOSED PROJECT AREA - Are ' nearest square foot of outside dimeri "bns including unfinished area, attached garages
and above grade decks or porches (does not apply to Signs or RVs)
Basement:
I" Floor:
Loft:
2nd Floor:
3'd Floor:
Other:
Total Square Footage:
Overall Height (finished grade to peak):
LAND USE PERMIT APPLICATION REVIEW
1) Will this be the first structure on the site? ❑ Yes,2'No
2) What is the total number of bedrooms on the property once this project is complete ?
3) Is there a proposed/existing sanitary system on the property? ❑ Proposed - Type 0/4 0 Existing - Type
4) Will any of the following occur within the proposed project/structure?
0 New Electrical Installation O New Plumbing Installation 0 Sleeping
5) Has the location of the proposed project been staked including structure, sanitary system, and well? ❑ Yes ❑ No
6) If required, who marked the property lines? Applicant/Property Owner ❑ Licensed Surveyor
7) Is the property in the shoreland, within 300 feet of a river/stream/landward side of floodplain or 1000 feet of a
lake/pond/flowage? VYes ❑ No 0 Unsure
8) Is there wetland located on or near the property? 'Yes ❑ No ❑ Unsure
9) Is there floodplain located on or near the property? I(Yes ❑ No O Unsure
10) Is this project associated with any of the following: ❑ Rezone ❑ Conditional Use 0 Special Use ❑ Variance
11) Did you contact the town to see if any permits/requirements apply to your project?W'Yes ❑ No
The following items are included with the application:
0 Site Plan
❑ Building Elevations
❑ Floor Plan/s
❑ Fees
All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary Permit, if
required, issuance needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a
permit will result in penalties.
The local Town, Village, City, State or Federal agencies may also require permits. The construction of one- & two-family dwellings
and new plumbing/electrical installation for residential use structures (accessory/principal) require review and approval by the local
Uniform Dwelling Code (UDC) authority. All municipalities are required to enforce the UDC.
If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all necessary approvals
and recorded documents required to complete the project for which this permit is sought including requirements set forth in Wisconsin
statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the property is located,
and all other rules, regulations and requirements pertaining to that Condominium Association.
You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams.
Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification
of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources
wetlands identification web page, dnr.wi.aov/topic/wetlands, or contact a Department of Natural Resources service center (715)685-
2900.
I (we) declare that this application, including any accompanying information, has been examined by me (us) and to the best of my
(our) knowledge and belief it is true, correct, and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and
accuracy of all information that I (we) are providing and that will be relied upon by Bayfield County in determining whether to issue a
permit. I (we) further accept liability which may be a result of Bayfield County relying on this information I (we) are providing in or
with this application. I (we) consent to county officials charged with administering county ordinances to have access to the above -
described property at any reasonable time for the purpose of inspection.
Owner/s or Authorized Agent Printed Name: 14( v, d�4l'N t..0 t) �.(at� ti5SO d LA4tO f
Owner/s or Authorized Agent SignaturerL 7� Date: I 1 z
NOTE: If you are signing on behalf of the owner(s)'aletter of
l.autho/r�ization must accompany this application
Address to Send Permit: 1/'� (aC tCAZ 1 al4 RdC , aek W t . �"�W
Name
Property Address
Tax ID Deed Acres
Project
Qty
Halla, Trudy and Gordon (
46755 Funnys LN, Cable, WI 54821
16995
7.10 Tree Drop
2
16991•
0.90
16992'
0.97
Hansen, Stuart i-
46100 W Jackson Lake Rd, Cable, WI 54821
16971 •
38.60 Tree Drop
1
Kassof, Michael 3
46505 W Jackson Lake Rd, Cable, WI 54821
17001
1.70 Tree Drop
1
16951
0.40
16954 •
0.94
1 Bowen, Sharon •I
46735 Funnys Ln, Cable, WI 54821
16999 •
6.30 Tree Drop
1
17000
2.13
Lewis, Greg N
22640 Circle Dr N, Cable, WI 54821
24384 •
0.74 Tree Drop
1
Campbell, Scott C
22530 Circle Dr N, Cable, WI 54821
24377 •
2.40 Tree Drop
2
24388 •
3.05
Ackerman, Gary 7
22620 Circle Dr N, Cable, WI 54821
24387 s
1.80 Tree Drop
2
24378 •
1.40
Schultz, JoAnn
21880 Juneks Pt Rd, Cable, WI 54821
24417 •
1.00 Tree Drop
1
24418
0.70
Brose, Michael (LouJack LLC) !
45521 Marsh Ln, Cable, WI 54821
22463,26
5.20 Tree Drop
2
24423 •
54.89
24390
16.10
Lueth, Randy (0
43995 Cty Hwy D, Cable, WI 54821
365b& 517
0.74 Tree Drop
1
Litwinchuk, Anthony I I
43618 Cty Hwy D, Cable, Wi 54821
25106 •
1.50 Tree Drop
1
Spitzer Upnorth LLC (Garden Lake) t2.
24677
48.00 Tree Drop
2
Rottier, Eric f3
43354 Harmon Dr, Cable, Wi 54821
24684•
0.80 Tree Drop
1
D'Andrea, Michael !4
24330 Cty Hwy M, Cable, WI 54821
24866 •
0.93 Tree Drop
1
36501
5.96
Trauba, Todd /;
24320 Cty Hwy M, Cable, WI 54821
24867 •
3.12 Tree Drop
1
Moorman, Scott fb
43520 Duck Pt Rd, Cable, Wi 54821
25244 •
0.60 Tree Drop
1
Herbst, Patricia 17
43615 S Castle Garden Rd, Cable, WI 54821
24035 •
1.80 Tree Drop
1
Total T/D 22 I
Projects approved but not completed
Spitzer
%S
35176 •
19.48
Tree Drops 2
24588 •
11.30
1
24589 •
34.30
3
LaBedz
19
24578 •
1
Tree Drops 1
Miller
xb
24667 •
13.82
Tree Drops 4
Total T/D
Grand Total
1f}Nset.
ar
170/O
(C4CoGl(
.Z
)y39/
RQet%Mii
A3
36 Y79
/u nr a j{
z t/
l6 ?IC
frar ncri's
xS
10
32
•AI
.+s
:y
6
•
Juneia Po•ar
C M.v.NV Wn.
AW`
Ca
10•
Winter `24/'25
Tree Drop
Projects
• Proposed
Tree Drop
Sites*
* Sites are
approximate to
fit on ONE map
• Iq overview
r}`
A
.13 = • �6
- a' !J••ia
Lflre
Town of
Nam•..son
E':::::
SEES@99..:::..99
.��...
:ESE
. . ,
:.:.
■•
E:E.
n.•EEn••• MEIN
.......E...........
9MUM
...�......
' ®: •::::..::::.:::..
►
.. :SE ES :.:.
.G
.:•
•S•9•nE
•.S:
.....::....
E:••�:U�EE
E•E•■•■
•:€:g:M::•
■
E•
•••••••••••
•••
•n..........•E
.::::...
:.C......i...
CNE:
=
E:..
•.•ua•.'��E•
�•:
.:......::::::......E:::E:......'.E.:�........
....E
:
EEE:BE99:
ESE
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
1300 W Clairemont Ave.
Eau Claire, WI, 54701
03/22/2022
Namekagon Lake Association, Inc.
c/o Ted Peichel
44960 Bear Point Rd
Cable, WI 54821
[sent electronically]
Dear Mr. Peichel:
Tony Evers, Governor
Preston D. Cole, Secretary
Telephone 608-266-2621
Toll Free 1-888-936-7463
TTY Access via relay - 711
L4ZI.
GP -NO -2022-4-00634
Thank you for submitting an application for a General Permit to place habitat structures in Namekagon Lake located in the SE
1/4, NE 1/4, Sec. 10, T. 43, R. 06W, Town of NAMAKAGON, Bayfield County.
You have certified that your project meets the eligibility criteria for this activity. Based upon your signed certification, and my
review, you may proceed with your project. Please take this time to re -read the permit standards and conditions. You are
responsible for meeting all general permit eligibility standards and permit conditions. This includes notifying the Department
before starting the project, and submitting photographs within one week of project completion. We have not reviewed your
plans for compliance with installation and construction standards. You are responsible for ensuring that the project meets all
eligibility standards described on the attached checklist. Please note that your project must be complete within 3 years of the
date of this letter.
The Department conducts routine and annual compliance monitoring inspections. Our staff may follow up and inspect your
project to verify compliance with state statutes and codes. If you need to modify your project please contact Water
Management Specialist, Nathan Walker at (715) 492-0243 or email nathan.walker@wisconsin.gov to discuss your proposed
modifications. If you fail to comply with state statutes and code, the Department has the authority to pursue enforcement
which could include site restoration and fines.
The Department of Natural Resources appreciates your willingness to comply with waterway regulations, which help to protect
the water quality, fish and wildlife habitat, natural scenic beauty and recreational value of Wisconsin's water resources for
future generations. You are responsible for obtaining any other local, state or federal permits that are required before starting
your project.
Sincerely,
T7JLL
Nathan Walker
Water Management Specialist
Copy to: USACE Project Manager
Robert Schierman, Bayfield County Zoning Administrator
Matt Koshollek, Conservation Warden
Scott Toshner, DNR Fisheries Biologist
ELIGIBILITY CRITERIA
1. The fish habitat structure may be located in an area of special natural resource interest, or within a public rights
feature as described in Wis. Admin. Code s. NR 1.06, or at a site where the Department requires a permit under Wis. Stats. s.
30.12(2m)
2. The project purpose is to place a fish habitat structure solely for the purpose of improving fish and wildlife habitat, or
fish stocking, and the placement does not result in significant adverse impacts to the public rights and interests, cause
environmental pollution as defined in Wis. Stats. s. 299.01(4), or result in material injury to the riparian rights of any riparian
owner pursuant to Wis. Stats. s. 30.206(3r)(a)2., nor does it cause more that minimal adverse environmental impacts,
materially interfere with navigation, nor have an adverse impact on the riparian property rights of adjacent riparian owners
pursuant to Wis. Stats. s. 30.206(1)(am).The applicant or co -applicant is the riparian owner.
3. The applicant or co -applicant is the riparian owner.
4. The fish habitat or stocking structure must be placed entirely within the riparian zone of interest as determined by one
of the methods outlined in Wis. Admin. Code s. NR 326.07. Certain habitat structures may be placed waterward of the line of
navigation where allowed by activity specific standards contained in this general permit.
5. The riparian owner or the person who places fish habitat or stocking structures under coverage of this General Permit
must have the approval of the local Department Fisheries Biologist before placing the structure. A list of fisheries biologists can
be found at http://dnr.wi.gov/topic/fishing/people/index.html.
6. Fish Spawning. To minimize adverse impacts on fish movement, fish spawning, and egg incubation periods,
structures may not be placed during the following time periods:
• September 15th through May 15th for all trout streams; and upstream to the first dam or barrier on the Root River
(Racine County), the Kewaunee River (Kewaunee County), and Strawberry Creek (Door County). To determine if a waterway
is a trout stream, you may use the WDNR website trout maps which can be found at
http://dnr.wi.gov/topic/fishing/trout/streammaps.html
March 1st through June 15th for ALL waters.
The regional Department Fisheries Biologist may waive or modify timing restrictions in writing. To find your biologist and
request in writing a waiver or modification of fish spawning timing restrictions for your project use the WDNR website at:
http://dnr.wi.gov/topicfshing/people/index.html.
7. The placement of structures must be conducted in a manner that prevents the collection, removal or dispersal of
sediment away from the project site to the maximum extent practicable. Temporary sediment control measures used to
accomplish this should be completely removed from the waterbody no more than 24 hours after the project is completed.
8. All temporary sediment control measures must follow all state lighting requirements and cannot materially obstruct
navigation.
9. Live, living or growing aquatic plants may not be removed unless the removal is exempt under Wis. Stats. s. 23.24 (4)
or complies with the provisions for waiver of the permit requirement under Wis. Admin. Code s. NR 109.06.
10. Removal of material above the ordinary high water mark is a land grading activity and is not authorized under this
general permit.
11. Dredging under Wis. Stats. s. 30.20(1 g) (b) 1., is not allowed for the placement of a fish habitat or stocking structure.
This general permit does not authorize the removal of native bed and bottom material which includes sand, cobble, silt,
detritus, and other organic material. Dredging does not include "de minimus" activities.
12. A deposit of sand, gravel or stone under Wis. Stats. s. 30.12(1g) (a), may be associated with the placement of a fish
habitat or stocking structure provided the deposit is limited to the area immediately underneath or within one foot of the
structure and is less than 2 cubic yards.
13. Erosion control measures must meet or exceed the technical standards for erosion control approved by the
department under Wis. Admin. Code subch. V of ch. NR 151. Any area where topsoil is exposed during construction must be
immediately seeded and mulched or riprapped to stabilize disturbed areas and prevent soils from being eroded and washed
into the waterway. Note: These standards can be found at the following website: http://dnr.wi.gov/topic/stormwater/standards/.
14. Unless part of a permanent stormwater management system, all temporary erosion and sediment control practices
must be removed upon final site stabilization. Areas disturbed during construction or installation must be restored.
Additional Standards for ALL Fish Sticks and Tree Drops:
1. Fish sticks or tree drops may only be placed on lakes, flowages, rivers listed in Wis. Adm. Code NR 102.06(3)(a), and
rivers over 250 feet in width. Note: the demarcation separating a river and a flowage is spatially defined using the identify tool
on the Department's Surface Water Data Viewer which can be found at: http://dnr.wi.gov/topic/SurfaceWater/swdv/.
2. If possible, the structure should not be located within an area narrower than 250 feet in width where boating activity is
confined. If the structures are placed in an area narrower than 250 feet in width where boating activity is confined, the structure
must allow for 150 feet open water navigation from the end of the structure to the line of navigation associated with the
opposing shoreline (3 ft. water depth) as defined in Wis. Admin. Codes. NR 326.03(4).
3. The location of the structure may not have an adverse impact on the riparian property rights of adjacent riparian
owners, may not cause more than minimal adverse environmental impacts, and may not materially interfere with navigation as
provided by Wis. Scats. s. 30.206(1)(am).
4. The structure must be placed fully within the riparian zone of interest as defined in Wis. Admin. Codes. NR 326.07,
but may extend waterward beyond the line of navigation (3 ft. water depth).
5. The structure must be placed at least 100 feet away from all of the following:
a. a bridge.
b. a municipal or commercial marina.
c. a designated swimming area that is open to the public that is marked by buoys, ropes, or postings along the shore.
This includes publicly accessible swimming areas on private land.
d. a publicly accessible boat ramp and piers associated with boat ramps that are solely for the purpose of loading and
unloading water craft.
e. a designated carry -in only watercraft access point.
6. A portion of the structure must be placed and anchored within 20 feet from the bank toe, or in water depths less than
or equal to 3 feet based on normal summertime lows.
Note: Bank toe as defined in Section 7 means, "the break in slope at the foot of a bank where it meets the bed."
7. There are no restrictions on the placement distance landward of the bank toe.
8. Installation of fish sticks or tree drops must use live or recently live trees, harvested within a -year of placement.
Recently live is defined by the presence of some buds or leaves on the tree when cut. Rotten, long -dead, or hollow trees are
not suitable due to their floating nature.
9. If whole trees are grouped, attached or anchored together, the resulting structure must include a minimum of 1 tree
with a basal diameter of at least 8 inches. If a single tree is used its basal diameter must be at least 8 inches.
10. The removal of living trees above the ordinary high water mark that are harvested within 35 feet of a navigable
waterway may be subject to local zoning ordinances which place restrictions on cutting trees in the shoreland zone. The
applicant is responsible for ensuring that their project is in compliance with any local zoning requirements.
Additional Standards for NEW Fish Sticks and Tree Drops:
1. To facilitate lake -wide management efforts under the public trust that will cumulatively restore and enhance fish
habitat in the near -shore littoral zone area and result in healthy fish populations, the standards contained in this part of the
general permit allow for the option of adding new structure sites to fish sticks or tree drops projects on the same waterbody
already granted coverage under this general permit with no additional permit fees.
To see if coverage for fish sticks or tree drops that allows adding new structure locations has been issued under this General
Permit for a specific waterway, you can ask your local Lake District or group or use the Departments Surface Water Data
Viewer found at: http://dnr.wi.gov/topic/SurfaceWater/swdv/ to view permits issued on your lake.
2. The following are eligibility standards that are applicable when adding additional structure sites to fish sticks or tree
drops projects on the same waterbody that have already been granted coverage under this general permit.
a. An applicant who applies for coverage under this general permit for the placement of fish sticks or tree drops must
indicate in the initial application whether the applicant seeks permit coverage that allows new structure sites that meet the
general permit standards to be added and afforded coverage under the same general permit at a later date.
Note: For additional locations authorized to be covered under an existing general permit, all general permit terms and
conditions will apply. General permit conditions are found in Section 4. If a person other than the original applicant for general
permit coverage wants to place structures at newly added locations under the existing general permit coverage, the new
applicant is responsible for ensuring that the structures at the new additional locations comply with all applicable general
permit standards and is responsible and liable for those new structures.
b. An additional permit fee is not required to place fish stick structures at additional locations under an existing general
permit coverage where the initial applicant was granted permit coverage for additional locations. A person seeking to place
additional structures under an existing permit coverage must provide to the Department a request containing all the following:
i. The docket or identification number of the initial general permit coverage to which you seek to add new locations.
ii. First and last name of applicant seeking coverage of new locations.
iii. Applicant's contact information, including but not limited to, street address, city, state, zip code, telephone, and e-
mail.
iv. A copy of the deed or similar proof of ownership of the site where the activity will occur. If you do not own the site,
also include proof of any notice(s) and permission(s) required by Section IA, Standards 2 and 3 of this General Permit.
v. Project diagram that shows all the following:
• The location of the project relative to the OHWM and the bank toe.
• The location of silt fences or any other sediment control devices.
• A description of materials and equipment to be used for the placement of the fish habitat structure, including the
location of the live trees to be used and the purpose and need for the placement.
• Maps of the project site that include all the following:
• Property lines for the property where the project will occur including identification of the riparian zone area from
the OHWM to the line of navigation.
• The location of the proposed fish habitat structure.
• Photographs that represent existing site conditions where the project will occur.
• Signature. The signature on any cover letter submitted for the purpose of applying to be covered under existing
general permit coverage will certify that the applicant meets the requirements under Section 3 of this general
permit.
3. Permit coverage for additional structure locations terminates 5 years from the issuance date granting coverage for the
additional structure locations.
PERMIT CONDITIONS
1. You must notify Nathan Walker at phone (715) 492-0243 or email nathan.walker@wisconsin.gov before starting
construction and again not more than 5 days after the project is complete.
2. You must complete the project as described on or before 03/22/2027. If you will not complete the project by this date,
there is no opportunity for an extension and you must apply for a new permit.
3. Your signed certification does not authorize any work other than what you specifically describe in your application and
plans, and as modified by the conditions of your signed certification. If you wish to alter the project, you must first obtain
written approval of the Department.
4. Before you start your project, you must first obtain any permit or approval that may be required for your project by
local zoning ordinances and by the U.S. Army Corps of Engineers. You are responsible for contacting these local and federal
authorities to determine if they require permits or approvals for your project. These local and federal authorities are
responsible for determining if your project complies with their requirements.
5. Upon reasonable notice, you shall allow access to your project site during reasonable hours to any Department
employee who is investigating the project's construction, operation, maintenance or permit compliance.
6. The Department may modify or revoke your signed certification for good cause, including if the project is not
completed according to the terms of the eligibility standards and conditions for the activity or if the Department determines the
activity is detrimental to the public interest.
7. You must post a copy of your signed certification at a conspicuous location on the project site, visible from the
waterway, for at least five days prior to construction, and remaining at least five days after construction. You must also have a
copy of your signed certification and plan available at the project site at all times until the project is complete.
8. Your acceptance of this letter and efforts to begin work on this project signify that you have read, understood and
agreed to follow all conditions of your signed certification.
9. You shall maintain the project in good condition and in compliance with the terms and conditions of your signed
certification, NR 323, Wis. Admin. Code and s. 30.206, Stats.
10. This project shall comply with all conditions identified in Wisconsin Administrative Code NR 323, and identified in the
Instructions for the General Permit application.
11. You must submit a series of photographs to the Department, within one week of completing work on the site. The
photographs must be taken from different vantage points and depict all work authorized by this permit.
12. You, your agent, and any involved contractors or consultants may be considered a party to the violation pursuant to
Section 30.292, Wis. Stats., for any violations of Chapter 30, Wisconsin Statutes, or this permit.
13. Construction shall be accomplished in such a manner as to minimize erosion and siltation into surface waters.
Erosion control measures (such as silt fence and straw bales) must meet or exceed the technical standards of ch. NR 151,
Wis. Admin. Code. The technical standards are found at: http://dnr.wi.gov/topic/stormwater/standards/const standards.html.
14. All equipment used for the project, including but not limited to tracked vehicles, barges, boats, silt or turbidity curtain,
hoses, sheet pile, and pumps shall be de -contaminated for invasive and exotic viruses and species prior to use and after use.
The following steps must be taken every time you move your equipment to avoid transporting invasive and exotic viruses and
species. To the extent practicable, equipment and gear used on infested waters shall not be used on other non -infested
waters.
1. Inspect and remove aquatic plants, animals, and mud from your equipment.
2. Drain all water from your equipment that comes in contact with infested waters, including but not limited to tracked
vehicles, barges, boats, silt or turbidity curtain, hoses, sheet pile and pumps.
3. Dispose of aquatic plants, animals in the trash. Never release or transfer aquatic plants, animals or water from one
waterbody to another.
4. Wash your equipment with hot (>104° F) and/or high pressure water, - OR - Allow your equipment to dry thoroughly
for 5 days.
FINDINGS OF FACT
1. The Department has determined that your signed certification of the project site and project plans meet the standards
in s. 30.206, Stats. and ch. NR 323, Wis. Adm. Code., to qualify for this General Permit.
2. The proposed project will not injure public rights or interests, cause environmental pollution as defined in s. 299.01(4),
Wis. Stats., or result in material injury to the rights of any riparian owner, if constructed in accordance with your signed
certification.
3. The Department and the applicant have completed all procedural requirements, and the project as described in your
signed certification will comply with all applicable requirements of Section 30.206, Wis. Stats., and Chapters NR 102, 103, 150,
299, 310 and 323 if carried out as proposed.
4. The lake association has placed a series of fish habitat structures over recent years under other permit docket
numbers. This has been as part of a larger lake improvement effort under a DNR funded grant. Previous permits include: GP -
NO -2021-4-00368, GP -NO -2019-4-03565 and GP -NO -2019-4-03576.
5. The applicant proposes to place 16 fish sticks bundles at 8 different properties.
CONCLUSIONS OF LAW
1. The Department has authority under ch. 30, Wis. Stats., and ch. NR 323, Wis. Adm. Code, to grant approval for the
construction and maintenance of this project.
2. The Department has complied with s. 1.11, Wis. Stats.
Denied by:
Date of Denial:
Reason for Denial:
Date Denial Letter Mailed:
Approved by; —
Condition(s):
❑ Must meet and ma
overhangs.
Date of Approval:
setbacks from furthest extension of structure including eaves and
0 For personal storage only.
❑ For personal residence only.
fLl,Not for human habitation or sleeping purposes.
own/State/DNR/Federal may require permitting
Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction.
❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction (if applicable).
Use best management practices to limit and prevent erosion during construction.
❑ This permit cannot be transferred if property is sold.
❑ A Bayfield County Health Dept permit is required.
❑ Check with Town regarding room tax.
❑ Short -Term Rental is for a maximum occupancy of persons.
❑ Sign must meet the requirements of Article E of the Bayfield County Zoning Ordinance.
❑ To be constructed per plan.
0 Adhere to privy agreement.
❑ Temporary permit allowing existing structure for a period of less than 1 year.
❑ RV may not be used for permanent residence or storage.
❑ RV allowed for
❑ RV must be removed by
❑ No sewer and pressurized water allowed in the structure.
❑ No plumbing or plumbing fixtures allowed.
❑ No additional sleeping areas allowed without obtaining necessary sanitary permit(s).
❑ Land use permits shall be required for any new residence, any building or structure erected,
relocated, rebuilt, or structurally altered
0 Land use permits shall be obtained prior to the initiation of construction or a change in land use
❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are
required
❑ Sanitation requirements must be met (if applicable)
❑ Additional conditions may be placed and need to be adhered to at the time of permit issuance
Other C nditions: / / �I
��r5��� %d G(/tri �.0 %1,G /�//>� c/hrjr���rt��e5lrra irz
/fi ,c -t 6,44aA to, f%R G6saryl Pcrr..'1` �rp-�,uop,?on2-/�- co6'W, J/ d.'eS m
/ vo 4 , r r
ua7lnng an lw,e/awd ,Q l//
l �/o J / I i% / vnc/ /f, s 7v p at %`drti[t`! �% /.
VaC�fa `�°' ¢iH i/�,�IO.A2J �f rn�`�i2 c/b,'e/n Ob i'ffr 5 %`e Rld�d/Cie L G
Land Use Permit Application Review Checklist
Submission #:
What zoning district is the project located in?
-1 ❑ R-2 ❑ R-3 ❑ R-4 ❑ R-RB ❑ C ❑ 1 ❑ M ❑ A-1 ❑ A-2 ❑ F-1 ❑ F-2 ❑ W ❑ M -M
❑ Yes 2'clo
Is lot substandard (does not meet current zoning dimensional requirements)?
Deed of record:
❑ No
Is the project located in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR
_V(es
landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)?
❑ Yes j]4Poo
Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of
navigable waterway)
❑ Yes o
Is the project located in the Floodplain?
Zone:
❑ Yes 0
Are there wetlands on the property?
❑ Yes 2o
Is project associated with a nonconforming use or structure?
❑ Yes No
Is project associated with a variance?
Case #:
❑ Yes id0
Is project associated with a Special B or Conditional Use Permit?
Permit #:
❑ Yes Ll6
Is the project associated with a Special A Use Permit?
Does the project require sanitary?
❑ Yes No
0 Existing ❑ New ❑ Intercept 0 Reconnect 0 Non -Plumbing ❑ Public
Sanitary Permit #: _
❑ Yes o
Does the project require mitigation?
Implementation Deadline: Date of Compliance:
❑ Yes 21io
Does the project require an affidavit?
Affidavit #:
❑ Yes o
Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback?
❑ Yes No
Did applicant/property owner mark lot line(s), if project is within 30 feet of required setback?
Project use is?residential 0 Commercial O Municipal
Project type is? ❑ New Construction 0 Addition/Alteration 0 Change Use ❑ Relocate ❑ RV Placement ❑ Sign
❑ Establishing a Business O Temporary ❑ Shoreland Grading her, describe: /— %iee /(9
Structure Type is: O Residence ❑ Principal Structure ❑ Accessory Structure ❑ Boathouse (one story only)
❑ Open-sided/Screened Str cture (gazebo, etc.) ❑ Stairway to navigable waters ❑ Mobile Home
❑ Shipping Container Other, describe cY1c,p - 77ee a/rri
Total Sq. Ft. of Project: Number of Stories: Overall Height:
Calculated Fee Category: ,V9 c
❑ Residential Principal Structures - $0.75/square foot (minimum $125)
❑ Habitable Residential Accessory Structures - $0.50/square foot (minimum $75)
❑ Non -Habitable Residential Principal and Accessory Structures - $0.20/square foot (minimum $75)
❑ Commercial/Municipal Principal Structures - $0.75/square foot (minimum $125)
O Commercial/Municipal Accessory Structures - $0.20/square foot (minimum $75)
Calculated Fee Amount:
Additional Fees: O Return Inspection ❑ Land Use Revisions 0 Special Use Permit- Class A ❑ After -the -Fact (ATF)
❑ Floodplain 0 Shoreland - Impervious Surface ❑ Shoreland - Non -Conforming, etc. 0 Tower Siting/Collocation 1
❑ Tower Collocation 2 ❑ Metallic Mine
ATF Fee Amount:
Inspected by: c��
Date of Inspection: /
OZ
Re -Inspected by:
Date of Re -Inspection:
Town, City, Village, State or Federal
Permits May Also Be Required
Substandard - No / Nonconforming - No
Shoreland — Yes I Impervious Surface - No
Floodplain - No / Wetlands - No
Mitigation - No / Affidavit #:
LAND USE - X
SANITARY -
SPECIAL A - S
SPECIAL B/CONDITIONAL -
BOA -
BAYFIELD COUNTY
PERMIT
WEATHERIZE AND POST THIS PERMIT
ON THE PREMISES DURING CONSTRUCTION
No. 25-0021 Tax IDs: 16995; 16991; 16992; 16971; 17001; 16951; 16954; 16999; 17000; 24377; 24388; 24387;
24378; 24417; 24418; 24462; 24423; 24390; 36588; 25106; 24677; 24684; 24866; 36501; 24867; 25244; 24035
Issued To: Namakagon Lake Association Inc., c/o Ted Peichel
Locations: See back of card
Towns of Cable & Namakagon
Legal Descriptions: See back of card
Vegetation management
For: Fish sticks - I tree drop per tax parcel for fish habitat
(Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any
future expansions or development would require additional permitting.
Condition(s): See back of card
NOTE: This permit expires two years from date of issuance if the authorized construction
work or land use has not begun.
Changes in plans or specifications shall not be made without obtaining approval.
This permit may be void or revoked if any of the application information is found
to have been misrepresented, erroneous, or incomplete.
This permit may be void or revoked if any performance conditions are not
completed or if any prohibitory conditions are violated.
Tracy Pooler
Authorized Issuing Official
January 17, 2025
Date
Condition(s): Town/State/DNR/Federal may require permitting
Use best management practices to limit and prevent erosion during construction.
This permit is to allow for the installation of the shoreland restoration project associated with DNR General
Permit GP -NO -2022-4-00634. It does not authorize any shoreland grading and filling. Any vegetation destroyed,
damaged or removed during the installation of the project is to be restored with like vegetation and maintained
and the shoreland buffer is to be remain in a natural condition.
Locations: S34 - T44N - R06W; S34 - T44N - R06W; S34 - T44N - R06W; S33 - T44N - R06W; S34 - T44N - R06W; S33 - T44N -
R06W; S33 - T44N - R06W; S34 - T44N - R06W; S34 - T44N - R06W; S03 - T43N - R06W; S03 - T43N - R06W; S03
- T43N - R06W; S03 - T43N - R06W; S04 - T43N - R06W; S04 - T43N - R06W; S09 - T43N - R06W; S04 - T43N -
R06W; S04 - T43N - R06W; S21 - T43N - R06W; S14 - T43N - R06W; S14 - T43N - R06W; S14 - T43N - R06W; S24
- T43N - R06W; S13 - T43N - R06W; S24 - T43N - R06W; S13 - T43N - R06W; S18 - T43N - R05W
Legal Descriptions: PAR IN GOVT LOT 1 DESC. IN V.547 P.2; LOT 1 CSM #738 V.5 P.130 (LOCATED IN GOVT LOT 2); LOT 2 CSM
#738 V.5 P.130 (LOCATED IN GOVT LOT 2); SW SE IN V.788 P.853 611 IM 2004R-496685; PAR IN GOVT LOT 3
IN DOC 2019R-579169; PAR IN GOVT LOT 5 IN DOC 2019R-579169; PAR IN GOVT LOT 5 IN V.457 P.234 610A4;
LOT 1 CSM #540 IN V.4 P.80 (LOCATED IN GOVT LOT 3) IN 2016R-566118 (SHARON R K BOWEN TRUST DTD
10/20/2016); LOT 2 CSM #540 IN V.4 P.80 (LOCATED IN GOVT LOT 3 SEC 34 & GOVT LOT 5 SEC 35-44-6) IN
2016R-566119 (SHARON R K BOWEN TRUST DTD 10/20/2016); LOT 1 CSM #799 IN V.5 P.248 (LOCATED IN GOVT
LOT 3) IN V.1075 P.20; 2 PAR IN GOVT LOT 3 DESC IN V.1075 P.20; PAR IN GOVT LOT 3 IN V.1011 P.75 LESS
PART OF LOT 1 CSM #1174 V.7 P.222 318C IN DOC 2024R-603254; LOT 2 CSM #799 IN DOC 2024R-603254;
PAR IN GOVT LOT 6 IN V.1061 P.339; PAR IN GOVT LOT 6 IN V.1061 P.767; PAR IN GOVT LOT I IN V.176 P.596
OR V.484 P.249LE LESS THAT PORTION DESC IN DOC 2019R-577455 (FAMILY TRUST CREATED UNDER THE
RICAHRD R WANASEK & SANDRA WANASEK REV TRUST DTD 02/11/1992) IN 2004R-493348; GOVT LOT 8
LYING WEST OF JACKSON LAKE CHANNEL IN 2022R-595471; PART OF GOVT LOT 1 LYING WESTERLY OF
JACKSON LAKE CHANNEL IN V.532 P.48 & PART OF LOT 7 W OF CREEK IN 2022R-595471; LOT 2 CSM #762 IN
V.5 P.178 (LOCATED IN GOVT LOT 1) IN V.1093 P.242 & PART OF LOT 3 CSM #762 DESC IN V.1097 P.88
(ROBERT & CORINNE RASMUSSEN TUST DTD 12/30/08) IN DOC 2023R-600735; NAMAKAGON LAKE SHORE
SUBDIV LOT 39 IN V.1068 P.960 & 961; GOVT LOT 5 (MFL-CLOSED 25 YRS-YR OF ENTRY 2017); PAR IN GOVT
LOT 2 IN DOC 2018R-572405 (ERIC M ROTTIER TRUST DTD 03/01/2018); LOT 1 CSM #1052 V.6 P.392 (LOCATED
IN GOVT LOT 1); LOT 4 CSM #1810 IN V.10 P.336 (LOCATED IN GOVT LOT 3 SEC 13 & GOVT LOT 1 SEC 24) IN
V.1098 P.283; LOT 2 CSM #1052 V.6 P.392 (LOCATED IN GOVT LOT 1) IN V.1042 P.106; SUB -DIVISION OF LOT
30 OF NAMAKAGON LAKE SHORE PART OF LOTS 4,5 & 6 IN DOC 2017R-570448 (LOT 3 OF CSM V.3 P.201);
PAR #8 IN GOVT LOT 7 SEC 13- 43-6 & GOVT LOT 2 IN DOC 2020R-583258 78K (HERBST TRUST DTD
04/11/2003)