Loading...
HomeMy WebLinkAbout24-0025RECEIVED AUG 2 2 2020 PlanningSa d eld Zoning Agency Cep G 6 2023 BAYFIELD COUNTY PLANNING AND ZONI — LgNdfW91irg SSA P15imit ' � Property Owner: Authorized Agent (if applicable): Hans & Lauren Dahl Telephone Number: Telephone Number: 715-209-1527 E-Mail Address: E-Mail Address: hans@dahlconstruction.com Mailing Address: Mailing Address: 76400 Paulson Rd. City, State, Zip: City, State, Zip: Washburn, WI.54891 Contractor: Telephone Number: E-Mail Address: Dahl Construction Co. 715-209-1527 hans@dahlconstruction.com Project Address (if different from mailing address): 76440 Paulson Rd. Washburn WI. 54891. (Right next door) Legal Description (if additional space is needed, attach a separate sheet): 172SC ZeV Section, Township, Range: ,-yNJ 20 s Town of: Washburn Tax ID #: Lot Size (Acres/Square Feet): 35562 1u , Project Description (Detached garage, deck, bunkhouse, mobile home, etc.): Accessory Building Next to Existing Building Proposed Use: Proposed Project: Structure Type: Foundation Type: Residential IZ New Construction ❑ Residence ❑ Basement 10 Commercial ❑Addition/AIteration 10 Accessory ❑ Crawlspace ❑ Municipal ❑ Change/New Use ❑ Other (explain) ❑ Slab ❑ Relocate (existing structure) 10Other Post Frame Building Gravel Flwr Area to nearest square foot Outside dimensions including unfinished area attached Paralaes and above larade decks or orches Basement: I" Floor: 2"" Floor: Floor: Total Square Footage: Overall Height (finished grade to peak): Fair Market Value of project upon completion 7500 22' 1 (to nearest dollar):100,000 1) Will this be the first structure on the site? ❑ Yes IZ No 2) What is the total number of bedrooms on the property once this project is complete S ? 3) Is there a proposed/existing sanitary system on the property? ❑ Proposed - Type 10 Existing - Type Conventional 4) Will any of the following occur within the proposed project/structure? 2 New Electrical installation ❑ New Plumbing Installation ❑ Sleeping 5) Has the location of the proposed project been staked including structure, sanitary system, and well? la Yes ❑ No 6) If required, who marked the property lines? 121 Applicant/Property Owner ❑ Licensed Surveyor 7) Is the property in the shoreland, within 300 feet of a river/stream/landward side of floodplain or 1000 feet of a lake/pond/flowage? ❑ Yes IZ No ❑ Unsure 8) Is there wetland located on or near the property? ❑ Yes IZ No ❑ Unsure 9) Is there floodplain located on or near the property? ❑ Yes la No ❑ Unsure 10) Is this project associated with any of the following: ❑ Rezone ❑ Conditional Use ❑ Special Use ❑ Variance 11) Did you contact the town to see if any permits/requirements apply to your project? la Yes ❑ No 61 ass RECEIVED AUG 2 2 2023 eayfield Co. SITE PLAN + t x Structures - "'-=�� Inspection Status s" r DF. W r, Parcels ;� Maxar I Ba.�:: Ba ieid Count . WI - All applicable setbacks need to be shown on the site plan County Use Only — verified setbacks and noted below in feet Road Centerline/Right-of-Way 366.67 ft. ft. Notes/Comments: North Lot Line 435.88 ft. ft. South Lot Line 214.44 ft. ft. S-ake4 West Lot Line 437.04 ft. ft. East Lot Line 35 ft. y0 , ft. " '— l s 0cf r- S Septic/Holding Tank 312.52 ft. ft. Drainfield 312.52 ft. ft. Privy ft. fL Well 180.16 ft. ft. Existing Structure/Building 20 ft. C) fL Wetland Elevation of Floodplain ft. ft. Ordinary H igh-Water Mark (OHWM) ft. fL Other: ft. ft. NOTE: Please indicate "see attached" on this page if submitting site plan as a separate document. 6 RECEIVED AM 2 2 2023 Bayfield Co. Planning and Zoning Agency FLOOR PLAN Indicate Floor: ❑ Basement ❑ la Floor ❑ Loft ❑ 2n^ Floor ❑ 3" Floor ❑ Other All applicable dimensions need to be shown on the floor plan and noted below Floor with Porch I with Porch 2 with Deck I with Deck 2 with Attached Garage with emcee 100' Cold Storage Pole Building County Use Only Dimensions I Square X S -�'S ()Qsq. ft. 106 X s; sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. X sq. ft. ed" on thic nave if snhmittina nanr nlank ac a cenarnte dnrnment 75' I.1 RECEIVED LAND USE PERMIT APPLICATION REVIEW r h 2 Z ?0?3 LeyiWlu G0. The following items are included with the application: Planning and Zoning Agency IZ Site Plan Cd Building Elevations 10 Floor Plan/s 2 Fees All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary Permit, if required, issuance needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a permit will result in penalties. The local Town, Village, City, State or Federal agencies may also require permits. The construction of one- & two-family dwellings and new plumbing/electrical installation for residential use structures (accessory/principal) require review and approval by the local Uniform Dwelling Code (UDC) authority. All municipalities are required to enforce the UDC. If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all necessary approvals and recorded documents required to complete the project for which this permit is sought including requirements set forth in Wisconsin statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the properly is located, and all other rules, regulations and requirements pertaining to that Condominium Association. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources wetlands identification web page, dnr.wi.aov/topic/wetlands, or contact a Department of Natural Resources service center (715)685- 2900. I (we) declare that this applicati\whh any accompanying information, has bee amined by me (us) and to the best of my (our) knowledge and elief it is , and com e. I (we) acknowledge that 1, a am (are) responsible for the detail and accuracy of all inform ion that oviding and will be relied upon by Ba ie County in determining whether to issue a permit. 1 (we) further a ept liabmay be a result ayfield County relying n t information I (we) are providing in or with this application. 1 ( ) conofficials charge ith administering coun or inances to have access to the above - described property a[ an asonr a purpose of inspe n. Owner/s or Authorized NOTE: If you are sigi Address to Send Permit Date: 8/22123 this application i-tFc'ti for +ssisanca JAN 155 2024 Office Use: Agenda Item: 't Zoning District _E Meeting Date: �( ° P IAL.USE PERMIT Lakes Class �ti26 Notices Sent Fee Paid 'f WTJ I+� Bayfield County Planning and Zoning Dept. OCT U 2 2023 p_ P.O. Box 58 - Washburn, WI 54891�) �L CT Phone - 715 373-6138 sz, Z:ld ::: Fax - (715) 373-0114 ** Please consult AZA I Zoning prior to submitting this appl '* e-mail: zoning@bayfieldcounty.org The Undersigned hereby requests a Special Use Permit as follows: Property Pro e Hans & Lauren Dahl 76440 Paulson Rd Dahl Construction Co. Authorized Agent Hans Dahl Agent's Telephone 715-209-1527 Telephone same 715-209-1527 Written Authorization Attached: Yes ( ) No (x) Accurate Legal Description involved in this request (specify only the property involved with this application) PROJECT LOCAMN Legal Description: (Use Tax Statement) 35562 NF 1/4, SW 114, of ection 33 ,Township 49 N,Range 5 W Washburn 10.46 Description from Classification List I * 13 vt id i r1Lp, 6004 tai o f b +J,)c,"+ -t Lc)'G16'1(_ I Briefly state what is being requested and why: Additional Pole building for coldrr storage. Used to keep all equipment under shelter and secured. [,Y Sfi C1 Pole skr,4 U �4 `t--t- S- r(jgc o (- Cc- Gtr`cll O(«5io:161) GS-CIOV [y, THE FOLLOWING "MUST" BE INCLUDED WITH THIS APPLICATION (or will be returned forcompletion): 1. Completed Bayfield County Application for Permit 2. Pink Form with applicants portion filled out (Do Not Send or Give to Town Clerk) 3. Appropriate Fees - (1) Committee ($250); (2) County (see fee schedule) 4. A ($30) check payable to: Reg. of Deeds 5. Copy of your Deed; Copy of Current Tax Statement; and Copy of Flex Viewer (Map) 6. Plot Plan show the area involved, its location, dimensions and location of adjacent property owners) 7. Adjoining property owners names/addresses (see reverse side of this form) PINK FORM: Property Owner must send TOWN BOARD RECOMMENDATION (aka: TBA) to Zoning Office at the time of application deadline. (This form will be sent by the Zoning Department to the Town Clerk for their recommendation). Receiving Zoning Committee approval, does not allow the start of business or construction, you must first obtain your permit(s) from the Zoning Department. LIST ADJACENT PROPERTY OWNERS ON THIS FORM: Lm U 1 fM t!;� , Provide names and full addresses of the owners of all property abutting the`applie�anf� trdty and anyone within 300 feet. Note: Applicant is solely responsible for obtaining accurate, current names and addresses.) Attach separate sheet only if additional space is needed. (1) Laura K Maki (2) Nancy Hansen (3) Randi Dahl 924 E TR 201 27435 Paulson Rd. 172215 County Line Dr. Tiffin, OH. 448833 Washburn, WI. 54891 Rosholt, WI.54473 (4) Liz Tetzner (5) Karen Deschane (6) Robert & Monique Mattson 76445 Paulson Rd. Washburn, WI.54891 Michael Mckenna 76370 Paulson Rd. Washburn, WI. 54891 15967 State Hwv 13 t Gay Mills, WI. 5463.1 27265 S. Mavle Hill Rd Washburn. WI. 54891 (8) Jeff 7 Jennifer Banowetz (9) 76360 Paulson Rd Washburn, WI. 54891 (10) (11) (12) Have you consulted with an AZA and/or Zoning Dept. prior to applying for permit? Yes (x ) No ( ) 3 Property Owner's Signature Agent's Signature Agent's Address 76440 Paulson Rd. Date Washburn, WI. 54891 Property Owner's Mailing Address Any Changes involved with this application after issuance will require additional approval & issuance. Website Available www.bayfieldcounty.org/l 47 u/torms/applicabon/specialuse Revised June 2015 10/6/23, 8:41 AM ® Bayfield County Land Records and GIS 1.3 + 35562 X C. Show search results foc 35562 as ach Bayfield County Land Records and GIS 1.3 Lancl Records Home) (Help[ [Zoning Map] IFrP GIS Data] [Fun in Bayfie,..: Create Mailing Labels I Search by Draw Select by clicking or drawing on the map 1. Select parcels using one of the shape tools 2. Click the Export button at the bottom of the panel to generate labels (no need to click the Search button) 0 Search Search 1 parcels selected (4000 record maximum) Prim Labels Distance (feet): 300 Avery Labels Template: 5160 [§port Clear Map https://maps.bayfieldcounty.wi.gov/BayfielclWAB/ 1/1 Search Search 1 parcels selected (4000 record maximum) Prim Labels Distance (feet): 300 Avery Labels Template: 5160 [§port Clear Map https://maps.bayfieldcounty.wi.gov/BayfielclWAB/ 1/1 MCKENNA, MICHAEL J & ROLFSEN, LEA ELIZABETH TETZNER 76370 PAULSON RD 76445 PAULSON RD WASHBURN, WI 54891 WASHBURN, WI 54891 ROBERT L & MONIQUE A MATTSON 27265 S MAPLE HILL RD WASHBURN, WI 54891 RANDI M DAHL 172215 COUNTY LINE DR ROSHOLT, WI 54473 HANS S & LAUREN E DAHL 76440 PAULSON RD WASHBURN, WI 54891 LLOYD C & LAURA K MAKI 924 E TR 201 TIFFIN, OH 44883 BANOWETZ, JEFFREY M & FLAMENT- KAREN J DESCHANE NANCY L HANSON TRUSTEE BANOWETZ, JENNIFER 15967 STATE HWY 131 27435 PAULSON RD 76360 PAULSON RD GAY MILLS, WI 54631 WASHBURN, WI 54891 WASHBURN, WI 54891 Aerial Map 10/1312023, 10:05:26 AM 1:3,320 [7l 0 0.0d 0.08 0.16 mi Wetlands L--- i Approximate Parcel Boundary Building Footprint 2015 , Rivers Road Type a Building 0 0.05 0.1 0.2 km Town Baynew county � Resift oepamnwt Bayfield Cwnty2 iN Applwatwn h3ps:llmap baAeldc ty. r9a'1I 40RWABI Zoning Map 10/13/2023, 10:05:40 AM 1:3,320 Zoning Districts Rivers Building Footprint 2015 0 0.04 0.06 0.16 ml (F1)- Forestry -1 0 0.05 0.1 02 km Approximate Parcel Boundary ' Building —(A1)-Agdcultuml-1 Road Type Baymw cry � ovp t -�• Wetlands Town aayl carryZ UV MpKmtl n h"://.M"Ywa .ty „.ypaa NWW Legend Q Lake Class Areas Q Riverine/ditch Class Areas 0 Wetland Class Areas Wetland Class Points Q Dammed pond ❑. Excavated pond Fiiledldmin ul wetland Welland loo small to delineate ■ Filed excavated pond Filled Points 0 Wetland Class Areas Filled Areas Q Lake Class Areas 0 Riverine/ditch Class Areas 0 Wetland Class Areas Welland Class Points 0' Command pond Excavated pond Filledrdrein id wetland Y Weiland too small to delinealt, ■ Filled excavated pond Filled Points u Wetland Class Areas [� Filled Areas ♦ Welland Identifications and Confirmations Municipality State Boundaries LJ County Boundaries Major Roads — Interstate Highway — State Highway a US Highway County and Local Roads Notes 0.1 0 0.06 0.1 Miles DISCLAIMER The Information shown on Mese maps has been obtained form various sources, end are of varying age, reliability and machines. These maps are not intended to W used for navigation, nor are these maps an authoritative source of Information about legal land ownership or public access. No warranty, expressed or implied, is made regarding ao,uracy NAD_1983_FWRN_WisfAnsin_TM t. 3rgso applicahility for a particular use, complaisance, or legality of the information depicted on map. For more Information, see tie DNR Legal spaces web page: hhpa/draW.govlleg; r W O O r O / r r - '1/ i I AS CO)tNBR `� / N ! / NEI I py X • .l a 0 fn tw 4 '� M I ww - / 4 r ;f _ - i� nno r / i I / I i d / �••`/ , // //POWLEulaorq PARCEL 2, t0.99 ACRES /#KUMO PMR.Sgw fim �oF COST / rcmvmno a.Arn MCK Dom offftsm 141, — / 9"nmo MAVMCMn I I � A I _r/ r I r„ *w / VORAM rou e,Alna,a I � 1 1 r7N Siteplan 0 cz �Z d W H P i a.w LD. rtwA AS MOM YR oem.,,.xm R.,n. C100 r Additional Structure Driveway Permit Sketch Hans & Lauren Dahl 76440 Paulson Rd, Washburn WI 54891 715-209-1527 (c)i,HARsedahlconst.uction.com ..... Aerial Imagery 2022 10 .5 Acres (Part south of Paulson Rd of W% NE%SW% Section 33 T.49N R.5W) 76440 Paulson Rd Tax ID: 35562 --► N 300 Feet ........., sk M M m_ M v . RECeivED Additional Structure Driveway Permit Hans & Lauren Dahl 76440 Paulson Rd Washburn WI 54891 715-209-1527 (c); Hans@dahlconstruction.com LIDAR Image Topography (10-foot contours) 10 .5 Acres (Part south of Paulson Rd of W% NE%SW% Section 33 T.49N R.5W) 76440 Paulson Rd Tax ID:35562 .... .. �r...v 3 014546 W � ���,�• 288.04' X D '. Z Z� 99 w QQ V+ r u$ D �` ' M M Z New Building am r rn OCT 0 2 [U�3 BaYftd Co Manning 2nd --► N 300 Feet rn •N ..r�.y N t b 9 E 0. ' ...........................................1281.99' . ......................................... .\....d T . L r Additional Structure Driveway Permit Hans & Lauren Dahl 76440 Paulson Rd Washburn WI 54891 715-209-1527 (c); Hans@dahlconstruction.com CD �a n General Soil Groups o a N 10.5 Acres (Part south of Paulson Rd of 2 o o M WY2 NE%SW% Section 33 T.49N R.5W) W d 76440 Paulson Rd 2 Tax ID: 35562 300 Feet Additional Structure Driveway Permit Hans & Lauren Dahl 76440 Paulson Rd Washburn WI 54891 715-209-1527 (c); Hans@dahlconstruction.com 35 n 1 DESCHANE 38170 :REY M ID# 31 BERT L ID# 31 Neighboring Property Owners Topography (10-foot contours) 10 .5 Acres (Part south of Paulson Rd of W% NE%SW% Section 33 T.49N R.5W) 76440 Paulson Rd Tax ID: 35562 IQUE A S� �a i HANG 5 & LAUREN E'Di Tex ID# 35562 RANDI M�DAHL / Tax ID#36541 31153 LLOYD C & LAL Tax ID# 31155 MICHAEL'1 MCKENNA Tax ID#31160 :u ran n 7 N o CD 0 r§{ o m N 36bFeet N 2 NATHAN M RUDOLPH f �� Tax ID#34769 ( 1 GERALDL THOMAS G BAUMGARTEN Tax ID# 31169 i' THOMAS G BAUMGARTEN Tax ID# 31171 , _� �'�:' J+ •r�:�� si7s�srYeW''i?S y.'y§�S t�' �yR�ir;: +'llR�w :..y� .�v�qr.�•' � �+'��f'R.� °t c. ESye �; y.-;pb5�?: s =- r .<-il� i5i 'S X+Q y ... .,. y� .. lk >x � ,, r, � ".., Lauren E Dahl 76400 Paulson Road Washburn, WI 54891 August 29, 2023 Alessandro Hall I Assistant Zoning Administrator Bayfield County Planning and Zoning Department 117 E 5th Street, PO Box 58 Washburn, WI 54891 Phone: 715-373-3517 Email: alessandro.hall@bavfieldcountv.wi.pov Eayfield Co. PLnd.-. _ __. _ sr,cy Re: Permitting for 76440 Paulson Road, Washburn, WI 54891 To Bayfield County Planning and Zoning, As co-owner of the above referenced property, I am aware that Hans Dahl is pursuing securing building permits for this location and he is authorized to seek and procure permits on our behalf. Sin&erely, 1/Laauuren . Dahl, RA Copies: File Initials CHECKLIST 1) ❑ REZONE HAS BEEN DATE STAMPED (Clerk's Office should make a copy of packet) 2) '9 Application is DATE STAMPED 3) ❑ Land Use is DATE STAMPED 4) Is Lakes Classification filled in (upper left-hand corner of application) 5) Is Zoning District filled in (upper left-hand corner of application) 6) ,I�J Copy of Recorded Deed is attached. All pages are needed 7) ❑ Is there more than 1 Deed to the property? If Yes -all deeds need to be attached 8) Application is filled out in Deed Holders Name? 9) J Copy of Tax Statement is attached (Does Name(s) Match Application?) 10) Tax Statement matches Ownership on Deed and Application 11) Pink Form for Town Recommendation is attached 12) Legal description on Deed matches Application 13) ( Legal description on Land Use is the same as Application 14) Legal description on Pink Form is the same as Application 15) Site Address is filled out on Application 16) Site Address is filled out on Land Use 17) Site Address is filled out on Pink Form 18) Application is signed 19) 9 Land Use is signed 20) Mailing Address of Applicant is filled out on back of form 21) Describe exactly what they are asking for on the front of application (DO NOT put see attachment). 22) V Classification List is filled out on the Application 23) ❑ Authorized Agent signed a. ❑ (is it a corporation, etc?) if so; ❑ Verification of position is attached 24) Letter of authorization is included 25) ❑ Agents mailing address is filled out (we need this for mailing packets) 26) Adjacent Property Owners are listed on back of application or attached 27) All addresses are filled out for Adjacent Property Owners (remember within 300' and outside perimeter) Include Tribal when they are within Reservation Land even thou its privately owned 28) 5 Parcel Map I Map Viewer showing property and adjacent property owners 29) Z Acreage Amount is filled in an Application and -© Land Use 30) ❑ Volume and Page is filled out on Application and ❑ Land Use (Turn Over) 31) Plot plan is attached (MUST SHOW ALL REQUIREMENTS) a. (North) is shown on plot plan b. Setbacks are shown on plot plan Z North Lot Line South Lot Line ® East Lot Line West Line Road (Town, State/Fed, Private, etc.) Septic Well Lake(s) ❑ Wetland(s) ❑ Other c. Lot Dimensions are shown on plot plan (i.e. 1,320 ft or 300' x 600') d. Building Dimensions are shown on plot plan (i.e. 24' x 26') ❑ Residence ❑ Decks ❑ Porches ❑ Garages, etc.) 32) Application Fee Paid and ❑ ATF is Paid (if applicable) a. Land Use Fee is Paid and ❑ ATF is Paid (if applicable) b. IKIAffidavit Fee Paid (Reg. of Deeds) 33) Rezones a. Plot plan show zoning districts and adjacent property owners names b. Subject property must be marked what it is going from and to (i.e. R-1 to R-RB) 34) % Wisconsin Wetland Inventory Map is attached 35) 0 Cost of Construction is filled in on Land Use 36) ❑ EIA--6 copies of EIA are attached (if required) 37) Y Data Base (Access) has been reviewed to verify property is code compliant a. X All Structures have been permitted b. N1 Sanitary Permitted YWhen? { 6lz%16 C. �z No violations Sanitary, etc.) Ulformslcoverlottersforpacketslchocklisfforcompleteappl ications RECEIVED OCT U 2 2023 State Bar of Wisconsin Form 3-2003 QUIT CLAIM DEED Sayfield Co. Plannin ntlu7tneuLtluihber Document Name THIS DEED, made between HANS S. DAHL ("Grantor," whether one or more), and Hans S. Dahl and Lauren E. Dahl, husband and wife, with rights of survivorship marital property ("Grantee," whether one or more). Grantor quit claims to Grantee the following described real estate, together with the rents, profits, fixtures and other appurtenant interests, in Bayfield County, State of Wisconsin ("Property") (if more space is needed, please attach addendum): (SEE ATTACHED EXHIBIT A) Dated its, (1 , 2019 DENISE TARASEWICZ HAYFIELD COUNTY, WI REGISTER OF DEEDS 2019R-578255 07/16/2019 10:55AM TF EXEMPT M: aM RECORDING FEE: $30.00 PAGES: 2 Recording Arcs Name and Return Address Spears, Carlson & Coleman, SC PO Box 547 Washburn, Wit 54891 04-050-249-05-33 3 01-000-22000 Parcel Identification Number (PIN) This is not homestead property. plq (is not) (SEAL) ` �y _� �\ (SEAL) • • HANS S. DAHL (SEAL) (SEAL) AUTHENTICATION ACKNOWLEDGMENT Signature(s) STATE OF WISCONSIN ) authenticated on _ y HAYFIELD COUNTY) Personally came before me on 34gt i S , 2019 ' the above -named HANS S. DAHL TITLE: MEMBER STATE BAR OF%�N (if not, 0"� p to me known to be the person(s) who executed the foregoing authorized by Wis. St tl A6') •., J=, instrument and acknowledged the same. THIS INSTRUMENT DRAFJD 6Y#0 R%' » F C=c�Ss 'Cur �4 Atty.JohnELCorlson, SBN 050j63 —•— Notary Public, Stt of Wisconsin Spears, Carlson &Coleman, C Wa My commission (is permanent) (expires: txn e C1 III 4 er out bt a'ated or acknowledged. Both art not aetemary.) r" NOTE: THIS IS ASTA��DIFICATION TO THIS FORM SHOULD BE CLEARLY IDENTIFIED. QUIT CLAIM DEED c"N,,,,•N�w O3 STATE BAR OF WISCONSIN FORM NO.3-2063 -Type name brow signatures_ WFO-MO- tq [ F. • (a0n76%2021 • WepeOrOmu.. RECEIVED our 0 2 2023 Sayfield Co. Panning and Zoning Agency EXHIBIT A That part of the West Half of the Northeast Quarter of the Southwest Quarter (W '/z NE'/4 SW '/4). Section Thirty-three (33), Township Forty-nine (49) North, Range Five (5) West, in the Town of Washburn, Bayfield County, Wisconsin, lying south of the centerline of Paulson Road, and described as follows: To locate the Point of Beginning, commence at the W '/4 corner of said Section 33 and run N 89°46'58" R, 1321.33 along the E-W '/4 line of said Section 33, to a 1-1/4" iron pipe at the CW 1/16 comer. Thence leaving said E-W '/4 line and along the west line of said NE %4 of the SW '/., S 01005'46" E, 1303.34 feet to a 1-1/4" iron at the SW 1/16 comer and the Point of Beginning. Thence from said Point of Beginning by metes and bounds: N 89°46'31" E, 660.90 feet along the south line of said NE'/4 of the SW '/4 to a 1-1/4" iron pipe. Thence leaving said south line, N 01*05'09" E, 1281.99 feet (passing through a 1-1/4" iron pipe at 1248.24 feet) to the centerline of Paulson Road. Thence along said centerline, 199.00 feet, southwesterly, along the arc of a curve to the left, having a radius of 150.98 feet, a central angle of 75131'08" and a chord which bears S 44°46'26" W and measures 184.91 feet. Thence 315.74 feet, southwesterly, along the arc of a curve to the right, having a radius of 528.84 feet, a central angle of 34°12'2T' W and measures 311.07 feet. Thence S 41°13' 19" W, 210.0 feet. Thence S 44015'00" E, 160,00 feet. Thence S 51°35'00" W, 130.00 feet. Thence S 55'10'00" W, 56.51 feet to the west line of said NE %4 of the SW %4. Thence leaving said centerline and along said west line, S 01005'46" W, 288.04 feet (passing through a 1-1/4" iron pipe at 39.84 feet) to the Point of Beginning. Drafted by: Spears, Carlson & Coleman, S.C. Washburn, W154891 PE r-NED C,CT U 2 20Z3 Eayfield Co. Planning anti Zor- JACK A. CARLSON JOHN R. CARLSON* LINDA I. COLEMAN ROBERT M. SPEARS (1913-2000) 'ALSO UCENSED IN MINNESOTA July 16, 2019 Hans Dahl Bresette Hill Rd Hayfield, WI 54814 BE. Quit Claim Deed DATE DESCRIPTION SPEARS, CARLSON Sa COLEMAN ATTORNEYS AT LAW 122 WEST BAYFlELD STREET PO BOX 547 WASHBURN, WISCONSIN 54891 TELEPHONE: 715-373-2628 FAX NO.: 715373-5716 STATEMENT 7/16/19 Legal Services rendered including: drafting Quit Claim Deed; E-Recording with Hayfield County Register of Deeds office. CABLE OFFICE MCKINNEY BLDG. COUNTY RD M CABLE. WI TELEPHONE: 715-798-3236 AMOUNT $125.00 Total Due: $ 125.00 8/29/23, 7:53 AM Novus-Wisconsin Access rev. 12.0206 Real Estate Bayfield County Property Listing Today's Date: 8/29/2023 S Description Updated: 3/19/2021 Tax ID: 35562 PIN: 04-050-2-49-05-33-3 01-000-22000 Legacy PIN: Map ID: Municipality: (050) TOWN OF WASHBURN STR: S33 T49N R05W Description: THAT PART OF THE W 1/2 NE SW LYING S OF PAULSON RD DESC IN DOC 201911- 578255 Recorded Acres: 10.460 Calculated Acres: 0.000 Lottery Claims: 0 First Dollar: Yes Zoning: (F-1) Forestry-1 ESN: 130 r Tax Districts Updated: 1/13/2010 1 STATE 04 COUNTY 050 TOWN OF WASHBURN 046027 SCHL-WASHBURN 001700 TECHNICAL COLLEGE r y Recorded Documents Updated: 1/13/2010 © QUIT CLAIM DEED Date Recorded: 7/16/2019 201911-578255 O QUIT CLAIM DEED Date Recorded: 11/26/2018 2018R-575497 ® PERSONAL REPRESENTATIVES DEED Date Recorded: 10/8/2009 200911-529204 1027-447 Property Status: Current Created On: 1/13/2010 2:31:17 PM a2 Ownership Updated: 3/19/2021 HANS S & LAUREN E DAHL WASHBURN WI Billing Address: HANS S & LAUREN E DAHL 76440 PAULSON RD WASHBURN WI 54891 Mailing Address: HANS S & LAUREN E DAHL 76440 PAULSON RD WASHBURN WI 54891 P Site Address * indicates Private Road 76400 PAULSON RD 76440 PAULSON RD M Property Assessment 2023 Assessment Detail Code GI -RESIDENTIAL G&PRODUCTNE FOREST WASHBURN 54891 WASHBURN 54891 Updated:2/24/2022 Acres Land Imp. 2.000 7,000 406,800 8.460 15,200 0 2-Year Comparison 2022 2023 Change Land: 22,200 22,200 0.0% Improved: 406,800 406,800 0.0% Total: 429,000 429,000 0.0% R Property History Parent Properties Tax ID 04-050-2.49-05-33-3 01-000-20000 31154 HISTORY ©Expand All History White=Current Parcels Pink=Retired Parcels ® Tax ID: 31154 Pin: 04-050-2-49.05-33-3 01-000-20000 Leg. Pin: 050105606990 35562 This Parcel Parents Children hugs:Itnovus.bWieldcounty.wi.gov/access/master.asp?paprpid=35562 1/1 BATFIELD CORM PLANNING AND ZONING DEPARTMENT Bayfield County Courthouse 117 East Fifth Street Post Office Box 58 Washburn, WI 54891 Telephone: (715) 373-6138 E-mail: zonina(ftavfieldcountv.wi.aov Fax: (715) 373-0114 Web Site: www.bavfieldcountv.wi.aov/zonina October 25, 2023 HANS S & LAUREN E DAHL 76440 PAULSON RD WASHBURN WI 54891 We are sending you this letter to advise you of the upcoming Bayfield County Planning and Zoning Committee Public Hearing and Meeting. This notice is also being sent to adjoining landowners; owners of land within 300 feet of the proposed use; the town clerk of the town in which the property is located, and the town clerk of any other town within 300 feet of the proposed use. This written notice is in regard to a Special Use Application for Building Contractor Equipment & Storaae Use submitted by HANS S & LAUREN E DAHL. To obtain information regarding this request; please visit our web site: hhtt://www.bayfieldcounty.wi.gov/198/Planning-Zoning-Committee. Scroll down to Agendas & Minutes. Click on Most Recent Agenda. This matterwill be addressed during the 'business portion' by the Bayfield County Planning and Zoning Committee at their meeting on Thursday. November 16, 2023 at 4:00 pm in the County Board Room of the Bayfield County Courthouse, Washburn Wisconsin. * This is a 'business item' and the Committee may or may not allow the public to speak and/or comment. Be advised; the Town of Washburn will consider this application prior to the Planning and Zoning Committee meeting (please call the Town Clerk to verify the date and time of their meeting and the date and time of the Plan Commission Meeting). If you wish to comment on this matter, you are invited to write / email the Bayfield County Planning and Zoning Department. If any person planning to attend this meeting has a disability requiring special accommodations, please contact the Planning and Zoning Department 24 hours before the scheduled meeting, so appropriate arrangements can be made. Note: Written and digital input pertaining to any agenda items will be accepted until noon the day prior to the Planning and Zoning Committee Meeting (Section 13-141(b)(1) and 13-141A(b)(2)). Subsequent input must be delivered in person at the meeting. Any aggrieved party may appeal the Planning and Zoning Committee's decision to the Board of Adjustment within 30-days of the final decision. Sincerely, Bayfield County Planning and Zoning Department enc. public hearing notice cc: Town Clerk Adjacent Property Owners (8) Planning and Zoning Committee Members (5) Office File Packet File ** Footnote: Receiving approval from the Planning and Zoning Committee at the meeting does not authorize the beginning of construction or land use; you must first obtain land use application/permit card(s) from the Planning and Zoning Department k/debsdata/zc/coverletter/specialuse/ DAK/fig Sent (10/25/2023) BAYFIELD COUNTY PLANNING AND ZONING COMMITTEE NOVEMBER 16. 2023, 4:00 P.M. BOARD ROOM, COUNTY COURTHOUSE WASHBURN, WISCONSIN The Bayfield County Planning and Zoning Committee of the County Board of Supervisors will hold a public hearing on Thursday, November 16, 2023, at 4:00 P.M. in the Board Room of the Bayfield County Courthouse in Washburn, Wisconsin relative to the following: Jeffrey MA Dawn M Marsh request a conditional use permit (in a shoreland zone) to have two (2) multiple structures on a parcel consisting of: an existing 1-Story residence with loft (34'x32x20'H); with deck (34'x8'); and an existing garage (24'x24'x28'H) with Upper Level converted to a Residence (24'x38'x28'H). Property is an R-1 zoning district; a 2.46— acre parcel (Tax I D# 7830), described as Lot 1, CSM #1176 in V. 7 P. 226, Doc. #469382; in Section 31, Township 51 North, Range 6 West, Town of Bell, Bayfield County, WI. Immediately following the public hearing, the Bayfield County Planning and Zoning Committee may approve, modify and approve, or disapprove the proposed items and/or proposed amendments and formulate and adopt its recommendations to the Bayfield County Board of Supervisors with respect thereto (if applicable). Copies of all items, petition(s) and/or proposed amendments are available online httgs:Hbayfiieldcountv.wi.gov/198/Planning-Zoning-Committee. Scroll down to Agendas & Minutes. Click on Most Recent Agenda. All interested parties are invited to attend said hearing to be heard. Any person wishing to attend who, because of a disability, requires special accommodation, should contact the Planning and Zoning office at 373-6138, at least 24 hours before the scheduled meeting time, so appropriate arrangements can be made. Immediately after the public hearing, the Planning and Zoning Committee will hold its regular monthly meeting. If further information is desired, please contact the Bayfield County Planning and Zoning Department, at the Courthouse, Washburn, Wisconsin - Telephone (715) 373-6138 or visit our website: hftp://www.bayfieldcounlly.wi.gov/zoninq. Ruth Hulstrom, AICP I Director Bayfield County Planning and Zoning Department k/debsdatalzclphnotice/20231#11 nov Prepared by: (d)dak 10/23/2023-2:42pm); (f)10/24/2023-1:22pm) Proofed by. Zoning Committee i i a� Bayfield County Planning and Zoning Committee Public Nearing and Public Meeting Thursday, November 16, 2023 4:00 P.M. Board Room, County Courthouse, Washburn, WI • This meeting will be held in the Bayfield County Board Room. The public will be able to participate in the meeting in person or via voice either by using the internet link or phone number below. Microsoft Teams Meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 224 841 682 406 Passcode: YC4SS7 Download Teams I Join on the web Or call in (audio only) +1 715-318-2087..236830266* United States, Eau Claire Phone Conference ID: 236 830 266# Committee Members: Brett Rondeau, Chair, Jeff Silbert, Vlce Chair, Fred Strand, Charly Ray, Dennis Pocernich 1. Call to Order of Public Hearing: 2. Roll Call: 3. Affidavit of Publication: 4. Public Comment — [3 minutes per citizen] S. Review of Meeting Format — (Hand -Out Slips to Audience) 6. Public Hearing: (open for public comment) A. Jeffrey M & Dawn M Marsh (Bell) - Multiple Structures on a Parcel (Two (2) Residences) in an Residential-1 zone 7. Adjournment of Public Hearing: S. Call to Order of Planning and Zoning Committee Meeting: 9. Roll Call: 10.New Business: (public comments at discretion of Committee) A. 3effrey M & Dawn M Marsh (Bell) - Multiple Structures on a Parcel (Two (2) Residences) in a Residential-1 zone Agenda Review and Alteration B. Northern States Power Co/Xcel Energy/Hooper Con/Tim Larson (Port Wing) -- Relocating and Expanding Substation in a Commercial zone k/debsdatalzclagendal#11 nov Prepared by: dak((d)1012312023-3:37pm): (01012412023-1:13pm) Proofed By: REH Zoning Committee C. Hans & Lauren Dahl (Washburn) — Building Contractor Equipment & Storage consisting of (1) existing pole building for storage, office and occasional assembly and (1) proposed pole building used for cold storage/storage of equipment in a Forestry-1 zone 11.0ther Business D. Discussion and Possible Action regarding RV Placement Ordinance Amendment E. Minutes of Previous Minutes: (October 19, 2023) F. Committee Members discussion(s) regarding matters of the P & Z Dept. 12. Monthly Report / Budget and Revenue 13.Adjournment Ruth Hulstrom, AICP / Director Bayfield County Planning and Zoning Department N : Any aggrieved party may appeal the Planning and Zoning Committee's decision to the Board of Adjustment within -days of the final decision. Any person wishing to attend who, because of a disability, requires special accommodations, should contact the Planning and Zoning office at 373-6138, at least 24 hours before the scheduled meeting time, so appropriate arrangements can be made. Please Note: Receiving approval from the Planning and Zoning Committee does no authorize the beginning of construction or land use; you must ,first obiAn land use aRplicati-onjoermit cardW from the Planning and Zoning Department k/debsdatalzc/agendal#11 nov Prepared by: dak((d)10/23/2023-3:37pm); (t 10/24/2023-1:13pm) Proofed By: REH Zoning Committee TOWN BOARD RECOMMENDATION— SPECIAL USE - B (aka: TBA) \P When Town Board has completed this form, please mail to: Dglg Zoning Received: (stamp Here) RECE LIVE Bayfield County Planning and Zoning Department P.O. Box 58 - Washburn, At 54891 NOV 15 2023 NOV �t11` 3 Phone - (715) 373-6138 Web Site available: Fax — (715) 373-0114 �.bayfieldcounty.org/147 Saayfie Co. e-mail: zoning@bayfieldcounty.org PJwkV and z og ACenc7 �Y Z C"g Mrg and 2onirg Ag Applicants must give this (Pink) form to the Planning and Zoning Department with their application. Planning and ; Zoning Dept. must send form and copy of application to the Town Clerk. (It is requested that Board of Adjustment & Zoning ; Committee public hearing(s) and agenda item(s) receive Town Board's position prior to consideration of application.) ; THIS FORM MUST BE MAILED TO TOWN CLERK — BY ZONING DEPT. ' ---------------------------------------------------------------------------------------------------- Property owner Hans & Lauren Dahl I Pro a Address 76440 Paulson Rd. --------------------------------- Contractor Dahl Construction Co. Authorized Agent I j Washburn, WI. 54891 Agent's Telephone I Telephone 715-2 1527 Written Authorization Attached: Yes( ) No( ) j I Accurate Legal Description involved in this request (specify only the property involved with this application) I I NE 1/4 of _SUj 1/4, Section 33 Township 49 N., Range 5 W. Town of Washburn I Govt. Lot _Lot Block _ Subdivision I I Volume — Page of Deeds Tax I.D# 35562 f�9dir,'3 Acreage 10.46 Additional Legal Description: See r�rry(41e� c�eec� . I I I j Applicant: (State what you are asking for) Zoning District., F-1 Lakes Classification: Install another 75x100 pole building for cold storage and to secure all equipment currently on site. E.>(fSinc) Q61e dl(?d vs,?d 'Por ${orcrg�,CSP ZC'. Qnd accG$io,)Cd Q$SPMUy, L------------------------------ --------------------------------'--II-------[------------------------------------------------------------- We, the Town Board, TOWN OF k)a S tl u r Kr do hereby recommend to ❑ Table /`�'j Approval El Disapproval Have you reviewed this for Compatibility with the Comprehensive and/or Land Use Plan: This question applies to �►� Planning & Zoning Commit a Applications onto: it does not apply to Board of Adjustment Applications ❑ Yes ❑ No '"T nshl In detail clearly own Board's reason for recommendation of tabling, approval or disapproval) t ( Y g. Pp PP ) „�rPJen� roST ruKa-'Ca+'�—niy��nc, 4 1��, ��d rL4�1�r�al iyt('uC�S! , b THE FOLLOWING MUST BE INCLUDED WITH THIS FORM: Signed: `- G i Chairman: 1. The Tabled, Approval or Disapproval box checked 2. The Town's reasoning for the tabling, approval or disapproval Supervisor: 3. The Pink form returned to Zoning Department not a copy or fax Supervisor: Receiving Town Board approval, does not allow the start supervisor: of construction or business, you must first obtain your Clerk: , permit card(s) from the Planning and Zoning Department. ! Re-vised_Jufy 2918 ------------------ ' Town of Washburn Bayfield County 30015 County Highway C Washburn, WI 54891 715-373-2567 July 12, 2022 Bayfield County Planning and Zoning Committee PO Box 58 Washburn, WI54891 Dear Committee members, CEIVED NO 3 Bay6eld Co. rwa and zoning Agency RECEIVED NOV 15 2023 Bayfield Co. Plan N and Zoning AQWW The Washburn Town Board recommends approval of a Class B Special Use Permit for Hans and Lauren Dahl's proposed additional pole building in a Forestry 1 zoning district at 76440 Paulson Road (Tax ID#35562) provided that these conditions are added to the permit: • Place erosion control along the east dripline of the roof to prevent the fill from eroding at the back of the new building, and establish a dry swale between the building and the property line so that roof runoff will seep into the sandy soil on -site and not create gullies extending from the site to neighboring properties. • To maintain the forested appearance of this district, add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to provide a natural, vegetative screen along the road. • Place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly toward adjacent properties. • Maintain normal business hours for traffic and noise on site of 6:00 A.M. to 6:00 P.M. These recommended conditions are based on the following decision criteria for special use permits as listed in the County Zoning Ordinance: (2) Consistency with Town Comprehensive Plan.. (10) The prevention and control of water pollution (including sedimentation), air pollution and noise. (11) Existing topographic, drainage features and vegetative cover on the site. (13) The erosion potential of the site based upon degree and direction of slope, soil type, and vegetative cover. Sincerely, Sandra Raspotnik, Chair 75340 Pajala Road Washburn, W154891 RECEIVED Proposal Review Form RECEI D NOV 15 2023 Town of Washburn 4 2023 Bsykld Co. p,,,.�.M7omn0Age y Plan Commission aer co Bayfield County, Wisconsin r Proposed Project Information (from Applicant) Project Name: Hans Dahl Class B Special Use Permit for added pole building Project Description: New equipment storage pole bldg Project Location: NE '/4 of SW %4, Section 33 , Township 49 N, Range 5 W; Bayfield County Parcel Number(s):_04-050-2-49-05-33-3-01-000-2200 , Nearest Road & County Address Number: 76440 Paulson Rd. Owner(s): Hans & Lauren Dahl Owner Address: 76440 Paulson Rd, Washburn Wl 54891 Owner Phone & E-mail: (715) 209-1527, hans(a,dahlconstruction.com Owner's Agent: N.A. Agent's Address: N.A. Agent's Phone & E-mail: N.A. Relevant Policies in Town Comprehensive Plan Policy No. or Check if Chanter & Page Brief Summary of Proiect Consistency with Plan Consistent 8. Le Setback & vegetative screen maintains scenic character of forestry district ❑ pp.7-22,8-24 Develooment accommodates potential seeps in transitional soils ❑ 8.12 Promote home -based businesses compatible with rural character ❑ Drive Ord SA _Culvert, visibility. roadbed, and turn -around requirements ❑ Additional Review Comments of Plan Commission: Commission Recommendation(s): Commissioner's Review Date: 5 Nov 2023 Vote Result: 3 FOR I— OPPOSED (W Form Date: 2 April 2008 RECEIVED RECEll V NOV 15 2023 NO - 202> FWningBanndd honing A4 Y BaYfleld Co. •�•�w�{7 and Zonlnn A— BAYFIELD COUNTY PLANNING AND ZONING COMMITTEE NOVEMBER 16. 2023.4:00 P.M. BOARD ROOM, COUNTY COURTHOUSE WASHBURN, WISCONSIN The Bayfield County Planning and Zoning Committee of the County Board of Supervisors will hold a public hearing on Thursday November 16, 2023, at 4:00 P.M. in the Board Room of the Bayfield County Courthouse in Washburn, Wisconsin relative to the following: Jeffrey M & Dawn M Marsh request a conditional use permit (in a shoreiand zone) to have two (2) multiple structures on a parcel consisting of: an existing 1-Story residence with loft (34'x32x20'H); with deck (34'x8'); and an existing garage (24'x24'x28'H) with Upper Level converted to a Residence (24'x38'x28'H). Property is an R-1 zoning district; a 2.46— acre parcel (Tax ID# 7830), described as Lot 1, CSM #1176 in V. 7 P. 226, Doc. #469382; in Section 31, Township 51 North, Range 6 West, Town of Bell, Bayfield County, Wl. Immediately following the public hearing, the Bayfield County Planning and Zoning Committee may approve, modify and approve, or disapprove the proposed items and/or proposed amendments and formulate and adopt its recommendations to the Bayfield County Board of Supervisors with respect thereto (if applicable). Copies of all items, petition(s) and/or proposed amendments are available online https://bayfieldcounty wi oov/198/Planning-Zoning-Committee. Scroll down to Agendas & Minutes. Click on Most Recent Agenda. All interested parties are invited to attend said hearing to be heard. Any person wishing to attend who, because of a disability, requires special accommodation, should contact the Planning and Zoning office at 373-6138, at least 24 hours before the scheduled meeting time, so appropriate arrangements can be made. Immediately after the public hearing, the Planning and Zoning Committee will hold its regular monthly meeting. If further information is desired, please contact the Bayfield County Planning and Zoning Department, at the Courthouse, Washburn, Wisconsin - Telephone (715) 373-6138 or visit our website: http://www.bayfiieldcounty.wi.gov/zoning. Ruth Hulstrom, AICP I Director Bayfield County Planning and Zoning Department k/debsdata/zcJphnoLce12023/#11 nov Prepared by: (d)dak 10/2312023.2:42pm); (f)l0124/2023-1:22pm) Proofed by w Zoning Committee ECEIVED 23 f Ba kl Co. RECENED Bays eld County Planning and Zoning @oloi.w eeing Agency Public Hearing and Public Meeting NOV 15 2023 Thursday, November 16, 2023 4:00 P.M. mrom and fd ' ,genor Board Room, County Courthouse, Washburn, WI This meeting will be held in the Bayfield County Board Room. The public will be able to participate in the meeting in person or via voice either by using the internet link or phone number below. Microsoft Teams Meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 224 841 682 406 Passcode:YC4SS7 Download Teams I Join on the web Or call in (audio only) +1 715-318-2087. 236830266# United States, Eau Claire Phone Conference ID: 236 830 266# Committee A9emiierer Brett Rondeau, Chair, Jeff Silbert, Vice Chair, Fred Strand, Chady Ray, Dennis Pocernich 1. Call to Order of Public Hearing: 2. Roll Call: 3. Affidavit of Publication: 4. Public Comment — [3 minutes per citizen] S. Review of Meeting Format — (Hand -Out Slips to Audience) 6. Public Hearing: (open forpublic comment) A. Jeffrey M & Dawn M Marsh (Bell) - Multiple Structures on a Parcel (Two (2) Residences) in an Residential-1 zone 7. Adjournment of Public Hearing: 8. Call to Order of Planning and Zoning Committee Meeting: 9. Roll Call: 10. New Business: (public comments at discretion of Committee) A. Jeffrey M & Dawn M Marsh (Bell) - Multiple Structures on a Parcel (Two (2) Residences) in a Residential-1 zone Agenda Review andAiteration B. Northern States Power Co/Xcel Energy/Hooper Con/Tim Larson (Port Wing) — Relocating and Expanding Substation in a Commercial zone k/debsdata/zc/agenda/A11 nov Prepared by: dak((d)10123/2023-3:37pm); (f)10/2412023-1:13pm) Proofed By: REH Zoning Commidee C. Hans & Lauren Dahl (Washburn) — Building Contractor Equipment & Storage consisting of (1) existing pole building for storage, office and occasional assembly and (1) proposed pole building used for cold storage/storage of equipment in a Forestry-1 zone 11.0therBusiness D. Discussion and Possible Action regarding RV Placement Ordinance Amendment E. Minutes of Previous Minutes: (October 19, 2023) F. Committee Members discussion(s) regarding matters of the P & Z Dept. 12.Monthly Report / Budget and Revenue 13.Adjournment Ruth Hulstrom, AICP / Director Bayfield County Planning and Zoning Department Note: Any aggrieved party may appeal the Planning and Zoning Committee's decision to the Board of Adjustment within 0-days of the final decision. Any person wishing to attend who, because of a disability, requires special accommodations, should contact the Planning and Zoning office at 373-6138, at least 24 hours before the scheduled meeting time, so appropriate arrangements can be made. Please Note: Receiving approval from the Planning and Zoning Committee does no authorize the beginning of construction or land use; you must first obtain land use application/permit card(s) from the Planning and Zoning Department. k/debsdatalzdagenda/#11 nov Prepared by: dak((d)10/23/2023-3:37pm); (f)10/2412023-1:13pm) Proofed By: REH Zoning Commitlee NOV 15 2023 Bayfield C�. Pb October 25, 2023 BAYFRLD COHn PLUMG AND 10NNG DEPARTMENT � a Co. Iny and Zoning Bayfield County Courthouse 117 East Fifth Street Post Office Box 58 Washburn, WI 54891 Telephone: (715) 373-6138 E-mail: zonina(ftayfleldcountv.wi.aov Fax: (715) 373-0114 Web Site: www.bavfieldcountv.wi.aov/zoning HANS S & LAUREN E DAHL 76440 PAULSON RD WASHBURN WI54891 We are sending you this letter to advise you of the upcoming Bayfield County Planning and Zoning Committee Public Hearing and Meeting. This notice is also being sent to adjoining landowners; owners of land within 300 feet of the proposed use; the town clerk of the town in which the property is located, and the town clerk of any other town within 300 feet of the proposed use. This written notice is in regard to a Special Use Application for Building Contractor Eguipment & Storage Use submitted by HANS S & LAUREN E DAHL. To obtain information regarding this request; please visit our web site: http://www.bayfieldcounty.wi.gov/198/Planning-Zoning-Committee. Scroll down to Agendas & Minutes. Click on Most Recent Agenda. This matterwill be addressed during the 'business portion' by the Bayfield County Planning and Zoning Committee at their meeting on Thursday. November 16, 2023 at 4:00 pm in the County Board Room of the Bayfield County Courthouse, Washburn Wisconsin. * This is a 'business item' and the Committee may or may not allow the public to speak and/or comment. Be advised; the Town of Washburn will consider this application prior to the Planning and Zoning Committee meeting (please call the Town Clerk to verify the date and time of their meeting and the date and time of the Plan Commission Meeting). If you wish to comment on this matter, you are invited to write / email the Bayfield County Planning and Zoning Department. If any person planning to attend this meeting has a disability requiring special accommodations, please contact the Planning and Zoning Department 24 hours before the scheduled meeting, so appropriate arrangements can be made. Note: Written and digital input pertaining to any agenda items will be accepted until noon the day prior to the Planning and Zoning Committee Meeting (Section 13-141(b)(1) and 13-1-41A(b)(2)). Subsequent input must be delivered in person at the meeting. Any aggrieved party may appeal the Planning and Zoning Committee's decision to the Board of Adjustment within 30-days of the final decision. Sincerely, Bayfield County Planning and Zoning Department enc. public hearing notice cc: Town Clerk Adjacent Property Owners (8) Planning and Zoning Committee Members (5) Office File Packet File ** Footnote: Receiving approval from the Planning and Zoning Committee at the meeting does not authorize the beginning of construction or land use; you must first obtain land use application/permit card(s) from the Planning and Zoning Department k/debsdata/zc/coverletter/specia Iuse/ DAK/fig Sent (10/2512023) RECEIVED Proposal Review Form Xigtj6d 2023 Town of Washburn ��. Planning and ,WgPVW Plan Commission P Bayfield County, Wisconsin Proposed Project Information (from Applicant) Project Name: _Johnson driveway Project Description: Proposed driveway & potential residence in Forestry-1 zoning district Project Location: SE '/4 of SE %4, Section 32 , Township 49 N, Range 05 W; —S'/2 SE%4 Bayfield County Parcel Number(s): _ Tax ID #39119 . Nearest Road & County Address Number: _ On private access to 76135 Paulson Rd Owner(s): Craig E. Johnson Owner Address: _ 72418 327th Ave.. Lake City Minnesota 55041 _ Owner Phone & E-mail: 651-492-6462 (cell); credio@hotmail.com Owner's Agent: self Agent's Address: See above Agent's Phone & E-mail: See above Relevant Policies in Town Comprehensive Plan Policy No. or Check if Chapter & Page Brief Summary of Project Consistency with Plan Consistent Drive Ord SA Drainage, visibility, roadbed, and turn -around requirements 8.2a Protect land vulnerable to development 8. Le Setback & vegetative screen maintains scenic character of rural area p1 , pp.7-22,8-24_ Development accommodates potential seeps & erodibility of transitional soils ems - Additional Review Comments of Plan Commission: Development remains on relatively level ground downhill from steep and highly erodible bluff. Commission Recommendation(s): Recommend approval of drivewav permit • •Signatures Review Date: 05 November 2023 Vote Result: _ FOR OPPOSED Forth Date: 2 April 2008 Class B Special Use Permit Additional Structure Hans & Lauren Dahl 76440 Paulson Rd Washburn W154891 715-209-1527 (c); Hans@dahlconstruction.com Neighboring Properties & General Soil Groups 10 .5 Acres (Part south of Paulson Rd of W% NE'/<SWY4 Section 33149N R.5W) 76440 Paulson Rd m o < A o M v Tax ID: 35562 300 Feet N Maa�:� e C 0nir t=r'So!i a Wetland ® Sand Sand Over Clay L' .ESCHA NEt,:ia,,.,�_' Clay :ELF _. �.. _. .. •_ -__-, .. p�.. .. _. A -_ -_PH __T.._ EP LN 1 d fvi. FIL H i p Class B Special Use Permit Additional Structure Hans & Lauren Dahl 76440 Paulson Rd Washburn WI 54891 715-209-1527 (c); Hans@dahlconstruction.com Lei Engineering Drawing Submitted with county permit application 10 .5 Acres (Part south of Paulson Rd of W%: NE%SW% Section 33 T.49N R.5W) 76440 Paulson Rd Tax ID:35562 445 `/ / (� FIELD $ELD / /i � PARCEL Z,\ 10.99 ACRE' `I ! DINTI. C}I$lING � DECK i Ile / 1 Class B Special Use Permit Additional Structure Hans & Lauren Dahl 76440 Paulson Rd Washburn WI 54891 715-209-1527 (c); Hans@dahlconstruction.com —{ 1 n, LIDAR Image Topography (10-foot contours) 10 .5 Acres (Part south of Paulson Rd of W% NE%SW% Section 33 T.49N R.5W) 76440 Paulson Rd Tax ID:35562 N a M < o m� $ A MUM♦ N '� v 300 Feet 1AfT M n r-11 ` ri, t F2tlgt940Ge Ps epTx �„- r (. O m in o>� ?'� U1 011 4Lv 2 Class B Special Use Permit Additional Structure Hans & Lauren Dahl 76440 Paulson Rd Washburn W154891 715-209-1527 (c); Hans@dahiconstruction.com Proposed New Pole Building Submitted with county permit application 10 .5 Acres (Part south of Paulson Rd of W%: NE'/SW% Section 33 149N R.5W) 76440 Paulson Rd Tax ID:35562 Driveway Permit Application & Preliminary Development Plan Craig Johnson 72418 327th Ave., Lake City Minnesota 55041 651-492-6462 (cell) ; credjo@hotmail.com o rn m n Neighboring Properties N Z w Aerial Orthophoto (2020) v rn v 5.6 Acres (—S% SE% SE'/<SE% Section 32 T.49N R.5 On private access to 76135 Paulson Rd. Tax ID #39119 300 Feet N III Applicant's Name Applicant's Address Applicant's Email 6' Town of Washburn Driveway Permit Application Date Ip 6 �4Z �� ►�Cl��E�JG�tr _Phnne_�r S _G � -�Ifd2 roperty, Owner's Name 1 _ Address of proposed driveway 'TB0 11�55I�NC,F1 r� TjeRcrn'3� Section17-Tow n �}� Ranges Quarter/Quanrler E 7'&x!D s�JuiUEr Fn^Errt The driveway mill proNide access to State liighway _ County Highway _ Town Road Proposed Land Use of property S I rt 1-e 6g 14 if cs 1t6• � , Specify the erosion control procedures to be utilized Ji r +- C-UL)F_n the proposed Check the box for the type of d 'vew Check box if permanent driv ay is Signature of ApplicantllA.4 • Provide a sketch on the back of thi and length_ Indicate turnoffs, if qt Skecificationst E G. depths and types of materials t. T n Temporary or more parcels under different ownership: u .ation of the proposed driveway, including grade, slope, width and the dead end tum-around. Mail to town clerk with fee. Slope down from Public Road Public Road - - - --__ ---- -------- T6" rm gravel T (permanent Load -bearing ------ I driveways) Material Apron Minimum ra A rX m v 40 Driveway Permit Application & Preliminary Development Plan Craig Johnson 72418 327th Ave., Lake City Minnesota 55041 651-492-6462 (cell) ; credjo@hotmail.com Driveway Permit Sketch 5.6 Acres (—S%2 SE% SE%SE% Section 32 T.49N R.SW) On private access to 76135 Paulson Rd. Tax ID #39119 0 r � wy N45, ; -42LA-�4�)/4,-/d T Z44 "J�U� Pleas* canplato both patios of this application t N RECENED Nov 14 ZOD Bayr+eVd Co. PtannRl and Zoning 490'" Plan Commission Minutes Town of Washburn Town Hall Sunday, November 5, 2023 Members present: Kim Bro (chair), Jim Park (town board representative), Tim Schwenzfeier (vice chair). Members absent: Cyndi Belanger (secretary), Hallie Sandberg. Others present: Sandy Raspotnik (town chair), Connie Cogger, Becky Brown, Michael McKenna, Rebecca Lawrence, Nate Rudolph, Gina Park. Present on Google Meeting: Hans & Lauren Dahl 1. Chairman Bro called the meeting of the commission to order at 5:00 P.M. and verified its legal notification (posted at town hall and Tetzner Dairy) on November 2, 2023 and on town website. 2. At 4:00 P.M. prior to the meeting, the commission conducted a site visit for the driveway permit application of Craig Johnson to install a driveway on his 5.6-acre parcel in a Forestry 1 zoning district (—S'/z SE'/< SE'/4SE'/4 Section 32 T.49N R.5W; Tax ID # 39119; south of the private driveway leading to 76135 Paulson Rd.). Mr. Johnson met with the commission for the site visit. The forested property is on relatively level sand -over -clay soils (2-6% slope) that drain north to a Class 2 trout stream that is tributary to the Sioux River. Mr. Johnson had placed wire flags indicating the proposed location of the driveway and the area to be cleared on either side. He placed flagged rebar indicating his preliminary plan for the location of a garage (21'x25') and a house (33'x25'). No culverts will be needed, and the proposed turnaround tee provides an adequate turning radius and distance for emergency vehicles. The proposed development is more than 300 feet from Paulson Road with much natural forest screening between the proposed development and the road. 3. At 4:30 P.M. prior to the meeting the commission conducted a site visit for the county Class B Special Use Permit application of Hans & Lauren Dahl for adding a 75'x100' pole building for "building contractor equipment and material storage" southeast of an existing 75'x 100' pole building and 35' west of the east property line of their 10.5-acre parcel in an Forestry I zoning district (part of W'/2NE'/4SW %4 south of Paulson Rd Section 33 T.48N R.5 W; Tax ID#: 35562; 76440 Paulson Rd). Hans's father Severt met the commission members at the site. The Dahls have removed trees and placed many truckloads of sand over the sand -over -clay soil (-10% slope) to create a level site for the proposed additional storage building. There are motion -activated exterior lights without shields that glare into the adjacent properties. At this time, there are no erosion control measures on the fill to prevent the fill from eroding after construction of a building when the future roof drips to the east side of the property. Runoff at the site seeps into surface sand and flows through the soil to the south east. There is erosion control silt fencing at the edge of the property approximately 35 feet from the fill. There is a swale between the fill and the property line. At this time, with no impervious surfaces on the building site, there is no indication of gullying. 4. The minutes of the September 11, 2023 meeting were approved (Tim moves, Jim seconds). 5. The commission recommends (Tim moves, Jim seconds) that the town board approve the driveway permit for Craig Johnson. The proposed layout meets the drainage, visibility, roadbed, and turnaround requirements of the driveway ordinance. The layout is not expected to affect erodibility or seeps of the transitional (sand - over -clay) soils, and the significant natural vegetation between the site and Paulson Road will retain the forested character of the area. 6. There was significant discussion among attendees of Hans and Lauren Dahl's county application to add a second storage building for the business on the property where the duplex homes for them and Hans's father are located (see attached written comments submitted prior to the meeting). Comments related to 1) business - related traffic increasing wear and dust on Paulson Road, an unpaved road, potential offsite runoff from the roof of the new building, the noise from the back-up warning of trucks, light pollution from exterior security lights, and illegal, residential use of the current building. Hans said that most of the recent heavy traffic at their property is related to bringing in fill for the proposed building. He said that the added storage building 11A RECEIVED would allow the company to place indoors many vehicles currently visible from Paulson Rol in 2014 he planted many white pine seedlings between the road and the current building, but tN have not grown enough to create a natural vegetative screen between the town road and the building. Han�re was a previous use of the current building as a residence, but no residential use has occurrIcc} Rgn&"e °cTu" el x was built. He said that the exterior security lights are connected to motion sensors, but the sensors have to be reset after a power outage to prevent them from remaining on continuously. Kim mentioned that the town board recommended approval of the original Class B Special Use Permit in 2014 noting that the business would be a good addition to the town. Bro noted that there are other building contractors with pole buildings in Forestry -I zoning districts in the town, and there are other residents who operate several business -related vehicles from pole buildings on their home properties. Tim said that, in addition to his long-time, building contractor business on Hove Lane, there is Bob Olson's sand pit that uses the unpaved road. He expects that the traffic level on Hove Lane is comparable to, if not greater than, the traffic on Paulson Road. Jim said that, while the town is responsible for road maintenance, it cannot dictate how much the public traffic is allowed to use town roads. Several unpaved town roads receive frequent use and wear. Kim mentioned that the County Planning and Zoning Committee decides on the issuance of Class B Special Use permits. The town board only can make recommendations to the county regarding the permit. Kim mentioned that the Bayfield County Zoning Ordinance lists "Building Contractor Equipment and Material Storage" as a use that may be permitted in a Forestry -I zoning district if specific, measureable conditions listed in the ordinance can be met. The commission discussed with the Dahls permit conditions that they would accept: 1) place erosion control along the east dripline of the roof to prevent the fill from eroding at the back of the new building, and establish a dry swale between the building and the property line so that roof runoff will seep into the sandy soil on -site and not create gullies extending from the site to neighboring properties, 2) add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to provide a natural, vegetative screen along the road, 3) place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly toward adjacent properties, and 4) maintain normal business hours for traffic and noise on site of 6:00 A.M. to 6:00 P.M. The Dahls are amenable to these conditions. The Dahls acknowledged that residential use of the pole buildings is not permitted. The commission recommends (Tim moves, Jim seconds) that the town board recommend county approval of the Dahl's Class B Special Use Permit application to construct an additional pole building provided that the four conditions listed above are met. With these conditions, the proposed project will encourage a local business that is compatible with the rural character (Goal 8.4), add natural vegetative screening appropriate for a forested area (Policy 8. Le), and accommodate the erodibility of transitional (sand -over -clay) soils (pp.7-22 & 8-24). 7. Kim mentioned that the public hearing on the updated county comprehensive plan will be at 6:00 P.M. on Tuesday, November 14 at the county board room. Many of the elements in this updated plan are likely to be addressed in the update to the town's comprehensive plan. The town will be contracting with Northwest Regional Planning Commission to update the town plan. The regional planning commission assisted the county in updating its plan. 8. The commission selected Sunday, December 3, 2023 3:30 P.M. for the next meeting if site visits are required. 9. The meeting adjourned at 6:00 P.M. (Tim moves, Jim seconds). Draft submitted by: Kenneth Bro, Chair, Town of Washburn Plan Commission (November 14, 2023). RECEIVED NOV 14 2023 Bayfield Co. Planning and Zoning Agency Plan Commission Report The commission recommends that the town board renew approval of the driveway permit for Craig Johnson. The commission recommends that the town board recommend county approval of the Class B Special Use Permit for Hans & Lauren Dahl to add a second pole building (75'x 100') southeast of their existing pole building for "building contractor equipment and material storage" provided that four conditions are required to enhance natural screening, control potential erosion and surface runoff, reduce off -site glare of lights, and maintain normal business hours within 6:00 A.M. and 6:00 P.M. November 4, 2023 NOV 14 2023 Correspondence to Washburn Town Plan "p#s.sion regarding Dahl's County Class B Special Use Permit f6r6WAdd'lU6`iSffl Pole Building From: Elizabeth Pittman-Tetzner<ejpt5472@gmail.com> Date: October 2, 2023 at 7:48:13 AM CDT To: chair@townofwashburn.com Subject: Concerns regarding Dahl's proposed business additions Im I was informed yesterday by a neighbor that Dahl's were approved for another humongous pole barn. She asked me if I had been informed by the town of the approval of the permit. None of my neighbors who live in very close proximity (including myself) were made aware of any intentions to further expand his business on residential property. I am very concerned that this next expansion will further decay my property values, and add additional noise pollution from all the semis, trucks, and moving vehicles running and being stored there. My neighbor has additional ground water, well contamination issues. Why were we not informed of the permit request? Lastly, I have nothing against the Dahl's personally, I view them as continually degrading MY property value though. My poor neighbor who owns a very nice home in close proximity is totally stressed out about this expanding business in what was a residential area. I believe it was the town's supervisors who should have informed us when they first made the request and we not having to read it in the paper. Lastly, what are their plans for the barn? Noisy prefab? Storage? Elizabeth T. From: Nancy Hanson <nancy@twinwolf.net> Date: Wed, Nov 1, 11:53 AM To: Kenneth M.Bro Subject: Hans Dahl land us permit Dear Kim, My property adjoins Hans Dahl's property. I'm very concerned about what he's planning on using this proposed building for and the added truck and commercial traffic on Paulson Road. With the huge pole building he's already built on his property we've seen a big increase of truck and other vehicle traffic for his business and I fear this new building will add even more. I've owned my property for over 20 years and have enjoyed the rural quiet lifestyle. I never dreamed this area would ever be zoned commerciaM Paulson road is a gravel (dirt) road and with his added commercial traffic on it, it gets torn up very easily. The minute the township grades the road his trucks and business vehicle traffic mess it up. As a tax payer I sure don't want to have to pay to upgrade the road for the benefit of his businessl l Another concern I have is the amount of fill he's having hauled in. There is a ravine the runs between his property and mine which ultimately runs into the Sioux River. I'm not sure if he's filling in a part of the ravine but if not will the runoff from the added height cause runoff into the ravine??? RECEIVED NOV 14 2023 November 4, 2023 These are j hM°p jd worries I have with the possibility of more commercial operations being built in our neighborhood. Will this just be the beginning of commercial development in our neighborhood?? I certainly hope not!I Regards, Nancy Hanson 27435 Paulson Road Washburn, WI 54891 715-292-3822 From: Becky Lawrence <beckyandrudy@yahoo.com> Date: Thu, Nov 2, 9:18 AM To: Kenneth M. Bro Subject: Dahl Construction Paulson Rd Washburn WI To whom it may concern: It has been brought to our attention that Dahl Construction is expanding. Please reconsider this building permit as we do not feel our Residential/Agriculture zoned neighborhood can handle anymore industrial expansion. Paulson road is a narrow gravel road that can barely handle the car traffic, let alone the increased large truck and eighteen wheeler truck traffic. We have to pull over to the shoulder when meeting any sort of traffic. Now, with the increased Dahl truck traffic, we have to pullover and stop to let the trucks pass. This has been happening since Dahl Construction moved to Paulson Road. Now, since their expansion has started this fall, the hundreds of trucks that have been traveling the road has made our road quality even worse with all of the potholes. We can no longer safely enjoy family walks on our road, and the road dust from the truck traffic is horrible. The manufacturing/industrial expansion of Dahl Construction should be relocated to a Business/Industrial Park where infrastructure is in place to handle their needs and taxed appropriately. We feel that having a manufacturing/industrial business located on Paulson Road will continue to negatively affect all residence and the resale value of our homes. Thank you, Nate Rudolph Rebecca Lawrence 27530 Paulson Rd Washburn, WI 54891 ph.715-817-4800 November 4, 2023 From: Elizabeth Pittman-Tetzner<ejpt5472@gmail.com> RECEIVED Date: Thu, Nov 2, 6:25 PM To: Kenneth M. Bro NOV 14 2023 Subject: Dahls proposed business addition on Paulson Rd. nayfiek Co. Planning and zoning Agency I would like to express my concerns regarding Hans Dahl business expansion on Paulson Rd. I sold my 10 acres to Hans under the impression he was building a duplex and one pole barn related to his construction business in 2009. At present he has one very large pole barn, numerous large construction equipment, several semis, tractors that have backup horns, an apartment on the upper floor of the pole barn, 2 wells, and now a huge sand -filled platform in preparation for another pole barn of equal size that he states is to be used for'cold storage" whatever that may mean? PreFab? He has destroyed the quiet neighborhood we once had. His transportation equipment has made this dirt road EXTREMELY DUSTY, EXCESSIVELY NOISY, and in worse condition than before. The town needs to blacktop this road if they are pushing through with his expansion plans or the town may result in legal issues in the future. Maybe his trucks need to travel down Paulson and Wannabo instead of the shorter route past our houses. There are no houses but HIS that way. I do not think it right that I have to breathe the dust from the road while their duplex is further down the road from the traffic allowing them to escape from the aerosolized dust and noise. They do not have to look at the "business enterprise" nor are they subject to the noise that they are responsible in creating. There are 4 permanent property owners who are dealing with dust and noise pollution created by Dahl Construction when they use the Paulson/Church Corner stretch. We are all in protest to this expansion. Secondly, I am very concerned for my neighbors who live below the proposed building site located 33 Ft. from their property line. The sand that was needed to fill in this platform is (8ft high ? ) on the eastern side (not sure exactly). Can you imagine the runoff onto their only road during rainstorms? This area is a sloping hill that runs eventually into the Sioux. How will this affect their well? How will this huge building affect my neighbor's aesthetic view they presently have? And what about the additional noise and lights that they will have to endure? This business should have had restrictions and we should have been informed prior of his intentions We could have voiced our major concerns in proper order of business. Thank you. ELIZABETH TETZNER 76445 PAUL50N RD. November 4, 2023 RECEIVED From: Lea Rolfsen and Michael Mckenna Date: November 2, 2023 NOV 14 2023 Subject: Town P & Z Committee eayaeld Co. Planning and Zoning Committee members— Planning and Zoning Ag"cY We, Lea Rolfsen and Michael Mckenna, have many valid concerns in regards to Dahl Construction's amendment to his special use permit proposing another 7500 sq. ft. pole building on Paulson Road. We are the most immediate neighbors and the impacts from his first pole building have been heavy, with increasing traffic, noise, lights and machinery; our peaceful forest has been compromised. This proposed second 7500 sq. ft. pole building doubles his footprint and impacts, effectively creating an industrial/commercial zone within an F-1 setting. Dahl Construction is a large company and not a typical home -based business. Any more expansion of these industrial type activities is not compatible with our neighborhood' and should be taking place in an industrial zone. Where are the protections of residents who moved to an F-1 setting because of the quiet nature of it? We did not move into an industrial zone; he moved into our forest neighborhood and should show us all more consideration. We are very troubled for many reasons. We are directly downhill and downstream from his operation, and the siting of this new proposed building is only 50 yards uphill from our driveway. The combined surface water runoff from two 7,500 square foot pole building roofs, and a huge amount of sand — over 100 semi -trucks of sand - will be substantial. Who will be liable if we are flooded out, or our well becomes contaminated from vehicle lubricants, or our marsh/lowland forest fills with sediment or pollution? This water then joins drainages that feed the Sioux River. What protects that? Our health and gardens rely on clean water. Noise is another big impact. We have noise any day of the week, any hour of the day, and there is never a day scheduled for off hours. We suggest weekends off, and some quiet time established during the other days of the week. Our road is becoming unsafe as well, with a heavy amount of traffic, semi -trucks loading and unloading and related business activity. Paulson Road isn't designed forthis type of use, and the nearby dogleg in the road creates hazard conditions, also. Light pollution from the first pole building has bright lights shining out into the woods and down toward our house, all night long, which harms nocturnal animals and insects, and impacts our naturally darkened sky. The Bayfield County Comprehensive Plan and that of the Town of Washburn, note the Forestry-1 zoning district recommends maintaining a "rural character". Our recommendation is that lights be adjusted to face downwards, or put on timers, with an overall reduction in the lighting footprint. A lot of forest habitat has been compromised and much vegetative cover removed. We recommend replanting trees on the south side of the site to control erosion and as screening from business operations. Mr. Dahl's first 2014 conditional use permit states: the pole barn is for [building contractor equipment and storage]; there was no mention of prefab manufacturing or of an apartment dwelling. In October 2015 Mr. Dahl's started prefab manufacturing activities, creating unusually loud amounts of noise as early as 5 am. I talked with Mr. Dahl in regards to this issue, he assured me it was a one-time November 4, 2023 only event, that they usually build on site. After this activity was complete, he assured me the site would be used only for storage of equipment and materials. And the only noise would come from a few trucks in the morning, and him on his computer keyboard. Nothing could have been further from the truth. In December of 2022 Mr. Dahl's Facebook post advertised 'prefab wall' construction, with a photo of that fabrication/assembly activity underway. This language is not in his original permit description. How can we be certain his stated pole -barn use and 'actual' use are the same? In fact, Bayfield County Zoning Ordinance does not permit such use in an F-1 zoning district. Rezoning would be required to allow such manufacturing to occur, and that type of rezoning would be "spot zoning", which would be illegal — RECEIVED We have been misled. NOV 14 2023 We recommend unscheduled site visits to ensure the true use of his buildings is known. Bayreid co. Planning and Zoning Agency How many special use permits does it take until zoning has been changed entirely from its original designation, and 'spot zoning' has occurred? Also, creating negative impacts for everyone. The practice of issuing special use permits undermines the reasons for doing zoning in the first place. This business expansion is not compatible with this particular forest zone. We suggest that any further development or expansion of Dahl Construction should move to an already existing business/industrial area out of this forestry zone. The general welfare of our neighborhood was protected with the original zoning and now has been compromised. We need, and require, zoning to protect our homes and families. We are also highly concerned with any loss of property value related to this special zoning. We have examples that the proximity to commercial use property has a negative impact with prospective buyers hesitating to purchase due to traffic, safety, noise, odors and lighting - all of which we mentioned previously. Our community safety and the general welfare of the neighborhood has already impacted and compromised. It would be further compromised with the approval of this special use permit request that's before you now. Granting of this permit could then lead others in the forestry zoning district to assume they could do the same. We encourage the committee not to approve this special use permit request for the reasons already stated. The basis for denial can include preventing detrimental impacts such erosion, light and noise pollution, heavy vehicle traffic, illegal assembly or manufacturing activity, all enforceable conditions. rJ - - �_ � 1 X i Y ' i� k 5y k-: November 4, 2023 From: hans@dahlconstruction.com Date: Nov 2, 2023, 10:27 AM To: Hans Dahl, Lauren Dahl, Kenneth M. Bro, Hallie Sandberg, Cyndi Belanger, Mike Harvey, Jim Park, Tim Schwenzfeier, Sandy Raspotnik, Kerry Tetzner, Scottie Sandstrom, Craig Johnson Subject: Town Plan Commission Agenda Sunday, Novermber 5 4pm Hey everyone Our building location actually didn't change, Lauren (my wife) just draws better than I do Q When you get here, you'll see the building sand lift is still within the original markings I had put up prior to cutting the trees down. If you decide to still visit, please be careful in and around the site location. I dug out some large stumps but haven't graded things back in very well yet. Lauren and I leave for California again this weekend and likely won't have time to dress things up before I leave. Feel free to call my cell if you have any questions while onsite or when you get back to the hall. 715-209-1527 I've put the construction on hold now until spring unless we get some warm weather again. I'm not going to fight mother nature. If it helps, I still need to haul in more sand to enlarge the footprint. I plan to put a 6" minus breaker rock, similar to the rock in front of my existing building, to secure the lift from washout. This would be the SE side for reference. Topsoil and native grasses will go on the north and south ends. With all the rain we have had the lift hasn't washed out, so I don't anticipate any washout moving forward. My original topsoil berm is working great! The lift cost a fortune and I don't want it to go anywhere. The sand is from Bob Olson's pit, just an FYI. Lastly, do you need me to attend the meeting via zoom or anything? I certainly can if you want me to. 1 would just need a link. Thanks everyone for your time on this! HANSDAHL N�V � q 2023 BaM. n9aaeocl VW61n9 ` i F ! l RWI NSINCORMRI N 6 MG WASNSONN,WI November 5, 2023 TO: Town of Washburn Commissioners, RE: Dahl Permit Application Hans and Lauren Dahl Dahl Construction Co. 76440 Paulson Rd Washburn, WI54891 Commissioners: RECEIVED NOV 14 2023 Bayfield Co. Planning and Zoning ggft y This letter is for informational purposes to help others to understand the operations of Dahl Construction Co. (Company) doing business at its location on Paulson Road. I had received an email in advance oftoday's town meeting from Kenneth (Kim) Bro, with emails attached from neighbors expressing their concerns. After reading the emails, it is apparent the neighbors don't understand what the Company does, but I must admit it is interesting to learn what they believe we do for a living. There are also several inaccurate statements and serious concerns that we have related to their comments along with additional harassment our family has received from Ms. Rolfson and Mr. Mckenna. While we know that the purpose of the Town Board's meeting today is to review the driveway location, we understand that the board can make recommendations to the county. If appropriate and if you feel it would be helpful, we would like to request the opportunity to formally correct and clarify some of these neighbors' statements prior to that recommendation. The following is a list of operations common for the company and the existing pole building: 1. Business hours, Monday through Friday, 7:00 AM to 5:00 PM. 2. Deliveries excepted during business hours. 3. 99% of our deliveries are by Fed-x and or UPS. 4. Our deliveries are typically tool related, replacement parts, office supplies, and bathrooms necessities. 5. The company is a general contracting home builder and light commercial. We don't do industrial work, nor are we licensed for it. 6. Administration is the primary task done in the existing pole building (EP1). 7. 1 along with a project manager and an office administrator is normal staff for the company. 8. EP1 has the capacity for additional project managers and office staff should the need arise, no more building expansion is needed for this. 9. EP1 was designed for the sole purpose of material and tool storage, offices for employees and for general maintenance of construction related equipment. It allows us to be organized and proficient. EP1 took years in the making. RECEIVED BaYfield Co. Planning andZminaina Aaerxv LON.if/�f/Lf/®NLO. •wucxxsn eoxrounxx u�vn wuxxwx, xt 10. EP1 is used to fix the Company's equipment but is limited to what my father in-law, who is retired, can handle. 11. Large repairs need to be outsourced due to no full-time mechanic and lack of auto shop tools. I have no intentions of expanding this trade, it isn't what we specialize in. 12. EPl stores numerous left -over building materials that priorto EP1, were destroyed by mother nature prior to being repurposed. 13. EP1 stores the majority of our hand and power tools. 14. EP1 main area is fully insulated and heated allowing us to store and repurpose paints/stains and other materials that cannot freeze. Also allows us to avoid starting vehicles and equipment early during winter months. No one likes cleaning off snow. 15. Dahl has a full sized dumpster on site year round for proper disposal of materials, emptied on a monthly basis. 16. Dahl owns several vehicles (pickups and vans), but those vehicles are typically taken home by the employees to avoid travel back to the shop and then to jobsites. More efficient this way. 17. Larger equipment such as our crane, sky track and man lift are stored onsite at random times. During the construction season, those pieces of equipment are normally on a jobsite. If they are in the yard, they aren't making money and give no benefit to the Company. 18. Dahl owns a dump truck with the sole purpose to hall the pieces of equipment mentioned above. 19. EP1 is equipped with 24 hour security cameras backed up in the cloud. 20. EP1 has exterior lights for safety and security. The overhead light on the North Gable is the same style of light you will find on farms and is controlled by a dusk to dawn sensor. 21. EP1 has lights on the East side of the building as well for the same reasons. These lights are also dusk to dawn but are controlled by occupancy sensors rather than being on all night. 22. The East Side lights are currently positioned to come on and aim directly to the north and are pointed down. Their intent is to come on if anyone approaches with a vehicle to better capture vehicles or people on camera. The company has built walls in the shop on two occasions since it was built. Both occasions were due to cold temperatures and or job site availability during winter months. Building walls in our shop is not an efficient way to construct a home but does allow the crew to keep working and keep schedules during the winter. It is more efficient, cheaper and our normal style of building to construct homes on their respective sites. The heated shop does give us the option though. We have a short building season as it is so any trick to help keep things moving forward is a good thing. The following is the intent and sole purpose for the new cold storage building (CSB): 1. To store all pieces of equipment currently on the property so they are inside and out of the elements. 2. This includes the larger pieces of equipment mentioned previously along with the Dump Truck and trailer. RECEIVtu NOV 14 2023 _- Baymo Co. Plenntnp and Zoning Agenq LO&V"AV ILT/ONLB. nwuco NCOmm N ¢. M wuxeuvx,w, 3. Everything you currently see on the property stored outside will end up inside CSB 4. CSB will create a direct blind to the only neighbors who have expressed their concerns directly to us. (Lea Rolfsen and Michael Mckenna) 5. CSB has been positioned in a way that allows for the best safety and security of Dahl's current assets. 6. CSB was positioned in a manner so Lauren and myself along with my parents, will only be able to see the building during the winter months. We are by far the closest residence to this location. There has been mention of increased traffic with large semi -type vehicles. This is directly related to a construction project, not normal business activities that we do. This is no different than any home or light commercial project being constructed anywhere. There are also other projects and traffic on Paulson, in both directions, not related to our business but people assume it is us. The Company's primary focus as of today, is project management for residential and light commercial projects. I let all my carpenters go early summer of 2022 and have not replaced them and don't plan to. For the past year I have been working alone in EPl, not by choice but due to cancer related diagnosis of my right-hand person and my sister going back to a position she thrives in better than the construction trade. I have replaced both people in the last three months, and I am very thankful to have found them. The company now subs out 95%of the work of constructing a home or light commercial building. I hope this letter has helped to give some insight into our operations. Bayfield County's Assistant Zoning Administrator Alessandro Hall has been working on the permitting with us. Alessandro has been to the sight to verify that the location of CSB meets the required setbacks and had also requested to see the interior of our existing building to better understand our operations. I was able to give him a tour so he could update his files with the county. One last thing on the location of CSB, I didn't do minimum setbacks but rather gave myself additional space to allow for a nice blind should our neighbors directly to the east decide to develop someday. Sin erely, T Hans Dahl, President ha ns@dahlconstruction.com Deb Kmetz From: Elizabeth Pittman-Tetzner <ejpt5472@gmail.com> Sent: Friday, November 3, 2023 7:46 AM To: Zoning Subject: Fwd: Dahls proposed business addition on Paulson Rd. You don't often get email from ejpt5472@gmail.com. Learn why this is imRortan ---------- Forwarded message --------- From: Elizabeth Pittman-Tetzner <e0ot5472@amail.com> Date: Thu, Nov 2, 2023 at 6:25 PM Subject: Dahls proposed business addition on Paulson Rd. To: kbro1151@gmail.com <kbro1151@gmaiI.com> I would like to express my concerns regarding Hans Dahl business expansion on Paulson Rd. I sold my 10 acres to Hans under the impression he was building a duplex and one pole barn related to his construction business in 2009. At present he has one very large pole barn, numerous large construction equipment, several semis, tractors that have backup horns, an apartment on the upper floor of the pole barn, 2 wells, and now a huge sand -filled platform in preparation for another pole barn of equal size that he states is to be used for'cold storage" whatever that may mean? PreFab? He has destroyed the quiet neighborhood we once had. His transportation equipment has made this dirt road EXTREMELY DUSTY, EXCESSIVELY NOISY, and in worse condition than before. The town needs to blacktop this road if they are pushing through with his expansion plans or the town may result in legal issues in the future. Maybe his trucks need to travel down Paulson and Wannabo instead of the shorter route past our houses. There are no houses but HIS that way. I do not think it right that I have to breathe the dust from the road while their duplex is further down the road from the traffic allowing them to escape from the aerosolized dust and noise. They do not have to look at the "business enterprise" nor are they subject to the noise that they are responsible in creating. There are 4 permanent property owners who are dealing with dust and noise pollution created by Dahl Construction when they use the Paulson/Church Corner stretch. We are all in protest to this expansion. Secondly, I am very concerned for my neighbors who live below the proposed building site located 33 Ft. from their property line. The sand that was needed to fill in this platform is (8ft high ? ) on the eastern side (not sure exactly). Can you imagine the runoff onto their only road during rainstorms? This area is a sloping hill that runs eventually into the Sioux. How will this affect their well? How will this huge building affect my neighbor's aesthetic view they presently have? And what about the additional noise and lights that they will have to endure? This business should have had restrictions and we should have been informed prior of his intentions We could have voiced our major concerns in proper order of business. Thank you. ELIZABETH TETZNER 76445 PAULSON RD. RECEIVED ' C NOV 13 2023 To: Bayfield Planning and Zoning Bayfie�d co. From: Michael McKenna and Lea Rolfsen Planning ark zoning Agency This is to bring further understanding around our concerns as neighbors to Dahl Construction's business activities, in our F-1 Forestry Zone, and the new proposed pole building basically doubling his footprint. Upon reviewing the 17 criteria for issuing or denying conditional use permits, they validate our concerns (Sec. 13-1-41). 1. Zoning Ordinance: A large contractor business and its activities are not to scale with this F-1 zone ... it's incompatible. 8. Community or General Welfare: As stated our neighborhood continues to be impacted and therefore suffers from Dahl Construction's activities. Please refer to my first letter, written on November 2nd to Planning and Zoning. Protections from Planning and Zoning guidelines were undermined with the issuance of conditional use permits. 10. Prevention and Control of Water Pollution (including sedimentation), Air Pollution and Noise: These are definitely problems we are dealing with. The present sediment fence is inadequate to deal with any big storm run-off. When flooding, pollution and damage occurs, who is liable? 11. Existing Topographic, Drainage Features and Vegetative Cover On Site: The new pole building is sited directly uphill from our driveway and will drain directly down along our driveway and towards our garage and house. Surface water run-off is a great concern, especially with the additional 7,500 sq.ft. pole building roof. Also, the parking area is devoid of vegetation, further compounding the potential for surface water run-off and erosion. A holding pond for water run-off could be overwhelmed, so a "French Drain" system moving water away, would a better system, according to local soil scientists. 17. The Potential Impact of the Proposed Use On Other Lands and Land Uses in the Vicinity and the Extent to Which It Would Be Compatible or Incompatible Therewith: The potential impact of this proposed expanded use will further compound the nuisances that all the neighbors endure. All those living in the vicinity of Dahl Construction's operations and facility find it incompatible in our Forestry zone, and our once quiet neighborhood. Mr. Dahl constantly downplays his impacts and only addresses our concerns to negate them. He hasn't shown any regard to his neighbors, even when issues were brought to his attention. RECEIVED NOV 13 M3 aayfi6d CO. Planning and Zoning Agency This is a growing, large-scale company with government contracts — surely not just a "light commercial business with occasional assembly". If he expands the fabrication side of his operation, what protections do we have? Our only insurance against damages and disturbances is with enforceable conditions addressing all our concerns protecting our investments, homes, land, etc. To disregard a whole neighborhood's concerns and issue another conditional use permit, basically creating a business/industrial "spot zoning", is irresponsible and doesn't support "rural quality of life". Where are the protections for those who were here first, having bought in a Forestry zone and chose this area for its quiet forest setting? Protect the integrity of zoning, don't undermine it. Please refer to my November 2nd letter which more thoroughly explains the issues of concern. Michael McKenna and Lea Rolfsen 76370 Paulson Road Washburn WI 54891 November 2, 2023 Planning and Zoning Committee members — RECEIVED NOV 13 2023 Cj Bayfield Co. Planning and Zoning Agency We, Lea Rolfsen and Michael Mckenna, have many valid concerns in regards to Dahl Construction's amendment to his special use permit proposing another 7500 sq. ft. pole building on Paulson Road. We are the most immediate neighbors and the impacts from his first pole building have been heavy, with increasing traffic, noise, lights and machinery; our peaceful forest has been compromised. This proposed second 7500 sq. ft. pole building doubles his footprint and impacts, effectively creating an industrial/commercial zone within an F-1 setting. Dahl Construction is a large company and not a typical home -based business. Any more expansion of these industrial type activities is not compatible with our neighborhood and should be taking place in an industrial zone. Where are the protections of residents who moved to an F-1 setting because of the quiet nature of it? We did not move into an industrial zone; he moved into our forest neighborhood and should show us all more consideration. We are very troubled for many reasons. We are directly downhill and downstream from his operation, and the siting of this new proposed building is only 50 yards uphill from our driveway. The combined surface water runoff from two 7,500 square foot pole building roofs, and a huge amount of sand —over 100 semi -trucks of sand - will be substantial. Who will be liable if we are flooded out, or our well becomes contaminated from vehicle lubricants, or our marsh/lowland forest fills with sediment or pollution? This water then joins drainages that feed the Sioux River. What protects that? Our health and gardens rely on clean water. Noise is another big impact. We have noise any day of the week, any hour of the day, and there is never a day scheduled for off hours. We suggest weekends off, and some quiet time established during the other days of the week. Our road is becoming unsafe as well, with a heavy amount of traffic, semi -trucks loading and unloading and related business activity. Paulson Road isn't designed for this type of use, and the nearby dogleg in the road creates hazard conditions, also. Light pollution from the first pole building has bright lights shining out into the woods and down toward our house, all night long, which harms nocturnal animals and insects, and impacts our naturally darkened sky. The Bayfield County Comprehensive Plan and that of the Town of Washburn, note the Forestry-1 zoning district recommends maintaining a "rural character". Our recommendation is that lights be adjusted to face downwards, or put on timers, with an overall reduction in the lighting footprint. A lot of forest habitat has been compromised and much vegetative cover removed. We recommend replanting trees on the south side of the site to control erosion and as screening from business operations. Mr. Dahl's first 2014 conditional use permit states: the pole barn is for [building contractor equipment and storage]; there was no mention of prefab manufacturing or of an apartment dwelling. In October 2015 Mr. Dahl's started prefab manufacturing activities, creating unusually loud amounts of noise as early as 5 am. I talked with Mr. Dahl in regards to this issue, he assured me it was a one-time only event, that they usually build on site. After this activity was complete, he assured me the site would be used only for storage of equipment and materials. And the only noise would come from a few trucks in the�morning, `and him on his computer keyboard. Nothing could have been further from the truth. In December of 2022 Mr. Dahl's Facebook post advertised 'prefab wall' construction, with a photo of that fabrication/assembly activity underway. This language is not in his original permit description. How can we be certain his stated pole -barn use and 'actual' use are the same? In fact, Bayfield County Zoning Ordinance does not permit such use in an F-1 zoning district. Rezoning would be required to allow such manufacturing to occur, and that type of rezoning would be "spot zoning", which would be illegal. We have been misled. We recommend unscheduled site visits to ensure the true use of his buildings is known. How many special use permits does it take until zoning has been changed entirely from its original designation, and 'spot zoning' has occurred? Also, creating negative impacts for everyone. The practice of issuing special use permits undermines the reasons for doing zoning in the first place. This business expansion is not compatible with this particular forest zone. We suggest that any further development or expansion of Dahl Construction should move to an already existing business/industrial area out of this forestry zone. The general welfare of our neighborhood was protected with the original zoning and now has been compromised. We need, and require, zoning to protect our homes and families. We are also highly concerned with any loss of property value related to this special zoning. We have examples that the proximity to commercial use property has a negative impact with prospective buyers hesitating to purchase due to traffic, safety, noise, odors and lighting - all of which we mentioned previously. Our community safety and the general welfare of the neighborhood has already impacted and compromised. It would be further compromised with the approval of this special use permit request that's before you now. Granting of this permit could then lead others in the forestry zoning district to assume they could do the same. We encourage the committee not to approve this special use permit request for the reasons already stated. The basis for denial can include preventing detrimental impacts such erosion, light and noise pollution, heavy vehicle traffic, illegal assembly or manufacturing activity, all enforceable conditions. Sincerely, Michael McKenna & Lea Rolfsen 76370 Paulson Road Washburn, WI 54891 Attachments: 5 photos k ow, Ri 14. PFI I I A i-t�n gw'p NO Uf + 0 1 JI At 11/13123, 1:12 PM McKenna Night Photo.jpeg RECEIVED 0 13zw svoew CO a 9191wi'^g and Zoning https://drive.google.com/file/d/lvFwrMcxH9_eiwA96JIwmKTflhvp6XHWa/view 1/2 11/13/23, 1:12 PM Dahl Facebook Post 12_21_22.jpg 10:45 A Dahl Construction Company a Inlagg Om Foton Mer w Dahl Construction Company ar har: Dahl Construction company. 21 dec. 2022 • Washburn, Amerikas forenta stater 0 What happens when it's -9 out and there's 2' of snow on the ground? You make your own pre-fab wall shop! https://drive.google.com/file/d/lg4H TFqGVp8RXMLieu2LhrjKQwSiGplhlview RECEIVED NOV 13 205 Barfield co. p*wi g and Zoning Agencl 1/2 c Alessandro Hall REULIVInu From: Kaia DeSchane <ely5moon@yahoo.com> Sent: Monday, November 13, 2023 2:24 PM NOV 13 2023 To: Alessandro Hall Subject: Dahl property project ��� �' J P P Y P J planning and Zoning Agency IYou don't often get email from ely5moon@yahoo.com. Learn why this is important I am writing to register complaint and concern regarding the land changes occurring at the Dahl property on Paulson Road which touches my property. Although I bought my land recently (2021) , I have been visiting this exact area since my friends the Vassers first walked the land and bought their property above Paulson Road. I also lived one summer on the Vasser property about 7 years ago. Lea And Michael are also dear friends and they notified me when the land I purchased from Matt Powers was available. I had hopes our little forest community would continue to be quiet and nature oriented, undeveloped and peaceful. As this new project began with chainsaws and clearing and continued to ramp up into months of grading and filling , I wondered how such a large project could be undertaken without approval. I now understand that site preparation is allowed by the County. However perhaps the size of a project should require different and appropriate permitting consideration? Each building Mr. Dahl puts up is accompanied by lights, traffic, trucks and the noise of construction and now this new huge building so near our properties is going up without our knowing what will be happening within and to and from it. I'm concerned that the animals we live with are being impacted , as we neighbor humans are. I am not sure any legal recourse will be available to us. But understand how this project is changing our home lives and road safety and the natural world we care about. Sincerely, Karen(Kaia) DeSchane 15967 State Hwy 131 Ruth Hulstrom From: Zoning Sent: Wednesday, November 15, 2023 6:24 AM To: Ruth Hulstrom Subject: FW: Dahl Special Use Application Correspondence for the meeting on Thursday. From: Jeff Banowetz <jeffbanowetz@yahoo.com> Sent: Tuesday, November 14, 2023 6:06 PM To: Zoning <zoning@bayfieldcounty.wi.gov> Subject: Dahl Special Use Application IYou don't often get email from ieffbanowetz@yahoo.com. Learn why this is important Bayfield County Planning and Zoning Committee, As a resident of Paulson Rd. I am not supportive of this special use application. This segment of Paulson Road is not conducive to higher traffic and usage by heavy trucks as evidenced by the current conditions. Apparently, this application is a forgone conclusion since numerous loads of fill have been dumped on the Applicants property and grading and compacting has already been done. In the mailing I received for this meeting, the footnote at the bottom of the page states: "Receiving approval from the P. and Z. Committee at the meeting does not authorize beginning of constructior or land use; you must first obtain land use application/permit cards from the Planning and Zoning Department. But putting that fact aside, this section of road is not conducive to the increased level of traffic that a commercial construction operation brings to the area. Heavy equipment and trucks have had a significant impact on road conditions (washboard and potholes are now common) and the safety of drivers, bikers, runners, and walkers has also been significantly impacted. There is a dangerous 15 mph narrow curve within 100 yards of this development, and I know of many Paulson Road residents who no longer feel safe using the road due to increased traffic from non-residents. Secondly, F-1 Forestry is not intended to be used as a Commercial Construction development zone. There are appropriately zoned areas for this type of land usage and this segment of Paulson Road is not one of them. The continued development on roads such as this permanently change the characteristics of the neighborhood. We need places like this to remain somewhat underdeveloped. It's what makes Bayfield County such a special place to live. It's what this area is zoned for. Otherwise, what is the point of having Zoning areas? This type of development has its place: Commercial/ Industrial Zoning. Thank you for taking the time to hear me out. Sincerely, Jeff Banowetz 76360 Paulson Road 'Cr t�"FIELD Planning and Zoning Committee Staff Report Meeting Date: November 16, 2023 Agenda Item: Hans & Lauren Dahl (Washburn) — Building Contractor Equipment & Storage consisting of (1) existing pole building for storage, office, and occasional assembly and (1) proposed pole building used for cold storage in a Forestry-1 zone. Report Date: November 9, 2023 Prepared by: Alessandro Hall Assistant Zoning Administrator Request Summary: Hans & Lauren Dahl, property owners, are requesting a Class B Special Use Permit to authorize the construction of a second 75' x 100' pole shed for Building Contractor Equipment & Storage on their property identified as Tax ID 435562 and legally described as Part of the W %2 of the NE '/a of the SW '/< of Section 33, Township 49, Range 5 lying south of the centerline of Paulson Road and recorded in Document 42019R-578255 at the Bayfield County Register of Deeds (hereafter referred to as a subject property). The subject property is zoned Forestry-1 (F-1) and is currently developed with a duplex where the property owners reside and a pole shed used as the headquarters of the Dahl Construction Company. The property owner obtained a Class B Special Use Permit in 2014 to construct the existing 75' x 100' pole shed for the contracting business. The proposed second pole shed would intensify the Building Contractor & Equipment and Storage use on the site, and therefore an updated Class B Special Use permit is required. The new pole shed will be used for cold storage and will allow the property owner to secure equipment indoors. Alternatives: 1) The Planning and Zoning Committee can approve a Class B Special Use Permit for a Building Contractor Equipment & Storage use consisting of two (2) 75' and 100' pole sheds on Tax ID# 35562. 2) The Planning and Zoning Committee can approve with conditions a Class B Special Use Permit for a Building Contractor Equipment & Storage use consisting of two (2) 75' and 100' pole sheds on Tax ID# 35562. 3) The Planning and Zoning Committee can deny a Class B Special Use Permit for a Building Contractor Equipment & Storage use consisting of two (2) 75' and 100' pole sheds on Tax ID# 35562 due to substantial evidence that it does not meet Bayfield County ordinances. Department Recommendation: Several neighbors have reached out to the Department with concerns about the impact of the proposed project on surrounding properties. Concerns have centered on noise, pollution from trucks, light pollution, stormwater management and erosion, and impact on surrounding property values. If the committee is inclined to grant the Class B Special Use permit, the Department recommends the following conditions: • No truck deliveries or equipment loading between 5:30 P.M. and 7 A.M. • Downward facing or motion activated lighting devices on pole shed buildings. • Best management practices during construction to prevent erosion. In addition to these conditions aimed at reducing impacts to surrounding property owners, several compliance issues arose during the application review process that should be addressed by the Planning and Zoning Committee. At some point between the 2014 approval and today, part of the existing pole shed was converted into two unpermitted dwelling units. Upon learning of this conversion, Department staff conducted an onsite visit with the property owner and confirmed that these areas of the pole shed are no longer being used for human habitation. However, if the committee approves the Class B Special Use Permit, the department recommends a condition explicitly forbidding the use of either pole building associated with the Building Contractor Equipment & Storage request for human habitation. Finally, it has come to the attention of the Department that the property owner occasionally uses the existing pole shed to assemble modular building components before delivering them onsite. Based on conversations with the property owner, it appears that this activity is rare, does not involve any kind of manufacturing, and only occurs inside the structure with all doors closed. As a result, it is the Department's position that this activity is incidental to the Building Contractor Equipment & Storage use. However, the Department requests that the committee weigh in on whether assembly should be allowed under this permit, allowed with conditions, or require a separate approval. above expectations FIELD PLANNING AND ZONING DEPARTMENT December 28, 2023 Hans & Lauren Dahl 76440 Paulson Rd Washburn, WI 54891 Note: 117 East Fifth Street PO Box 58 Washburn, WI 54891 (715) 373-6138 Fax: (715) 373-0114 E-mail:zoni na0bayfieldcou nty.wi.aov Web Site: www.bayfieldcounty.wi.00v Incomplete and/or unfinished applications expire 4 months from the date of this letter. RE: Special Use Application (Classification List: Building Contractor (Equipment & Material Storage) / Ordinance: Section 13-1-62(a)) consisting of (1) existing pole building for storage, office, and occasional assembly and (1) proposed pole building used for cold storage/storage of equipment. Property is an F-1 zoning district; a 10.46- acre parcel (Tax ID# 35562), described as that part of the W 1/2 NE SW lying S of Paulson Rd described in Doc. 2019R- 578255; in Section 33, Township 49 North, Range 5 West, Town of Washburn, Bayfield County. WI. Mr. & Ms. Dahl: As you know, the Bayfield County Planning and Zoning Committee conducted a public hearing / meeting on November 16, 2023, where Alessandro Hall, AZA, Planning and Zoning Dept. informed the Committee of your application for the above mentioned. After discussion and review, the Planning and Zoning Committee approved your request with conditions based on relevant public input and on the recommendation of Town Plan Commission and the Town Board, The approval includes the following: ➢ Classification List: Building Contractor (Equipment & Material Storage) / Ordinance: Section 13-1-62(a) o Granted: One existing pole building for storage office use and occasional assembly, and for one new pole building to be used for cold storage of equipment with the following conditions: The placement of erosion control along the east drip line of the roof to prevent the fill from eroding at the back of the new building and establish a dry swale between the building and property line so that roof runoff will seep into the sandy soil on site and not create gullies extending from the site to neighboring properties • To maintain the forested appearance of this district, add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to develop natural vegetative screening along the road Drafted by: Bayliield Co Planning and Zoning Dept (dak-10/19/2023-8:14am) k:zc/letters/2023/#9sept2023/koran Proofed by: n' • Place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly towards adjacent properties • Maintain normal business hours for traffic, truck deliveries, and noise on site from 6:00 AM to 6:00 PM • No human habitation in either of the pole buildings • Assembly of modular components may only be a minor component of the buildings use and may only be done inside the buildings • Hours of operation (Monday through Saturday) Additional Conditions placed by (Planning and Zoning Dept) 1. Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered 2. Land use permits shall be obtained prior to the initiation of construction or a change in land use 3. Must Meet and Maintain Setbacks 4. Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required 5. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams 6. May not be used for Human Habitation or Living Space. 7. No Sewer and Water allowed in the Structure. 8. Sanitation requirements must be met (if applicable) 9. Additional conditions may be placed and need to be adhered to at the time of permit issuance Congratulations on obtaining this approval. Be advised any aggrieved party has the right to appeal this decision to the Board of Adjustment within thirty (30) days. Enclosed is a copy of the affidavit prepared by this Dept. setting forth the terms and conditions of your permit. Your $30 check and the original affidavit will be taken to the Reg. of Deeds Office for recording. After recordation, your permit card will be mailed to you provided all requirements have been met and/or submitted. Please note, receiving approval from the Planning and Zoning Committee at the meeting, does not authorize the beginning of construction or land use, you must first obtain individual land use application(s) / permit(s) from the Planning and Zoning Department. Terms and conditions of your permit shall be binding upon, and inure to the benefit of, all current and future owners of such property. k:zc/letters/2023/#11 MW023/dahl dak (12/28/2023-3:10pm) Proofed by: i�H Also, this permit entitles you to the work specifically described in the application and plans, and as limited by any conditions of this permit. No changes in the proiect or plans maybe made without prior approval of the Barfield County Planning and Zoning Committee. The issuance of this permit does not relieve you of your responsibility to obtain a permit or approval required by your township, State of WI, or federal authority (i.e., US Army Corps of Engineers). Be advised your Special Use permit shall automatically terminate 24 months from its date of issuance if the authorized building activity, land alteration or use has not begun within such time. If your Special Use is discontinued for 36 consecutive months, the permit authorizing it shall automatically terminate, and any future use of the building(s) or property to which the permit pertained shall conform to Ordinance. Any person aggrieved by a decision of the Planning and Zoning Director and/or Planning and Zoning Committee, may request a public hearing before the Board of Adjustment. The appeal notice shall be filed with the Planning and Zoning Director within thirty (30) days after written notice of the order or decision appealed from was sent by first class mail to the aggrieved party. Thank you for your cooperation and please let our office know if you have any questions or comments. Sincerely, Ruth Hulstrom, AICP/Director Planning and Zoning Dept. enc: copy of affidavit cc: Kerry Tetzner, Town Clerk, 29450 Nevers Rd, Washburn, WI 54891 Office File k:zc/letters/2023NI /nov2023/dahl dak (12/28/2023-3:10pm) Proofed by: Akk AFFIDAVIT On November 16, 2023, the owner(s) were granted by the Bayfield County Planning and Zoning Committee a: Special Use 13-1-41 A Classification List Building Contractor (Equipment & Material Storage) Ordinance 13-1-62(a) Request One (1) existing pole building for storage, office, and occasional assembly and (1) proposed pole building used for cold storage/storage of equipment Property Owner: Hans & Lauren Dahl Property Description: an F-1 zoning district; a 10.46- acre parcel (Tax ID# 35562), described as that part of the W 1/2 NE SW lying S of Paulson Rd, described in Doc. 2019R-578255 (see Exhibit A); in Section 33, Township 49 North, Range 5 West, Town of Washburn, Bayfield County. WI. This use of the property is subject to the following terms and conditions: ➢ Classification List: Building Contractor (Equipment & Material Storage) / Ordinance: Section 13-1-62(a) • Granted: One existing pole building for storage office use and occasional assembly, and for one new pole building to be used for cold storage of equipment with the following conditions: ➢ The placement of erosion control along the east drip line of the roof to prevent the fill from eroding at the back of the new building and establish a dry swale between the building and property line so that roof runoff will seep into the sandy soil on site and not create gullies extending from the site to neighboring properties ➢ To maintain the forested appearance of this district, add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to develop natural vegetative screening along the road ➢ Place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly towards adjacent properties ➢ Maintain normal business hours for traffic, truck deliveries, and noise on site from 6:00 AM to 6:00 PM ➢ No human habitation in either of the pole buildings ➢ Assembly of modular components may only be a minor component of the buildings use and may only be done inside the buildings ➢ Hours of operation (Monday through Saturday) Additional Conditions placed by (Planning and Zoning Dept) 1. Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered 2. Land use permits shall be obtained prior to the initiation of construction or a change in land use 3. Must Meet and Maintain Setbacks 4. Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required Drafted By: Bayfield Co Planning and Zoning Dept. (dak-12/28/2023-3:54pm) k/zc/affidavit/2023/#11 nov/dahl Proofed by: 5. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams 6. May not be used for Human Habitation or Living Space 7. No Sewer and Water allowed in the Structure. 8. Sanitation requirements must be met (if applicable) 9. Additional conditions may be placed and need to be adhered to at the time of permit issuance The purpose of this affidavit is to make the foregoing a matter of public record in the office of the Bayfield County Register of Deeds, per Bayfield County Planning & Zoning Ordinance Title 13 Chanter 1 Article C. Section 13 1 41A 'if a special use permit is approved with conditions, an appropriate record shall be made of the land use and structures permitted, and prior to the issuance of a Class B permit the Zoning Department shall record with the Bayfield County Register of Deeds an affidavit prepared by the Zoning Department setting forth the terms and conditions of the permit and a legal description of the property to which they pertain. The recording fee shall be paid by the applicant. The terms and conditions of a special use permit of either class shall be binding upon and inure to the benefit of all current and future owners of the property to which it pertains unless otherwise expressly provided by the permit, or unless the permit terminates under subsection (d) of this section." Also, this permit entitles you to the work specifically described in the application and plans, and as limited by any conditions of this permit. No changes in the project or plans may be made without prior approval of the Bayfield County Zoning Committee. The issuance of this permit does not relieve you of your responsibility to obtain a permit or approval required by your township, State of WI, or federal authority (i.e., US Army Corps of Engineers). Be advised your special use permit shall automatically terminate 24 months from its date of issuance if the authorized building activity, land alteration or use has not begun within such time. If your special use is discontinued for 36 consecutive months, the permit authorizing it shall automatically terminate, and any future use of the building(s) or property to which the permit pertained shall conform to Ordinance. Bayfield County Planning & Zoning Dept. Governmental Official Printed Name and Title: Ruth E Hulstrom, Direct P& A'• kM moo: ••'• - e iature of Govemme KU)),fii� VAR y S ? On this 'Jra day of This instrument was signed before me in the State ot Wisconsin,fs6unty of Bayfield on this0 day of _n�, 2024 by: l J D raA 0. T "�-�( )� Notary Public My commission expires on: 11-- I —07 Receiving approval from the Planning and Zoning Committee at the meeting does not authorize the beginning of construction or land use; you must first obtain land use application/permit card(s) from the Zoning Department. Drafted By: Bayfield Co Planning and Zoning Dept. (dak-12/28/2023-3:54pm) k/zc/affidavit/2023/#11 nov/dahl Proofed by: RECEIVED AFFIDAVIT JAN 0 9 20Z4 DOCUMENT NUMBER 2024R-601767 Bayfield Co. On November 16, 2023, the owner(sjuawlg @n"ROOV� the Bayfield County Planning and Zoning Committee a: Special Use 13-1-41 A Classification List Building Contractor (Equipment & Material Storage) Ordinance 13-1-62(a) Request DANIEL J. HEFFNER REGISTER OF DEEDS BAYFIELD COUNTY. WI RECORDED O 1 /05/2024 AT 9:48 AM RECORDING FEE: $30.00 PAGES: 4 Return to: Bayfield County Planning & Zoning One (1) existing pole building for storage, office, and occasional assembly and (1) proposed pole building used for cold storage/storage of equipment Property Owner: Hans & Lauren Dahl Property Description: an F-1 zoning district; a 10.46- acre parcel (Tax ID# 35562), described as that part of the W 1/2 NE SW lying S of Paulson Rd, described in Doc. 2019R-578255 (see Exhibit A); in Section 33, Township 49 North, Range 5 West, Town of Washburn, Bayfield County. WI. This use of the property is subject to the following terms and conditions: ➢ Classification List: Building Contractor (Equipment & Material Storage) / Ordinance: Section 13-1-62(a) • Granted: One existing pole building for storage office use and occasional assembly, and for one new pole building to be used for cold storage of equipment with the following conditions: ➢ The placement of erosion control along the east drip line of the roof to prevent the fill from eroding at the back of the new building and establish a dry swale between the building and property line so that roof runoff will seep into the sandy soil on site and not create gullies extending from the site to neighboring properties ➢ To maintain the forested appearance of this district, add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to develop natural vegetative screening along the road ➢ Place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly towards adjacent properties ➢ Maintain normal business hours for traffic, truck deliveries, and noise on site from 6:00 AM to 6:00 PM ➢ No human habitation in either of the pole buildings ➢ Assembly of modular components may only be a minor component of the buildings use and may only be done inside the buildings ➢ Hours of operation (Monday through Saturday) Additional Conditions placed by (Planning and Zoning Dept) 1. Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered 2. Land use permits shall be obtained prior to the initiation of construction or a change inland use 3. Must Meet and Maintain Setbacks 4. Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required Drafted By: Bayfield Co Planning and Zoning Dept. (dak-12/28/2023-3:54pm) k/zc/affidavit/2023/#11 nov/dahl Proofed by: 5. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams 6. May not be used for Human Habitation or Living Space. 7. No Sewer and Water allowed in the Structure. 8. Sanitation requirements must be met (if applicable) 9. Additional conditions may be placed and need to be adhered to at the time of permit issuance The purpose of this affidavit is to make the foregoing a matter of public record in the office of the Bayfield County Register of Deeds, per Bayfield County Planning & Zoning Ordinance, Title 13, Chanter 1, Article C. Section 13-1-41A: "If a special use permit is approved with conditions, an appropriate record shall be made of the land use and structures permitted, and prior to the issuance of a Class B permit the Zoning Department shall record with the Bayfield County Register of Deeds an affidavit prepared by the Zoning Department setting forth the terms and conditions of the permit and a legal description of the property to which they pertain. The recording fee shall be paid by the applicant. The terms and conditions of a special use permit of either class shall be binding upon and inure to the benefit of all current and future owners of the property to which it pertains unless otherwise expressly provided by the permit, or unless the permit terminates under subsection (d) of this section." Also, this permit entitles you to the work specifically described in the application and plans, and as limited by any conditions of this permit. No changes in the project or plans may be made without prior approval of the Bayfield County Zoning Committee. The issuance of this permit does not relieve you of your responsibility to obtain a permit or approval required by your township, State of WI, or federal authority (i.e., US Army Corps of Engineers). Be advised your special use permit shall automatically terminate 24 months from its date of issuance if the authorized building activity, land alteration or use has not begun within such time. If your special use is discontinued for 36 consecutive months, the permit authorizing it shall automatically terminate, and any future use of the building(s) or property to which the permit pertained shall conform to Ordinance. Bayfield County Planning & Zoning Dept. Governmental Official Printed Name and Title: Ruth E Hulstrom, Direct Pp,H A' kM! Signature of Gov mine �I.( A R On this 3ra day of This instrument was signed before me in the State oJ Wisconsin„ima�, GeGehunt off Bayfield on thi� day of 2024 by: Lulu raA Q. I l' _ _'lvJ Notary Public My commission expires on: II I —Jr Receiving approval from the Planning and Zoning Committee at the meeting does not authorize the beginning of construction or land use; you must first obtain land use application/permit card(s) from the Zoning Department. Drafted By: Bayfield Co Planning and Zoning Dept. (dak-12/28/2023-3:54pm) k/zc/affidavit/2023/#11 nov/dahl Proofed by: RECEIVED OCT C 2 2023 Sayfield Co. Plannin 6ocument N1rj � umbed State Bar of Wisconsin Form 3-2003 QUIT CLAIM DEED THIS DEED, made between MANS & DAH L Document Name ("Grantor," whether one or more), and Hans S. Dahl and Lauren E. Dahl, husband and wife, with rights of survivorship marital property ("Grantee," whether one Or more). Grantor quit claims to Grame the following described real estate, together with the rents, profits, fixtures and other appurtenant interests, in Bayfield County, State of Wisconsin {"Property") (if more space is needed, please attach addendum): (SEE ATTACHED EXHIBIT A) DENISE TARASEWICZ BAYFIELD COUNTY, WI REGISTER OF DEEDS 2019R-578255 16/ OF 2019gM 10 : 55AM RECOMING SEE: $30.00 PAGES: 2 Area Nente east Return Address Spears, Carlson & Coleman, SC PO Box 547 Washburn, W154891 04-00-2-49-05-33-3 01-040-22000 'Parcel Identification Number (PIN) This is not homestead property. (4 (is not) Dated J4 (4 2019 (SEAL) (SEAL) • * HANS S. DAHL AUTHENTICATION Signatures) (SEAL) (SEAL) ACKNOWLEDGMENT STATE OF WISCONSIN ) authenticated on BAYFIELD TITLE: MEMBER STATE BAR OF (If not, +►! authorized by Wis. Sta THIS INSTRUMENT DRAF Atty, John R. Carlson, SBN Sn earn, Carbon & Cokman NOTE: THIS IS A QUIT CLA1M DEED *Type name below sig► wrft ss. COUNTY) Personally came before me on g jA 15 92019 the above -named HANS S. DAHL 5!�N t 1 _, to me known to be the person(s) who executed the foregoing 6') -•., instrument and acknowledged the same. Notary Public, State of Wisconsin My commission (is permanent) (expires: r-".nW b! ted or acknowdedgetL Both art not netemry.) ODIFICATION TO THIS FORM SHOULD BE CLEARLY IDENTIFIED. �w N wa 03 STATE BAR OF WISCONSIN FORM NQ 3-2003 Wf0-FRO* Leal Fermi - (aOD)6 &MI • Wgx brme.eom 5 RECEIVED c► .Of 0 2 2023 Bayfield Co. Planning af'-d Zoning Agency E IBIT A That part of the West Half of the Northeast Quarter of the Southwest Quarter (W At NE 1/4 SW '/4). Section Thirty-three (33), Township Forty-nine (49) North, Range Five (5) West, in the Town of Washburn, Bayfield County, Wisconsin, lying south of the centerline of Paulson Road, and described as follows: To locate the Point of Beginning, commence at the W 3/4 corner of said Section 33 and run N 89046'58" R,1321.33 along the E-W '/4 line of said Section 33, to a 1-1/4" iron pipe at the CW 1/16 corner. Thence leaving said E-W Kline and along the west line of said NE %4 of the SW %4, S 01005146"' E,1303.34 feet to a 1-1/4" iron at the SW 1/16 comer and the Point of Beginning. Thence from said Point of Beginning by metes and bounds: N 89046931" E, 660.90 feet along the south line of said NE K of the SW '/4 to a 1-1 /4" iron pipe. Thence leaving said south line, N 01005'09" E,1281.99 feet (passing through a 1-1/4" iron pipe at 1248.24 feet) to the centerline of Paulson Road. Thence along said centerline, 199.00 feet, southwesterly, along the arc of a curve to the left, having a radius of 150.98 feet, a central angle of 75031'08" and a chord which bears S 44146'26" W and measures 184.91 feet. Thence 315.74 feet, southwesterly, along the arc of a curve to the right, having a radius of 528.84 feet, a central angle of 34112'2T' W and measures 311.07 feet. Thence S 41 ° 13' 19" W, 210.0 feet. Thence S 44015'00" E, 160.00 feet. Thence S 51035100" W, 130.00 feet. Thence S 55°10'00" W, 56.51 feet to the west line of said NE % of the SW %4. Thence leaving said centerline and along said west line, S 01 005'46" W, 288.04 feet (passing through a 1-1 /4" iron pipe at 39.84 feet) to the Point of Beginning. Drafted by: Spears, Carlson & Coleman, S.C. Washburn, WI 54991 Review Che Tax l D#: - • sv".j 1-%� S o� Legal Description. ! `� Ckllst Address: -7 'V LtPC, ,I S P(? UI Sd Zoning District: ❑ R-1 ❑ R-2 ❑ R-3 ❑ R-4 ❑ R-RB ❑ C 111 ❑ M ❑ A-1 ❑ A-2 ;(F-1 ❑ F-2 ❑ W ❑ M-M Overlay District: Shoreland:�No ❑ Yes If yes, is impervious surface form requiredA No ❑ Yes If yes, is impervious surface form attached ❑ No ❑ Yes Wetland No ❑ Yes Ownership Information Accurate? pplication signed ❑ Letter of Authorization (if applicable) ❑ Affidavit of Authority (if applicable) Legal Information Accurate? ❑ No es Proposed project previously granteathp granted by variance? ❑ No ❑ Yes, Case #: Is Structure Nonconforming? ❑ No ❑ Yes If yes, attach documentation Is Mitigation Required? ❑ No ❑ Yes If yes, is Mitigation attached? ❑ No ❑Yes Boundary Line Determination: ❑ North Lot Line ❑ South Lot Line ❑ West Lot Line; East Lot Line Is Structure within 30 feet of required setback/s? Applicable lot lines were: ❑ Visible from one previously surveyed corner to other previously surveyed corner ❑ Verified by staff with corrected compass ,* Marked by licensed surveyor feet ❑ North Lot Line ❑ South Lot Line ❑ West Lot Line)d East Lot Line Is Structure within 10 of required setback/s? Applicable lot lines were: ❑ Visible from one previously surveyed corner to other previously surveyed corner DMarked by licensed surveyor Section # Regulation Required Applicant's Lbt 13-1-60 Lot Area Arc r" 'S 13-1-60 Lot Width 13-1-26 Is lot Sub -standard? U Yes LXNo Buildable Yes ❑ No if yes, attach Deed of Record or Variance 13-1-22(h) I Height (Shoreland) 1 35" is Sanitary required for project?)$ No ❑ Yes if yes, Sanitary # Sanitary Date: I # of bedrooms: if addition/alteration, were Access, Carmody, files reviewed for prior additions that would exceed the 250 sq. ft. lifetime maximum? ❑ No ❑ Yes if yes, sanitary # Are fee payments correct? ❑ No KYes Hold For:. ❑ ❑ Sanitary ❑ ❑ TBA ❑ . ❑ Fee payment ❑ , 0 0 ,+ i Inspected By: Date' of Inspection: Comments/Notes: ( ( �� (r> Qjwn el } fans Y "� I �� P���� �� f 10111V2,3 bill fue �v1d,�y . c�����+�d SPuCe(�,1W �1�F04N CC belly \rsed co l esJ C'n CC- Inspected By: Comments/Notes: Date of Re -Inspection: Denied by: Reason for Denial: Date of Denial: Are Town, Committee, and BOA conditions attached?W Yes El No If no, they need to be attached Approved by: ��� lls�p� Condition(s): 0 SeC �4i cl C�c� Coy n , f+ce vi Date of Approval: •w�P� Permit#: C��S Amount Paid: o yl(\ Refund: Date Issued: Q CC/ Date: - -,-y�r . r" Date: Town, City, Village, State or Federal Permits May Also Be Required LAND USE — X SANITARY — SIGN — SPECIAL — X (B) (Tn of Wash bu rn-1 1/14/2023 CONDITIONAL — X BOA — No. 24-0025 Tax ID: 35562 BAYFIELD COUNTY PERMIT WEATHERIZE AND POST THIS PERMIT ON THE PREMISES DURING CONSTRUCTION Issued To: HANS S & LAUREN E DAHL THAT PART OF THE W % Location: NE % of SW '/4 Section 33 Township 49 N. Range 5 W. Town of Washburn LYING S OF PAULSON RD DESC IN DOC 2019R-578255 Gov't Lot Lot Block Subdivision CSM# For: One existing pole building for storage office use and occasional assembly, and one new pole building to be used for cold storage of equipment: (100' x 75') = 7500 sq ft Height 22' (Disclaimer): Any future expansions or development would require additional permitting. The Planning and Zoning Department does not authorize the beginning of any construction or land use; you must first obtain land use application(sl/permit(s) from the Planning and Zoning Department. You (the property owner) shall fulfill the conditions placed by the Planning and Zoning Committee and/or Dept; your recorded affidavit; sanitary (if applicable) and/or any additional requirements placed by this Department. The Planning and Zoning Department requires verification/proof that all conditions have been met. Any future expansions or development would require additional permitting. Condition(s): SEE BACK OF CARD NOTE: Special Use permit shall automatically terminate 24 months from its date of issuance if the authorized building activity, land alteration or use has not begun within such time. If your Special Use is discontinued for 36 consecutive months, the permit authorizing it shall automatically terminate, and any future use of the building(s) or property to which the permit pertained shall conform to Ordinance. Changes in plans or specifications shall not be made without obtaining approval from Planning and Zoning Committee. This permit may be void or revoked if any of the application information is found to have been misrepresented, erroneous, or incomplete. Alessandro Hall, AZA Authorized Issuing Official February 6, 2024 Date This permit may be void or revoked if any performance conditions are not completed or if any prohibitory conditions are violated. CONDITIONS: The placement of erosion control along the east drip line of the roof to prevent the fill from eroding at the back of the new building and establish a dry swale between the building and property line so that roof runoff will seep into the sandy soil on site and not create gullies extending from the site to neighboring properties To maintain the forested appearance of this district, add native shrubs between Paulson Road and the pole buildings that will more rapidly grow to develop natural vegetative screening along the road Place shields and maintain motion sensors on all exterior lights so that lights shine downward around the buildings and is diverted from shining directly towards adjacent properties Maintain normal business hours for traffic, truck deliveries, and noise on site from 6:00 AM to 6:00 PM No human habitation in either of the pole buildings Assembly of modular components may only be a minor component of the buildings use and may only be done inside the buildings Hours of operation (Monday through Saturday) Additional Conditions placed by (Planning and Zoning Dept) 1. Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered 2. Land use permits shall be obtained prior to the initiation of construction or a change in land use 3. Must Meet and Maintain Setbacks 4. Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required 5. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams 6. May not be used for Human Habitation or Living Space. 7. No Sewer and Water allowed in the Structure. 8. Sanitation requirements must be met (if applicable)