HomeMy WebLinkAbout25-0164Return to: i5 County Use Onl
11") E S:h Street, PO Box 58 Bayfield County Planning antdd�,7ro �p elu�t I Submission #:
Washburn, W1 54891 LAND USE PERMIT
I Permit #:
Permits�bavfieldcountv.wigov I,I I�_ APR 15 2025 I(- Date:
SECTION A: General Information
Property Owner Name:
Authorized Agent Name (if applicable):
Cable Union Airport Commission
John Pohle
Telephone Number:
Telephone Number:
(715) 798-3240
(843) 296-7911
E-Mail Address:
E-Mail Address:
cableairport@chegnetnet
johnpohle@gmail.com
Mailing Address:
Mailing Address:
P.O. Box 248
531 N Palmetto Ave
City, State, Zip:
City, State, Zip:
1
Cable, WI 54821
Sanford, FL 32771
Contractor: Telephone Number: E-Mail Address:
John Pohle (Owner) (843) 296-7911 ohnpohle@gmail.com
SECTION B: Property Information
Project Address (if different from mailing address):
42905 Telemark Rd, Cable, WI 54821
Legal Description (if additional space is needed attach a separate sheet):
SW NE Less V.242 P.12 387
Section, Township, Range: S21, T43N, R07W Town of Cable
Tax ID #: 8958 Lot Size (Acres/Square Feet): 39Ac
ECTION C: Pro'ectInformation check all that 1 '
Project Use is: ❑ Residential ❑ Commercial 0 Municipal
Project Type is: Z New Construction ❑ Addition/Alteration (existing structure)
❑ Change Use (existing structure) ❑ Relocate (existing structure) ❑ RV Placement 21+ days
❑ Sign ❑ Establishing a Business ❑ Temporary (12 or less months)
❑ Shoreland Grading, Class A ❑ RV Placement 4+ months, Class A ❑ Other (describe):
Total sq ft): required
-required
SECTION D: Structure Information Does not a pl to RVs and Signs, goto Sec[idn E
Struclmr hype is: ❑ Residence ❑ Principal Structure (describe):
0 Accessory Structure (describe): ❑ Shoreland Exempt Structure (describe): ❑ Mobile Home (provide manufactured
Airplane Hanger date):
❑ Shipping Container ❑ Other (describe):
Foundation Type:
❑ Basement ❑ Walkout Basement X Slab ❑ Crawlspace ❑ Ground ❑ Skids ❑ Other (explain):
Fxisting Structure: Len Width: Height:
Proposed Structure (Provide Sq Ft based on outside dimensions, including unfinished areas, attached garages/above grade
decks/ orches):
Basement Sq Ft:
I� Floor Sq Ft:
Loft Sq Ft:
2"c Floor Sq Ft:
3r1 Floor Sq Ft:
Garage Sq Ft:
Porch Sq Ft:
Deck Sq Ft:
Other Sq Ft (describe):
Other Sq Ft (describe):
3600 Sqft Hanger
Total Sq Ft: 3soo
Overall Height (finished grade to peak): 24'
# of Stories: 1 Existing # of Bedrooms on property:0
Proposed # of Bedrooms in project: 0
SECTION E: IR- nformatio a "' 1
Sign is:
RV is:
❑ New ❑ Replacement
❑ New ❑ Replacement
❑ On -premise ❑ Off -premise
❑ 1-sided ❑ 2-sided
Year: Vin #:
❑ On -building ❑ Multi -Tenant
Length: Width: Height:
Make: Model:
APR 1 5 2025
SECTION F: Site Plan —attach a site plan or draw site plan in box below (Seepages 1 & 2 of Land Use&ermit A,,ppplic-:
Information for information that is required to be provided on site Ian ayfleld U0. !0..
Show location of:
❑ Driveways ❑ Frontage Roads (include name) ❑ Existing Structures ❑ Well (W) ❑ Septic Tank (ST) ❑ Drain Field (DF)
❑ Holding Tank (HT) ❑ Privy (P) ❑ Lake ❑ River ❑Stream/Creek ❑Pond ❑Flood lain ❑ Wetlands ❑Slopes over 20%
N
Setback or distance from furthest extent of structure
including eaves and overhangs to (include on site plan):
County Use Only
Verified setbacks
Road Centerline
ft.
ft.
7 o ft.
Notes/Comments:
Front Lot Line/Right-of-Way
ft.
Side Lot Line 1
North❑East❑South❑West❑ check one
ft.
ft.
710
Side Lot Line 2
orth❑East❑South❑West❑ check one
ft.
7 (b ft.
Rear Lot Line
2 tp ft.
Septic/Holding Tank
ft.
ft.
Drainfield
ft.
ft.
Privy
ft.
ft.
Well
Existing Structure/Building
Wetland
ft.
7 -yr ft.
Elevation of Floodplain
ft.
ft.
Ordinary High -Water Mark (OHWM)
I
ft.
Other (describe)
ft.
ft.
N
E C r I V E n
APR 1 ?fl?h IUI
ditionai Ouestious
O Yes
❑ No
Has the location of the proposed project including eaves and overhangs and the sanitary system and, wmwwi
staked? If no what date will this be completed:
O Yes
❑ No
Did a licensed surveyor mark lot line(s) if project is within 10 feet of required setback? See page 2 of Land Use
Application Information for required setbacks.
O Yes
❑ No
Did property owner or applicant mark lot line(s) if project is within 30 feet of required setback? See page 2 of
Land Use Application Information for required setbacks.
❑ Yes
❑ No
Is there an existing sanitary system on the property? If yes, what kind?
❑ Drainfield ❑ Holding Tank ❑ Municipal/Public ❑ Other (describe): Unknown for entire airport.
El Yes
❑ No
Will pressurized water be installed in the structure? If yes, what kind of sanitary system will be installed or used
to manage wastewater?
❑ Drainfield O Holding Tank ❑ Municipal/Public ❑ Other (describe):
❑ Yes
O No
Will sleeping occur in the structure? Ifyes, contact local Uniform Dwelling Code (UDC) for approval and
inspection requirements.
Is the project associated with any of the following:
❑ Rezone ❑ Class A Special Use ❑ Class B Special Use ❑ Conditional Use ❑ Variance
Fee payment will be made via:
❑ Check (attached) ❑ Cash (attached) EI debiUcredit/echeck (department to call once payment is ready to be taken)
How would you like to receive your permit card?
❑ Mail to: OR El Email to:
❑ Property Owner Address El Agent Address ❑ Contractor Address ❑ Other (provide Name and Email or Address):
johnpohle@gmail.com
"Section H: Acknowled ementand Signatun
All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary Permit
issuance, if required, needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a
permit will result in penalties.
The local Town, Village, City, State or Federal agencies may also require permits. The new construction of one- & two-family
dwellings requires review and approval by the local Uniform Dwelling Code (UDC) authority. Additions and alterations to one -
and two-family dwellings may require review and approval by the UDC authority. All municipalities are required to enforce the
UDC.
If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all necessary
approvals and recorded documents required to complete the project for which this permit is sought including requirements set forth
in Wisconsin statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the
property is located, and all other rules, regulations and requirements pertaining to that Condominium Association.
You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams.
Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or
modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural
Resources wetlands identification web page, dnr.wi.gov/topic/wetlands, or contact a Department of Natural Resources service
center(715)685-2900.
I (we) declare that this application, including any accompanying information, has been examined by me (us) and to the best of my
(our) knowledge and belief it is true, correct, and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and
accuracy of all information that I (we) are providing and that will be relied upon by Bayfield County in determining whether to
issue a permit. I (we) further accept liability which may be a result of Bayfield County relying on this information 1(we) are
providing in or with this application. 1(we) consent to county officials charged with administering county ordinances to have
access to the above -described property at any reasonable time for the purpose of inspection.
Owner(s) or Authorized Agent Printed Name: hmP-w-
Owner(s) or Authorized Agent Signature: Ce/fIGiL A61&1e, Date: nos
NOTES: 61/1
1. If you are signing on behalf of the owner(s) a letter of authorization must accompany this application.
2. Specific conditions/instructions may be stated on the face of the issued Land Use Permits. Owners, agents, & contractors
must all be aware of permit details & conditions and permit card must be posted on property por to start of project.
Hanger Site 12
9�I =WR �IYY
� IIGK1[IMUl1<
�r�fl �• I � �r
r•
:o7x r• _ I E'1�
Iw, 41 Iplr
Wbhp� 1 r'
' uz fu.Yp oo
W � INNYN• ilk
Nx�
�.vnmrn I=WT In.u1N 1)w�w
IINA=N�r '-wA VL ' wM aII11
�� � i � ►Iw
rrn._ - 1 wvW wwP�
.T �JCX CULT 7FThL
0.14
wwwAw
BMM�
i
' )h
w
r
�)
7�
4L
O
i
ILUII•IRISy.T JHI MVi
�-!1W
.ewmr.ww
-mow+ LEGEND
wlw)wwwa+sumc
a�,a w�
—s—
YPM)NIMWwNRwY1l:
-.'PI'wa°r'wP'
�=�rrts=unm
�NMPPY )iiA;
� •Iwva unw^
-
T 9RRR1
f_
� Rll)LLwt ..fVIAM
tv.n
(�
11'fi eiixxn � CLkl tlkl}�
{�� YWS:)IIIMYwM0.�5M1'.•1'F
m n Gov
7
rlj
O Ul Q-
2
O C4:
� N
CD
V
N
r
0111
111111 Jill iu� 11.11111111 1� I l� 1.111111
� i
\q
\ ( i�
a !
I Co
151, giru
2§mK
i 0
�/
�
---
» �
554�
Al
Him
YI
jajal
. . . . . ........
77
—77—
tom: f
7LssAa
A 172
A—/0
|
H
§�
|
�%| \
� %
�L
•!
I
(§
!
}
cm
$
�5549,
as i
E C � VE D
�l1 APR 1 5 2025
Bayfield Co. Zoning Dept.
Letter of Authorization
Bayfield County Planning & Zoning Department
PURPOSE. This Letter of Authorization is used to authorize a single property owner to act on
behalf of multiple property owners or a designated agent to act on behalf of the property owner/s.
If multiple property owners, each property owner must submit this signed letter.
L C441c anri.r /i e,&-,- (property owner), authorize+ &o
(authorized agent) to submila---� (Example: land use, special
use, conditional use, rezonelmap amendment, appeal, variance, text amendment, etc.) for the
following described project (Example: construction of resident or other structure, short-term
rental or other use change, etc.) � W a wC�e W !2 application on my behalf for
the following described property:
Legal description of subject property: awmrt vmn.,:ar
Address ofsub'eIX petty: �mosrwvxanaacvns.azt
r s / , G4{1LC Llazen 74�rir,.� C.n....iJta�r G�w.�.�t..r 1
S' �re JJ
Dated
Land Use Permit Application Review Checklist
r n f2 1
Submission #:
M V To
What zoning district is the project ocated in?
❑ R-1 ❑ R-2 ❑ R-3 ❑ R-4 R-RB ❑ C ❑ I ❑ M ❑ A-1 ❑ A-2 ❑ F-1 ❑ F-2 ❑ W ❑ M-M
❑ Yes No
Is lot substand rd (does not meet current zoning dimensional requirements)?
Deed of record:
❑ Yes 'rNo
Is the project located in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR
landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)?
❑ Yes �do
Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of
navigable waterway)
❑ Yes �IVo
Is the project located in the Floodplain?
Zone:
es ❑ No
Are there wetlands on the property?
❑ Yes o
Is project associated with a nonconforming use or structure?
❑ Yes No
Is project associated with a variance?
Case #:
❑ Yes I!lo
Is project associated with a Special B or Conditional Use Permit?
Permit #:
❑ Yes JTBnNo
Is the project associated with a Special A Use Permit?
Yes ❑ No
Does the project require sanitary?
❑ Existing Pew ❑ Intercept ❑ Reconnect ❑ Non -Plumbing ❑ Public
Sanitary Permit #:
❑ Yes o
r
Does the project require mitigation?
Implementation Deadline: Date of Compliance:
❑ Yes ¢k No
Does the project require an affidavit?
Affidavit #:
Yes ❑ No
Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback?
ffYes ❑ No
Did applicant/property owner mark lot Iine(s), If project is within 30 feet of required setback?
Project use is? ❑ Residential ommercial ❑ Municipal
Project type is7 New Construction ❑ Addition/Alteration ❑ Change Use ❑ Relocate ❑ RV Placement ❑ Sign
❑ Establishing a Business ❑ Temporary ❑Shoreland Grading ❑ Other, describe:
Structure Type is: ❑ Residence ❑ Principal Structure ANccessory Structure ❑ Boathouse (one story only)
❑ Open-sided/Screened Structure (gazebo, etc.) ❑ Stairway to navigable waters ❑ Mobile Home
[]Shipping Container ❑ Other, describe
Total Sq. Ft. of Project: j6 pQ Number of Stories:
Overall Height: .Z
Calculated Fee Category:
❑ Residential Principal Structures -$0.75/square foot (minimum $125)
❑ Habitable Residential Accessory Structures - $0.50/square foot (minimum $75)
❑ Non -Habitable Residential Principal and Accessory Structures - $0.20/square foot (minimum $75)
❑ Commercial/Municipal Principal Structures - $0.75/square foot (minimum $125)
mmercial/Municipal Accessory Structures - $0.20/square foot (minimum $75)
Calculated Fee Amount: Ou
Additional Fees: ❑ Return Inspection ❑ Land Use Revisions ❑ Special Use Permit - Class A ❑ After-the-Fact(ATF)
❑ Floodplain ❑ Shoreland - Impervious Surface ❑ Shoreland - Non -Conforming, etc. ❑ Tower Siting/Collocation 1
❑ Tower Collocation 2 ❑ Metallic Mine
ATF Fee Amount:
Inspected by:
Date of Inspection:
Re -Ins ected by:
Date of Re -Inspection:
Denied by:
Date of Denial:
Reason for Denial:
Date Denial Letter Mailed:
Approved by: Date of Approval:
Condition(s):
?�Must meet and maintain setbacks from furthest extension of structure including eaves and
overhangs.
For personal storage only.
For personal residence only.
Not for human habitation or sleeping purposes.
Town/State/DNR/Federal may require permitting
❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction.
❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained priorto the start of construction (if applicable).
�Kse best management practices to limit and prevent erosion during construction.
❑ This permit cannot be transferred if property is sold.
❑ A Bayfield County Health Dept permit is required.
❑ Check with Town regarding room tax.
❑ Short -Term Rental is for a maximum occupancy of persons.
❑ Sign must meet the requirements of Article E of the Bayfield County Zoning Ordinance.
❑ To be constructed per plan.
❑ Adhere to privy agreement.
❑ Temporary permit allowing existing structure for a period of less than 1 year.
❑ RV may not be used for permanent residence or storage.
❑ RV allowed for
❑ RV must be removed by
❑ No sewer and pressurized water allowed in the structure.
❑ No plumbing or plumbing fixtures allowed.
o additional sleeping areas allowed without obtaining necessary sanitary permit(s).
Land use permits shall be required for any new residence, any building or structure erected,
relocated, rebuilt, or structurally altered
land use permits shall be obtained prior to the initiation of construction or a change in land use
❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are
required
7psanitation requirements must be met (if applicable)
fO Additional conditions may be placed and need to be adhered to at the time of permit issuance
Other Conditions:
���s:w;t� �,la��✓ C^IA40 be— ir►s4lit
(non F. Sa vt� Pc✓�.
rs o6 fa.tip�
B�YFIELD Bayfield County
Planning & Zoning Department
117 E 5th Street
P.O. Box 58
Washburn, WI 54891
Phone: 715-373-6138
Fax: 715-373-0114
Property Owner:
Submission Number:
UNION AIRPORT
LU-01606
PO BOX 248
CABLE, WI 54821
Transaction Number:
LU-01606-28FA9
Description Amount
Verified Fee Amount $0.00
Commercial/Municipal and Accessory Structures - $720.00
$0.20/square foot (minimum $75)
Total: $720.00
Payment Amount: $737.14
Reference:1439905275
Paid by: undefined
Payment Type: Credit Card
Transaction Date: undefined
Receipt of payment does not guarantee eligibility of
permit and is not proof of issuance of a permit.
Town, City, Village, State or Federal
Permits May Also Be Required
Substandard — No / Nonconforming — No
Shoreland — No / Impervious Surface — No
Floodplain — No / Wetlands — Yes
Mitigation — No / Affidavit #:
LAND USE —X
SANITARY — New
SPECIAL A —
SPECIAL B/CONDITIONAL —
BOA —
No. 25-0164 Tax ID: 8958
Issued To: UNION AIRPORT
Location: S21 - T43N - R07W
Town of Cable
Legal Description: SW NE LESS V.242 P.12 387
Commercial Structure in R-RB zoning district
BAYFIELD COUNTY
PERMIT
WEATHERIZE AND POST THIS PERMIT
ON THE PREMISES DURING CONSTRUCTION
For: New Construction [1 - Story], Accessory Structure on a Slab [3600 Total sq. ft.] Height of 24'
(Disclaimery You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any
future expansions or development world require additional permitting
Condition(s): See back of card
NOTE: This permit expires two years from date of issuance if the authorized construction
work or land use has not begun.
Changes in plans or specifications shall not be made without obtaining approval.
This permit may be void or revoked if any of the application information is found
to have been misrepresented, erroneous, or incomplete.
This permit may be void or revoked if any performance conditions are not
completed or if any prohibitory conditions are violated.
Scott Roush
Authorized Issuing Official
April 17, 2025
Date
Condition(s): Pressurized water cannot be installed until sanitary permit is issued
Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs.
For personal storage only.
Not for human habitation or sleeping purposes.
Use best management practices to limit and prevent erosion during construction.
No additional sleeping areas allowed without obtaining necessary sanitary permit(s).
Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt,
or structurally altered
Land use permits shall be obtained prior to the initiation of construction or a change in land use
Sanitation requirements must be met (if applicable)