Loading...
HomeMy WebLinkAbout25-0260Town, City, Village, State or Federal Permits May Also Be Required Substandard – No / Nonconforming – No Shoreland – No / Impervious Surface – No Floodplain – No / Wetlands – No Mitigation – No / Affidavit #: LAND USE – X SANITARY – SPECIAL A – (Town of Cable – undefined) SPECIAL B/CONDITIONAL – 25-0245 BOA – No. 25-0260 Tax ID: 8954 Issued To: TOWNS OF NAMAKAGON, CABLE, & DRUMMOND Location: S21 - T43N - R07W Town of Cable Legal Description: LOT 1 CSM #1621 IN V.9 P.331 (LOCATED IN HW HE) 385B IM 2005R-503766 IM 2005R-501510 Municipal Structure in R-1 zoning district For: New Construction, Principal Structure on a Slab with Thickened Edge [1584 Total sq. ft.] Height of 26’ (Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams . Any future expansions or development would require additional permitting . Condition(s): See back of card NOTE: This permit expires two years from date of issuance if the authorized construction Scott Roush work or land use has not begun. Authorized Issuing Official Changes in plans or specifications shall not be made without obtaining approval. This permit may be void or revoked if any of the application information is found to have been misrepresented, erroneous, or incomplete. May 13, 2025 This permit may be void or revoked if any performance conditions are not Date completed or if any prohibitory conditions are violated. BAYFIELD COUNTY PERMIT WEATHERIZE AND POST THIS PERMIT ON THE PREMISES DURING CONSTRUCTION Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs. Not for human habitation or sleeping purposes. Use best management practices to limit and prevent erosion during construction. No additional sleeping areas allowed without obtaining necessary sanitary permit(s). Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered Land use permits shall be obtained prior to the initiation of construction or a change in land use