HomeMy WebLinkAbout25-0261Return to:
117 E 5`" Street, PO Box 58 ayfield County Planning and Zoning Department
Washburn, WI 54891 LAND USE PERMIT APPLICATION
perrnits@bayfieldcounty.wi.gov
County Use Only:
Submission #: LU — 011eNt1
Permit #: .Z —
Date: 5
SECTION A: General Information -.
Property Owner Name:
Authorized Agent Name (if applicable):
Ellen Russo & Steven Jones
Telephone Number:
Telephone Number:
651-328-4500 & 224-305-3161
RFCEIVED
E -Mail Address:
E -Mail Address:
ellenrusso6@gmail.com & spjonesl2l8@gmail.com
Mailing Address:
Mailing Address:
PO Box 169
City, State, Zip:
City, State, Zip: Planning and Zoning Agency
Bayfield WI 54814
Contractor:
Telephone Number:
E -Mail Address:
N/A
SECTION B: Property Information _ -- _
Project Address (if different from mailing address):
31100 State Highway 13 Bayfield WI 54814
Legal Description (if additional space is needed attach a separate sheet):
SW SW LESS PAR FOR HWY IN V.471 P.355 IN V.941 P.486 211 IN DOC 2023R-599262
Section, Township, Range: 518 T51N R04W Town of: Russell
Tax ID #: 29152 Lot Size (Acres/Square Feet): 3g.5Aaos
SECTION C: Project Information (check all that apply'
Project (':se is: O Residential O Commercial ❑ Municipal
Project Pype is: 17 New Construction ❑ Addition/Alteration (existing structure)
❑ Chang€ Use (existing structure) O Relocate (existing structure) O RV Placement 21+ days
❑ Sign ❑ Establishing a Business O Temporary (12 or less months)
❑ Shoreland Grading, Class A O RV Placement 4+ months, Class A O Other (describe):
required (Total sft): required
SECTION D: Structure Information (Does not apply to RVs and Signs, o to Section E)
Structure type is: ❑ Residence ❑ Principal Structure (describe):
O Accessory Structure (describe): ❑ Shoreland Exempt Structure (describe): ❑ Mobile Home (provide manufactured
Workshop date):
❑ Shipping Container ❑ Other (describe):
Foundation Type:
❑ Basement O Walkout Basement O Slab El Crawlspace O Ground O Skids ❑ Other (explain):
Existing Structure: RV Length: it Width: 6' Height:, -
Proposed Structure (Provide Sq Ft based on outside dimensions, including unfinished areas, attached garages above grade
decks/porches):
Basement Sq Ft:
1s' Floor Sq Ft:
Loft Sq Ft:
2n° Floor Sq Ft:
3'° Floor Sq Ft:
512
Garage Sq Ft:
Porch Sq Ft:
Deck Sq Ft:
Other Sq Ft (describe):
Other Sq Ft (describe):
64
Total Sq Ft: 576
Overall Height (finished grade to peak): 16' 6"
# of Stories: 1
Existing # of Bedrooms on property:1 Proposed # of Bedrooms in project: 0
SECTION E: RV and Sign Information (check all
Sign is:
RV is:
❑ New ❑ Replacement
O New ❑ Replacement
❑ On -premise ❑ Off -premise
❑ I -sided O 2 -sided
Year: Vin #:
❑ On -building O Multi -Tenant
Length: Width: Height:
Make: Model:
SECTION F: Site Plan — attach a site plan or draw site plan in box below (See pages I & 2 of Land Use Permit Application
Information for information that is required to be provided on
site plan)
Show location of:
E) Driveways ❑ Frontage Roads (include name) El Existing
Structures O Well (W) ❑ Septic Tank (ST) ❑ Drain Field (DF)
0 Holding Tank (HT) El Privy (P) ❑ Lake 0 River ❑Stream/Creek ❑Pond ❑Floodplain DWetlands ❑Sloes over 20%
N
RECEIVED
MAY 05 2025
- -
Bayfield Co.
PlannIng and Zoning Agency
)
Setback or distance from furthest extent of structure
County Use Only
including eaves and overhangs to (include on site plan):
Verified setbacks
Road Centerline
383
ft.
p{- ft.
Notes/Comments:
/„
Ul
Front Lot Line/Right-of-Way
330 ft.
2oo< ft.
Side Lot Line I
1 000
ft.
n ft.
North❑East❑South❑West❑,check one)
,
O(.UO+
Side Lot Line 2
" ,t ft.
00
ft.
4
North9East❑South❑West❑ check one
Rear Lot Line
>1,000 ft.
ft.
Septic/Holding Tank
N/A ft.
ft.
Drainfield
N/A ft.
ft.
Privy
200 ft.
V ft.
Well
100 ft.
ft.
Existing Structure/Building
100 ft.
ft.
Wetland
N/A ft.
ft.
Elevation of Floodplain
N/A ft.
ft.
Ordinary High -Water Mark (OHWM)
N/A ft.
ft.
Other (describe)
ft.
ft.
RECEIVED
SECTION G: Additional
Questions
El Yes
❑ No
Has the location of the proposed project including eaves and overhangs and the sanitary system�nd 'eebeen
staked? If no, what date will this be completed: pnilY�
❑ Yes
El No
Did a licensed surveyor mark lot line(s) if project is within 10 feet of required setback? See page 2 of Land Use
Application Information for required setbacks.
❑ Yes
El No
Did property owner or applicant mark lot line(s) if project is within 30 feet of required setback? See page 2 of
Land Use Application Information for required setbacks.
O Yes
❑ No
Is there an existing sanitary system on the property? If yes, what kind?
❑ Drainfield ❑ Holding Tank ❑ Municipal/Public El Other (describe): Privy
El Yes
El No
Will pressurized water be installed in the structure? If yes, what kind of sanitary system will be installed or used
to manage wastewater?
❑ Drainfield ❑ Holding Tank ❑ Municipal/Public O Other (describe):
❑ Yes
El No
Will sleeping occur in the structure? If yes, contact local Uniform Dwelling Code (UDC) for approval and
inspection requirements.
Is the project associated with any of the following:
❑ Rezone O Class A Special Use ❑ Class B Special Use ❑ Conditional Use O Variance
Fee payment will be made via:
El Check (attached) El Cash (attached) ❑ debit/credit/echeck (department to call once payment is ready to be taken)
How would you like to receive your permit card?
❑ Mail to: OR El Email to:
El Property Owner Address ❑ Agent Address ❑ Contractor Address ❑ Other (provide Name and Email or Address):
Section H: Acknowledgement and Signature
All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary Permit
issuance, if required, needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a
permit will result in penalties.
The local Town, Village, City, State or Federal agencies may also require permits. The new construction of one- & two-family
dwellings requires review and approval by the local Uniform Dwelling Code (UDC) authority. Additions and alterations to one -
and two-family dwellings may require review and approval by the UDC authority. All municipalities are required to enforce the
UDC.
If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all necessary
approvals and recorded documents required to complete the project for which this permit is sought including requirements set forth
in Wisconsin statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the
property is located, and all other rules, regulations and requirements pertaining to that Condominium Association.
You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams.
Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or
modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural
Resources wetlands identification web page, dnr.wi.aov/topic/wetlands, or contact a Department of Natural Resources service
center (715)685-2900.
1 (we) declare that this application, including any accompanying information, has been examined by me (us) and to the best of my
(our) knowledge and belief it is true, correct, and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and
accuracy of all information that I (we) are providing and that will be relied upon by Bayfield County in determining whether to
issue a permit. I (we) further accept liability which may be a result of Bayfield County relying on this information I (we) are
providing in or with this application. I (we) consent to county officials charged with administering county ordinances to have
access to the above -described property at any reasonable time for the purpose of inspection.
Owner(s) or Authorized Agent Printed Name: i A ,-
TH
Owner(s) or Authorized Agent Signature: --- - - -------- Date: —
NOTES:
1. If you are signing on behalf of the owner(s) a letter of authorization must accompany this application.
2. Specific conditions/instructions may be stated on the face of the issued Land Use Permits. Owners, agents, & contractors
must all be aware of permit details & conditions and permit card must be posted on property prior to start of project.
=4
RECEIV
MAY 0 5 2026
Bayfield Co.
Planning and Zoning Agency
i
I
F.
.0
1
l
RECEIVED
MAY 052025
8ayfield Co.
Pknnfig and Zoning Agency
RECEIVED
MAY 052075
Bayfield Co.
plffiming and Zoning Agency
I-d4kI�IIIII� IIIIIiI IiIIIIIIIiiii 4.
Cu,
m
m?
-<
rn
o
rn
Jp n
C n
p
O
rn
01O
2
T
�
Q
� A
C
at
x
at
at
ovGle Zx8
L LXu I Imo(SJy
i6.• ,.c.
RECEIVED
MAY 0 5 2025
Bayfield Co.
pinning and Zoning Agency
5/13/25, 8:33 AM
Real Estate Bayfield County Property Listing
Today's Date: 5/13/2025
Novus-Wisconsin Access rev. 12.0206
Property Status: Current
Created On: 3/15/2006 1:16:01 PM
Description
Updated: 1/6/2025
Tax ID:
29152
PIN:
04-046-2-51-04-18-3 03-000-10000
Legacy PIN:
046102506000
Map ID:
Municipality:
(046) TOWN OF RUSSELL
STR:
S18 T51N R04W
Description:
SW SW LESS PAR FOR HWY IN V.471
R355 IN V.941 P.486 211 IN DOC 2023R-
599262
Recorded Acres:
39.500
Calculated Acres:
37.274
Lottery Claims:
0
First Dollar:
Yes
Zoning:
(AG -1) Agricultural -1
ESN:
128
'S Tax Districts Updated: 3/15/2006
1
STATE
04
COUNTY
046
TOWN OF RUSSELL
040315
SCHL-BAYFIELD
001700
TECHNICAL COLLEGE
18 Ownership
Updated: 1/6/2025
ELLEN RUSSO
STEVEN JONES
BAYFIELD WI
BAYFIELD WI
Billing Address:
ELLEN RUSSO
PO BOX 169
BAYFIELD WI 54814
Mailing Address:
ELLEN RUSSO
PO BOX 169
BAYFIELD WI 54814
10 Site Address * indicates Private Road
31100 STATE HWY 13
BAYFIELD 54814
Property Assessment
Updated: 3/24/2025
2025 Assessment Detail
Code
Acres
Land
Imp.
G1 -RESIDENTIAL
1.000
2,300
2,800
G6 -PRODUCTIVE FOREST
38.500
86,600
0
2 -Year Comparison
2024
2025
Change
Land:
88,900
88,900
0.0%
Improved:
0
2,800
100.0%
Total:
88,900
91,700
3.1%
Recorded Documents Updated: 5/8/2006 ElI
® LAND CONTRACT Property History
Date Recorded: 6/5/2023 2023R-599262 N/A
0 WARRANTY DEED
Date Recorded: 4/5/2006 2006R-505974 941-486
https://novus.bayfieldcounty.wi.gov/access/master.asp?paprpid=29152 1/1
Bayfield County, WI
5/13/2025, 8:34:06 AM 1:1,772
-'' Wetlands
Rivers
Approximate Parcel Boundary Town
Road Type
State
Building
0 0.02 0.04 0.08 mi
0 0.04 0.07 0.14 Ion
Bayfeb cony Land Records Depanmenl
Baymsd County Zonlnp Applmibn
bllps:llnlapa.bsyrolcaunywl.pov!ZonlnpWAel
Land Use Permit Application Review Checklist
Submission #:
What zoning district is the project located in?
❑R-1 O R-2 ❑R-3 ❑R-4 ❑R-RB O 0 O IAA -1 ❑A-2 ❑F-1 El F-2 O ❑M -M
❑ Yes o
Is lot substandard (does not meet current zoning dimensional requirements)?
Deed of record:
❑ Yes No
Is the project located in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR
landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)?
❑ Yes ci-r
Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of
navigable waterway)
❑ Yes No
Is the project located in the Floodplain?
Zone:
Yes
Are there wetlands on the property?
❑ Yes ®' to
as project associated with a nonconforming use or structure?
❑ YesfjW4o
Is project associated with a variance?
Case #:
❑ Yes IJ,Pdo
Is project associated with a Special B or Conditional Use Permit?
Permit #:
❑ Yes c -r j
Is the project associated with a Special A Use Permit?
❑ Yes 1Io
Does the project require sanitary?
❑ Existing O New ❑ Intercept ❑ Reconnect ❑ Non -Plumbing O Public
Sanitary Permit #:
❑ Yes.&iicIo
Does the project require mitigation?
Implementation Deadline: Date of Compliance:
❑ Yes to10
Does the project require an affidavit?
Affidavit #:
❑ Yes O"'No
Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback?
❑ Yes tiiio
Did applicant/property owner mark lot line(s), if project is within 30 feet of required setback?
Project use is?-esidential O Commercial O Municipal
Project type is? ew Construction O Addition/Alteration O Change Use O Relocate ❑ RV Placement O Sign
❑ Establishing a Business ❑ Temporary O Shoreland Grading O Other, describe:
Structure Type is: 0 Residence O Principal Structure Accessory Structure O Boathouse (one story only)
❑ Open-sided/Screened Structure (gazebo, etc.) O Stairway to navigable waters ❑ Mobile Home
❑ Shipping Container O Other, describe
Total Sq. Ft. of Project: Number of Stories: Overall Height: `
Calculated Fee Category:
El Residential Principal Structures - $0.75/square foot (minimum $125)
abitable Residential Accessory Structures - $0.50/square foot (minimum $75)
n -Habitable Residential Principal and Accessory Structures - $0.20/square foot (minimum $75)
❑ Commercial/Municipal Principal Structures - $0.75/square foot (minimum $125)
El Commercial/Municipal Accessory Structures - $0.20/square foot (minimum $75)
Calculated Fee Amount:
Additional Fees: O Return Inspection ❑ Land Use Revisions ❑ Special Use Permit - Class A ❑ After -the -Fact (ATF)
❑ Floodplain O Shoreland - Impervious Surface O Shoreland - Non -Conforming, etc. ❑ Tower Siting/Collocation 1
❑ Tower Collocation 2 O Metallic Mine
ATF Fee Amount:
Inspected by:
c'n\1�,lC
Date of Inspection:
2t,�
Re -Inspected by:
Date of Re -Inspection:
Denied by:
Date of Denial:
Reason for Denial:
Date Denial Letter Mailed:
Approved by: Aa ( I • Date of Approval:O(, I J 0
rn
C=ust
n(s):
meet and maintain setbacks from furthest extension of structure including eaves and
overhangs.
❑ For personal storage only.
D For personal residence only.
ii�Oot for human habitation or sleeping purposes.
1wn/State/DNR/Federal may require permitting
❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction.
O A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction (if applicable).
❑ Use best management practices to limit and prevent erosion during construction.
❑ This permit cannot be transferred if property is sold.
❑ A Bayfield County Health Dept permit is required.
0 Check with Town regarding room tax.
❑ Short -Term Rental is for a maximum occupancy of persons.
❑ Sign must meet the requirements of Article E of the Bayfield County Zoning Ordinance.
Qe constructed per plan.
❑ Adhere to privy agreement.
❑ Temporary permit allowing existing structure for a period of less than 1 year.
❑ RV may not be used for permanent residence or storage.
❑ RV allowed for
❑ RV must be removed by
sewer and pressurized water allowed in the structure.
❑ No plumbing or plumbing fixtures allowed.
❑ No additional sleeping areas allowed without obtaining necessary sanitary permit(s).
❑ Land use permits shall be required for any new residence, any building or structure erected,
relocated, rebuilt, or structurally altered
❑ Land use permits shall be obtained prior to the initiation of construction or a change in land use
❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are
required
❑ Sanitation requirements must be met (if applicable)
O Additional conditions may be placed and need to be adhered to at the time of permit issuance
Other Conditions:
B-'-YFIELD Bayfield County
Planning & Zoning Department
117 E 5th Street
P.O. Box 58
Washburn, WI 54891
Phone: 715-373-6138
Fax: 715-373-0114
Property Owner:
Submission Number:
JONES, STEVEN
LU-01649
PO BOX 169
BAYFIELD, WI 54814
Transaction Number:
RUSSO, ELLEN
LU-01649-2B080
PO BOX 169
BAYFIELD, WI 54814
Description Amount
Verified Fee Amount $0.00
Commercial/Municipal and Accessory Structures -
$0.20/square foot (minimum $75)
$115.20
Total: $115.20
Payment Amount: $115.20
Reference: 110
Paid by: ELLEN RUSSO & STEVE JONES
Payment Type: Check
Transaction Date: undefined
Receipt of payment does not guarantee eligibility of
permit and is not proof of issuance of a permit.
Town, City, Village, State or Federal
Permits May Also Be Required
Substandard — No / Nonconforming — No
Shoreland - No / Impervious Surface - No
Floodplain - No / Wetlands - Yes
Mitigation - No / Affidavit #:
LAND USE - X
SANITARY -
SPECIAL A -
SPECIAL B/CONDITIONAL —
BOA —
No. 25-0261 Tax ID: 29152
Issued To: JONES, STEVEN RUSSO, ELLEN
Location: S18 - T51 N - R04W
Town of Russell
BAYFIELD COUNTY
J1 'li'iIkI
WEATHERIZE AND POST THIS PERMIT
ON THE PREMISES DURING CONSTRUCTION
Legal Description: SW SW LESS PAR FOR HWY IN V.471 P.355 IN V.941 P.486 211 IN DOC 2023R-599262
Residential Structure in A-1 zoning district
For: New Construction [1 - Story], Accessory Structure on a Crawlspace [576 Total sq. ft.] Height of 16.5'
(Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any
future expansions or development would require additional permitting.
Condition(s): See back of card
NOTE: This permit expires two years from date of issuance if the authorized construction
work or land use has not begun.
Changes in plans or specifications shall not be made without obtaining approval.
This permit may be void or revoked if any of the application information is found
to have been misrepresented, erroneous, or incomplete.
This permit may be void or revoked if any performance conditions are not
completed or if any prohibitory conditions are violated.
Emily Macgillivray
Authorized Issuing Official
May 14, 2025
Date
Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs.
Not for human habitation or sleeping purposes.
Town/State/DNR/Federal may require permitting
To be constructed per plan.
No sewer and pressurized water allowed in the structure.