Loading...
HomeMy WebLinkAbout25-0301Return to: Ijb O �(� 51\� 117E 5's Stre O o l t'>Bay5 County Planning and Zonin De artment aunty Use Oniy: Washburn, WI 89 g P Submission L� ' 0h bl AND USE PEPMPI' 1 d 2025 APPLICATION ermitsdba co fi Permit#: .wi. v Date: Property Owner Name: �7 Author¢ed A N me(if applicable): S/ !l�- BY S Telephone Number. 9c. _ d�/ _ XJ /S Tel p ne�T er: th E -Mail Address: �j 6; J f h�Co E- i M Ad s: JI•L0� Maim Addres : J wf9 �iab"i l,J�%Woe Ca rou E,s MailAd City, State Zip: Cr Sta Zi h ,Qtr [✓� Sy8y7 p� gy Contractor: Telephone Number:j0p/�-��� E -Mail Address: lir/r• t.Git S7rliCi7Qt-. �" SECTION B: Pro ormatiom e -,;,s- Project Address (if different from mailing address): t 9ris Wt Idt, of Legal Description (if additional space is needed attach a separate sheet V U suTib QIN SENWAW Section, Township, Range: S / to fl -?A/ I Q5 t,J Town of: Th. d't e, Tax 11) #: /'73'7/ Lot Size (Acres/SquareFeet): /,74b -es ION C. Project infordiatron "e alt tha a"7 Project Use is: Residential ❑ Commercial O Municipal Project Type is: ❑ New Construction %Addition/A1teration (existing structure) ❑ Change Use (existing structure) O Relocate (existing structure) O RV Placement 21+ days ❑ Sign O Establishing a Business O Temporary (12 or less months) ❑ Shoreland Grading, Class A O RV Placement 4+ months, Class A O Other (describe): required (Total sq It): required ND:Structure Information (Does not apply to RVs and Signs go to Section B Structure Type is: O Residence O Principal Structure (describe): I0 Accessory Structure (describe): O Shoreland Exempt Structure (describe): O Mobile Home (provide manufactured SC ruc.P,� ft, fore t date): ❑ Shipping Container O Other (describe): Foundation Type: saa a a 74 ❑ Basement 0 Walkout Basement ❑ Slab O Crawlspace O Ground O Skids X Other (explain):1, F wt Existing Structure: Length: Width: L'? Height: p4j Proposed Structure (Provide Sq Ft based on outside dimensions, including unfinished areas, attached garages/above grade decks/porches): 3!0 •t{t Basement Sq Ft: o " Floor Sq Ft0g Loft Sq Ft O 2n° Floor Sq Ft: 0 3"' Floor Sq Ft: Garage Sq Ft: O Porch Sq Ft: 3 5 Deck Sq Ft: a Other Sq Ft (describe): Other Sq Ft (describe): Total Sq Ft: 3 /O, 5 Overall Height (finished grade to peak): tilt - ft of Stories: J. Existing II of Bedrooms on property: Proposed # of Bedrooms in project: Q SECTION E: RV and Sign Information check all that apply) Sign is: ❑ New O Replacement RV is: ❑ New ❑ Replacement ❑ On -premise ❑ Off -premise 0 2 -sided Year: Vin#: ❑ 1 -sided ❑ On -building 0 Multi -Tenant Width: Height: Make: Model: Length: A5 LU - OVo7 ENTERED X12 l MAY 192025 Permit Application SECTION F: Site Plan — attach a site plan or draw site plan in box below (See Pages' d (Ise Information for information that is aired to be rovided on site last ST) ❑ Dram Field (OF) Show location of: Existing Structures 4 Well (� ❑ tlartSeptic Tank (❑Slo es over 20% ❑ Driveways J Frontage Roads (I e L acme) �, Holdin Tank P ❑ Fri Ike ❑ River ❑Stream/Crcck ❑pond ❑Floc lain ❑ Wc N 1j; (JooJ /aryl/GrOW /j r� L f 4G E{ q O fblftr s few t ,yud(loro% Jro pIYf , /- /O/VLc�('N'/' I1_IL'Y /4dD.y Q / Ot'�i ' n+G • SFfJK y� L U ..r/ /VW /e✓V±a� T 90 /-0 Setback or distance from furthest extent of structure including eaves and overhangs to (include on site Plan): 2 M 00 ft. ft. only Use Only 1 - ft. _ 9QXO S4mOvl, ft. ` morn $or 4 p ua4 Oltethur>d h/ 2 15) CS IV D MAY 142025 SECTIONG:Additional QuestionsE Yes ❑ No Has the location of die proposed project including eaves and over and well been staked? If no what date will this be completed: ❑ Yes No Did a licensed surveyor mark lot line(s) If project is within 10 feet of required setback? See page 2 of Land Use Application Information for required setbacks. Yes ❑ No Did property owner or applicant mark lot line(s) if project is within 30 feet of required setback? See page 2 of Land Use Application Information for required setbacks. Yes 0 No Is there an existin sanitary system on the property? If yes, what kind? ❑ Dtainfield Holding Tank ❑ Municipal/Public ❑ Other (describe): ❑ Yes No Will ptcs water be installed in the structure? If yes, what kind of sanitary system will be installed or used to manage wastewater? ❑ Drainfield ❑ Holding Tank ❑ Munici al/Public ❑ Other (describe): ❑ Yes No Will sleeping occur in the structure? If yes, contact local Uniform Dwelling Code (UDC) for approval and inspection requirements. Is the project associated with any of the following: 4/0 ❑ Rezone ❑ Class A Special Use 0 C s B Special Use 0 Conditional Use ❑ Variance payment will be made via: heck (attached) ❑ Cash (attic ) debi dit/echeck (department to call once pryment is ready to be taken) How would you like to receive your e Mail to: OR 16d.Email to: QC t1 $n fop^ 0 Property Owner Address 0 Agent Address �LContrctor Address 0 Other (provide Name and Email or Address): :-RMBnn A. eni.......,t.,a.....s......_a cr_: ,• _. c� IL. 4__ /7' D gin N — o O t (0 N H r _ l sal g� L o — - - a a tL Ui &li )ilflr)i'lJi n 3 vG� 0 o - co N N o CD o ECEod� Lu"o/b71 QED MAY 152025 D Letter of Authorization Sayfield Co. Zoning Dept Bayfield County Planning & Zoning Department PURPOSE. This Letter of Authorization is used to authorize a single property owner to act on behalf of multiple property owners or a designated agent to act on behalf of the property owner/s. If multiple property owners, each property owner must submit this signed letter. 1, Steve Biggers & Carol Berg (property owner), authorize Ben Lichtenberg (authorized agent) to submit a Land use (Example: land use, special use, conditional use, rezone/map amendment, appeal, variance, text amendment, etc.) for the following described project (Example: construction of residence or other structure, short-term rental or other use change, etc.) construction of screened porch application on my behalf for the following described property: Legal description of subject property: PAR IN SE NW & NE SW IN V.1149 P.837 Address of subject property: 9285 Wildwood Campground Rd.. Iron River, WI 54847 carve B&r sty 8igge-rk Signature May 15, 2025 Dated Bayfield County, WI 5/20/2025, 9:42:40 AM 1:661 Rivers F— Building Footprint 2015 —_ Approximate Parcel Boundary � Building Road Type — Town 0 0.01 0.01 0.03 ml 0 0.01 0.03 0.05 km Bayfield Cdr Ler, Rer rde DepaMreat 6ayfSCeangZnnbgAppfmtbn aepa/Imap bayWdcdmlywi rvQdtiagWAer 5/20/25, 9:43 AM Novus-Wisconsin Access rev. 12.0206 Real Estate Bayfield County Property Listing Today's Date: 5/20/2025 Description Updated: 10/15/2015 Tax ID: 19371 PIN: 04-024-2-47-08-16-2 04-000-02000 Legacy PIN: 024103705000 Map ID: Municipality: (024) TOWN OF IRON RIVER STR: S16 T47N R08W Description: PAR IN SE NW & NE SW IN V.1149 P.837 371A5 Recorded Acres: 1.300 Calculated Acres: 3.416 Lottery Claims; 0 First Dollar: Yes Zoning: (R-1) Residential -1 ESN: 118 Tax Districts Updated: 3/15/2006 1 STATE 04 COUNTY 024 TOWN OF IRON RIVER 163297 SCHL-MAPLE 001700 TECHNICAL COLLEGE 4° Recorded Documents ® WARRANTY DEED Date Recorded: 10/1/2015 ® CONVERSION Date Recorded: 3/15/2006 2015R-560638 1149-836 480932 269-25;624-336;851- 835 12 Ownership STEVEN S BIGGERS CAROL A BERG Billing Address: BIGGERS, STEVEN S & BERG, CAROL A 5970 CATHCART DR EXCELSIOR MN 55331 Property Status: Current Created On: 3/15/2006 1:15:33 PM Updated: 10/15/2015 EXCELSIOR MN EXCELSIOR MN Mailing Address: BIGGERS, STEVEN S & BERG, CAROL A 5970 CATHCART DR EXCELSIOR MN 55331 10 Site Address * indicates Private Road 9285 WILDWOOD CAMPGROUND RD IRON RIVER 54847 ® Property Assessment Updated: 8/19/2024 2025 Assessment Detail Code Acres Land Imp. Cl-RESIDENTIAL 1.300 98,500 153,700 2 -Year Comparison 2024 2025 Change Land: 98,500 98,500 0.0% Improved: 153,700 153,700 0.0% Total: 252,200 252,200 0.0% �r r Property History N/A .._ https://novus.bayriieldcounty.wi.gov/access/master.asp?paprpid=19371 1/1 -0167) MAY 192025 • Bayfield County Impervious Surface Calculations Bayfield Co. Zoning Dept These calculations are REQUIRED per WI Admin Code NR 115.05(1)(e) and Section 13-1-32(g) and 13-1- 40(h) of the Bayfield County Code of Ordinances. The undersigned hereby makes application for construction, reconstruction, expansion, replacement or relocation of any impervious surface within 300 feet of the ordinary high water mark and agrees that all activities shall be in accordance with the requirements of the Bayfield County Code of Ordinances and all other applicable ordinances and the laws of the State of Wisconsin. Pursuant to Chapter 1, Title 13, Section 13-1-106(d) of the Bayfield County Zoning Ordinance(s), Planning and Zoning Department employees assigned to inspect properties shall have access to said properties to make incnaMinnc Lq S Impervious Surface: An area that releases as runoff all or a majority of the precipitation that falls on it. "Impervious surface" excludes frozen soil but includes rooftops, sidewalks, driveways, parking lots and streets unless specifically designed, constructed and maintained to be pervious. Calculation of Impervious Surface: Percentage of impervious surface shall be calculated by dividing the surface area of existing and proposed impervious surfaces on the portion of a lot or parcel that is within 300 feet of the ordinary high water mark by the total surface area of the lot or parcel, multiplied by 100. Impervious Surface Standard: Allow up to 15% impervious surface but not more than 30% impervious surface on the portion of a lot or parcel that is within 300 feet of the ordinary high water mark. A permit can be • issued for development that exceeds 15% impervious surface but not more than 30% impervious surfaces with a mitigation plan that meets the requirements of the Bayfield County Ordinance(s). • Existing Impervious Surfaces: For existing impervious surfaces that were lawfully placed when constructed but that do not comply with the standards in Section(s) 13-1-32(g) and Section 13-1-40(h), the property owner may do any of the following: I a. Maintenance and repair of all impervious surfaces: b. Replacement of existing impervious surfaces with similar surfaces within the existing building footprint; c. Relocation or modification of existing impervious surfaces with similar or different impervious surfaces, provided that the relocation or modification does not result in an increase in the percentage that existed on the effective date of the county shoreland ordinance, and meets the applicable setback requirements in Section 13-1-32. Outlook Re: Land Use Permit Application - incomplete From Steve Biggers <biggers.steve@gmail.com> Date Fri 5/23/2025 10:31 AM To Emily Macgillivray <emily.macgillivray@bayfieldcounty.wi.gov> Hi Emily, In reviewing the area considered to be our driveway, please use 25' x 35' as an appropriate area. Thank you! Steve Biggers, CSM Learning & Development Consultant Mobile: 952-221-2215 Linkedln Profile On Fri, May 23, 2025 at 9:32 AM Emily Macgillivray <emily.macgillivra .@bayfieldcountv.wi.gov> wrote: Hi Steve, I received your voicemail. I am reviewing the impervious surface form, and notice it says "no real driveway." There was a clear parking area when I visited the site. While this area isn't paved or gravel, areas with compacted soils (where parking regularly occurs) count as impervious surface. That parking area (approximately marked in the attached PDF) should be added to the impervious surface form. Can you either send me an updated form or let me know how large that parking area is and I can add it to the form you submitted and adjust the totals? Kind regards, Emily Macgillivray (she/her) Assistant Zoning Administrator Planning and Zoning Department Bayfield County 117 E 5u' Street, PO Box 58 Washburn, WI 54891 Phone: 715-373-3511 emily.macgi llivray-@bayfieldcounty.wi.gov From: Steve Biggers <biggers.steveagmail.com> Sent: Wednesday, May 21, 2025 3:50 PM To: Emily Macgillivray <emily.macgillivray�a bayfieldcounty.wi.gov> Cc: gcroof gmail.com <gcroof _gmail.com> Subject: Re: Land Use Permit Application - incomplete Hi Emily. Thanks for following up. My understanding is that Ben provided this document and setback, and had a conversation with Trent yesterday. On Wed, May 21, 2025, 3:36 PM Emily Macgillivray <errmilymacgillivrav o)bayfieldcountv.wi.gov> wrote: I'm the inspector assigned to your Land Use application. I just wanted to check in and see if you have impervious surface form and setback information? If you have any questions, please let me know! Kind regards, Emily Macgillivray (she/her) Assistant Zoning Administrator Planning and Zoning Department Bayfield County 117 E 5th Street, PO Box 58 Washburn, W1 54891 Phone: 715-373-3511 emily.maegillivray-@bayfieldcounty.wi.gov From: Trent Wiesner<trent.wiesnerCa�bayfieldcountywi.gov> Sent: Thursday, May 15, 2025 8:45 AM To: jggers.steve@gmail.com <biggers.steveCa?gmail.com>;gcroof _gmail.com <gcroof _gmail.com> Cc: Emily Macgillivray<gmily.macgillivrayl�bayfieldcounty.wi.ggv> Subject: Land Use Permit Application - incomplete Good morning, Thank you for your land use permit application submission. Unfortunately, it is incomplete. In order to move forward, we will need the following: • The authorized agent information boxes to be completed for Benjamin Lichtenberg • A letter of authorization signed by Steven Biggers and Carol Berg • All setbacks • An impervious surfaces form since the footprint of the structure is changing I have attached the aforementioned forms to this email. Please complete them and revise the application, a copy of which I have also attached to this email, and return them via mail or email. Regards, Trent Wiesner I Clerk I Planning and Zoning Department 117 E 5th Street, PO Box 58 Phone: 715-373-3515 B ° YFIELD Land Use Permit Application Review Checklist Submission #: it zoning district is the project located in? Wh 0 R-2 ❑ R-3 ❑ R-4 ❑ R-RB ❑ C ❑ I ❑ M ❑ A-1 ❑ A-2 ❑ F-1 ❑ F-2 ❑ W ❑ M -M ❑ Yes No Is lot substandard (does not meet current zoning dimensional requirements)? Deed of record: es ❑ No Is the project located- in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)? es ❑ No Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of navigable waterway) ❑ Yes No Is the project located in the Floodplain? Zone: ❑ Yes N Are there wetlands on the property? ❑ Yes No Is project associated with a nonconforming use or structure? ❑ Yes No Is project associated with a variance? / Case #: ❑ Yes o Is project associated with a Special B or Conditional Use Permit? / Permit #: ❑ Yes fDl Is the project associated with a Special A Use Permit? ❑ Yes No Does the project require sanitary? O Existing ❑ New ❑ Intercept O Reconnect ❑ Non -Plumbing O Public Sanitary Permit #: ❑ Yes L.4Io Does the project require mitigation? Implementation Deadline: Date of Compliance: ❑ Yes o Does the project require an affidavit? Affidavit #: s ❑ No Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback? Yes ❑ No Di pplicant/property owner mark lot line(s), if project is within 30 feet of required setback? Project use is? Residential ❑ Commerc' l O Municipal Project type is? O New Construction Addition/Alteration ❑ Change Use ❑ Relocate ❑ RV Placement ❑ Sign ❑ Establishing a Busin ss O Temporary ❑ Shoreland Grading O Other, describe: Structure Type is: esidence 0 Principal Structure 0 Accessory Structure ❑ Boathouse (one story only) ❑ Open-sided/Screened Structure (gazebo, etc.) ❑ Stairway to navigable waters ❑ Mobile Home ❑ Shipping Container ❑ Other, describe Total Sq. Ft. of Project: 3fr,.� Number of Stories: Overall Height: Cal,pulated Fee Category: CResidential Principal Structures - $0.75/square foot (minimum $125) ❑ Habitable Residential Accessory Structures - $0.50/square foot (minimum $75) ❑ Non -Habitable Residential Principal and Accessory Structures - $0.20/square foot (minimum $75) ❑ Commercial/Municipal Principal Structures - $0.75/square foot (minimum $125) ❑ Commercial/Municipal Accessory Structures - $0.20/square foot (minimum $75) Calculated Fee Amount: Additional Fees: ❑ Return Inspection ❑ Land Use Revisions ❑ Special Use Permit - Class A ❑ After -the -Fact (ATF) ❑ Floodplainoreland - Impervious Surface ❑ Shoreland - Non -Conforming, etc. ❑ Tower Siting/Collocation 1 ❑ Tower Collocation 2 ❑ Metallic Mine ATF Fee Amount: Inspected by: Date of Inspection: Re -Inspected by: J Date of Re -Inspection: Denied by: f ' Date of Denial: Reason for Denial: Date Denial Letter Mailed: Approved by: f Date of Approval: 1iI(tt1 rYl( Cond' ' n(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs. ❑ For personal storage only. ❑ For personal residence only. ❑Zown/State/DNR/Federal Nt for human habitation or sleeping purposes. may require uire permitting ❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be obtaj.eJ prior to the start of construction. Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be �7se d prior to the start of construction (if applicable). best management practices to limit and prevent erosion during construction. ❑ This permit cannot be transferred if property is sold. ❑ A Bayfield County Health Dept permit is required. ❑ Check with Town regarding room tax. ❑ Short -Term Rental is for a maximum occupancy of persons. ❑ Sign must meet the requirements of Article E of the Bayfield County Zoning Ordinance. IYfo be constructed per plan. ❑ Adhere to privy agreement. ❑ Temporary permit allowing existing structure for a period of less than 1 year. ❑ RV may not be used for permanent residence or storage. ❑ RV allowed for ❑ RV must be removed by ❑ No sewer and pressurized water allowed in the structure. ❑ No plumbing or plumbing fixtures allowed. ❑ No additional sleeping areas allowed without obtaining necessary sanitary permit(s). ❑ Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered ❑ Land use permits shall be obtained prior to the initiation of construction or a change in land use ❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required ❑ Sanitation requirements must be met (if applicable) ❑ Additional conditions may be placed and need to be adhered to at the time of -permit issuance Other Conditions: L'FIELD Bayfield County Planning & Zoning Department 117 E 5th Street P.O. Box 58 Washburn, WI 54891 Phone: 715-373-6138 Fax: 715-373-0114 Property Owner: Submission Number: BIGGERS, STEVEN S LU-01671 5970 CATHCART DR EXCELSIOR, MN 55331 Transaction Number: BERG, CAROL A LU-01671-2BEB0 5970 CATHCART DR EXCELSIOR, MN 55331 Description Amount Shoreland - Impervious Surface —$25c00 - Verified Fee Amount $0.00 Residential Principal Structures-$0.75/square foot $232.86 (minimum $125) Total: $G Payment Amount: $232.86 Reference: 4506 Paid by: STEVEN S BIGGERS AND CAROL A BERG, 5970 CATHCART DR, SHOREWOOD, MN 55331 Payment Type: Check Transaction Date: 5/23/2025 Receipt of payment does not guarantee eligibility of permit and is not proof of issuance of a permit. Town, City, Village, State or Federal Permits May Also Be Required Substandard - No / Nonconforming - No Shoreland — Yes / Impervious Surface - Yes Floodplain - No / Wetlands - No Mitigation - No / Affidavit #: LAND USE -X SANITARY - SPECIAL A - SPECIAL B/CONDITIONAL — BOA — No. 25-0301 Tax ID: 19371 Issued To: BIGGERS, STEVEN S BERG, CAROL A BAYFIELD COUNTY Location: S16 - T47N - R08W Town of Iron River Legal Description: PAR IN SE NW & NE SW IN V.1149 P.837 371A5 PERMIT WEATHERIZE AND POST THIS PERMIT ON THE PREMISES DURING CONSTRUCTION Residential Structure in R-1 zoning district For: Addition/Alteration [1 - Story], Residence on Sauna Tube Concrete Footing [310.5 Total sq. ft.] Height of 17' (Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any future expansions or development would require additional nermittina. Condition(s): See back of card NOTE: This permit expires two years from date of issuance if the authorized construction work or land use has not begun. Changes in plans or specifications shall not be made without obtaining approval. This permit may be void or revoked if any of the application information is found to have been misrepresented, erroneous, or incomplete. This permit may be void or revoked if any performance conditions are not completed or if any prohibitory conditions are violated. Emily Macgillivray Authorized Issuing Official May 23, 2025 Date Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs. Town/State/DNR/Federal may require permitting A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be obtained prior to the start of construction (if applicable). Use best management practices to limit and prevent erosion during construction. To be constructed per plan.