HomeMy WebLinkAbout25-0671Town, City, Village, State or Federal
Permits May Also Be Required
Substandard – No / Nonconforming – No
Shoreland – No / Impervious Surface – No
Floodplain – No / Wetlands – No
Mitigation – No / Affidavit #:
LAND USE – X
SANITARY –
SPECIAL A – (Town of Cable – undefined)
SPECIAL B/CONDITIONAL –
BOA –
No. 25-0671 Tax ID: 9918
Issued To: CARLSON, STEVEN P & ANNA M
Location: S35 - T43N - R08W
Town of Cable
Legal Description: N 1/2 W 330' NE NE IN V.1162 P.107 1100
Residential Structure in R-2 zoning district
For: New Construction [1 - Story ], Accessory Structure on a Slab [2400 Total sq. ft. ] Height of 19’
(Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any
future expansions or development would require additional permitting.
Condition(s): See back of card
NOTE: This permit expires two years from date of issuance if the authorized construction Scott Roush
work or land use has not begun.
Authorized Issuing Official
Changes in plans or specifications shall not be made without obtaining approval.
This permit may be void or revoked if any of the application information is found
to have been misrepresented, erroneous, or incomplete. September 05, 2025
This permit may be void or revoked if any performance conditions are not Date
completed or if any prohibitory conditions are violated.
BAYFIELD COUNTY
PERMIT
WEATHERIZE AND POST THIS PERMIT
ON THE PREMISES DURING CONSTRUCTION
Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs.
For personal storage only.
Not for human habitation or sleeping purposes.
Use best management practices to limit and prevent erosion during construction.
To be constructed per plan.
No additional sleeping areas allowed without obtaining necessary sanitary permit(s).
Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt,
or structurally altered
Land use permits shall be obtained prior to the initiation of construction or a change in land use
The plumbing cannot be connected to the well until the sanitary permit is issued.