HomeMy WebLinkAbout26-0066getum to: County Use Only:
117 E 5th Street, PO Box 58 Bayfield County Planning and Zoning Department Submission #: LU' O41O$
Washburn, WI 54891 LAND USE PERMIT APPLICATION Permit it: N6 - oobb
permits@bayfieldcounty.wi.gov Date: 3/ d'6 eo�-
SECTION A: General Information
Property Owner Name:
Authorized Agent Name (if applicable):
John and iJisa Eyerly
Telephone Number:
Telephone Number. nc CL WED 1
715-209-7001 715-209-1037
E -Mail Address:
E -Mail Address: JAN 28 2026
jleyerly@gmailcom
Mailing Address:
Mailing Address: Bayfield Co.
.
PO Box 327
plannin g and Zoning A9 ency
City, State, Zip:
City, State, Zip:
Cornucopia WI 54827
Contractor:
Telephone Number:
E -Mail Address:
Hunter Holeman
715-209-2063
SECTION B: Property Information
Project Address (if different from mailing address):
'Q'°' j S SsK44 Shofn OR.
Legal Description (if additional space is needed attach a separate sheet):
Lot 1 CSM #840 IN VS P329 (betted in Govt Lot 1) IN V. 967 P. 910 260
Section, Township, Range: Sec 20 TN50 RO6
Town of: Bell
Tax ID #: 7442
Lot Size (Acres/Square Feet): 1 aaa
SECTION C: Project Information (check all that apply)
Project Use is: O Residential O Commercial ❑ Municipal If Commercial, estimated cost of construction: $
Project Type is: El New Construction O Addition/Alteration (existing structure) -
❑ Change Use (existing structure) ❑ Relocate (existing structure) O RV Placement 21+ days
❑ Sign ❑ Establishing a Business O Temporary (12 or less months)
❑ Shoreland Grading, Class A O RV Placement 4+ months, Class A []Other (describe):
required (Total sq ft): required
SECTION D: Structure Information (Does not apply to RVs and Signs, go to Section B)
Structure Type is: O Residence O Principal Structure (describe):
home with walk out basement
❑ Accessory Structure (describe): ❑ Shoreland Exempt Structure (describe): El Mobile Home (provide manufactured
date):
❑ Shipping Container ❑ Other (describe):
Foundation Type:
O Basement JQ Walkout Basement O Slab 0 Crawlspace O Ground ❑ Skids ❑ Other (explain):
Existing Structure:25x30=750(ne)+21x14-294th) O Length: Width: Height:
Proposed Structure (Provide Sq Ft based on outside dimensions, including unfinished areas, attached garages/above grade
decks/porches):
Basement Sq Ft: 1" Floor Sq Ft:
Loft Sq Ft:
tad Floor Sq Ft:
3'v Floor Sq Ft:
1044 1044
7x12=84
Garage Sq Ft: Porch Sq Ft:
Deck Sq Ft:
Other Sq Ft (describe):
Other Sq Ft (describe):
24x34=864 10x25=274
24x12=288
Total Sq Ft: ua 104 %x1! I
OverallHeight (finished grade to peak): 11
# of Stories: I
I Existing # of Bedrooms on property: 6(
Proposed # of Bedrooms in project: O
SECTION E: RV and Sign Information (check all that apply)
Sign is:
RV is:
❑ New O Replacement
❑ New O Replacement
O On -premise ❑ Off -premise
O 1 -sided O 2 -sided
Year: Vin #:
O On -building O Multi -Tenant
Length: Width: Height:
Make: Model:
Application Page 1
SECTION F: Site Plan - attach a site plan or draw site plan in box below (See pages 1 & 2 of Land Use Permit Application
Information for information that is required to be provided on site plan)
Sh7w location of:
Driveways Ja Frontage Roads (include name) Q Existing Structures 2 Well (W) Septic Tank (ST) O Drain Field (DF)
I Holding Tank O Privy (P) 'Lake O River ❑Stream/Creek ❑Pond ❑Floodplain ❑Wetlands ❑Slopes over 20%
N SisKiult 5hxt T Drve
'•w'l II � - f 5�¢c� �0� Q
- ifv;c
QI pdh $t,c 13
'\4
Setback or distancefrom furthest extent of structure County Use Only
ineladin eaves and overhan to (includ o it I
g gs e n sm a pan). Verified setbacks
Road Centerline $ R Notes/Comments:
Front Lot Line/Right-of-Way ft R
Side Lot Line I R R �1 = —
NN
orth South West, circle one)
)`So
106i -
Side Lot ine 2
(North East South es circle one)
6-
ft
ft
Rear Lot Line
-6O
R
R
Septic/Holding Tank
✓s o
ft.
R
Drainfield
R
R
Privy
R
R
Well
R
R
Existing Structure/Building
R
R
Wetland
R
R
Elevation of Floodplain
R
ft.
Ordinary High -Water Mark (OHWM)
R
(
Other (describe)
R
R
C��V- �tLt.e Vtr
LAM i40tfu�AN L(8 2026
K r i e `OI Bayfiald Co.
Planning and Zoning Agency
Application Page 2
M
SECTION G: Additional Questions
❑ Yes
RNo
Has the location of the proposed project including eaves and overhangs and the sanitary system and well been
staked? If no, what date will this be completed: ..
❑ Yes
No
Did a licensed surveyor mark lot line(s) if project is within 10 feet of required setback? See page 2 of Land Use
Application Information for required setbacks.
,l,Yes
0 No
Did property owner or applicant mark lot line(s) if project is within 30 feet of required setback? See page 2 of
Land Use Application Information for required setbacks.
Yes
O No
Is there an existing sanitary system on the property? If yes, what kind?
O Drainfield J1olding Tank O Municipal/Public ❑ Other (describe):
I Yes
Rio
Will pressurized water be installed in the structure? If yes, what kind of sanitary system will be installed or used
/
to manage wastewater?
❑ Drainfield Holding Tank ❑ Municipal/Public ❑ Other (describe):
es
+ �No
Will sleeping occur in the structure? If yes, contact local Uniform Dwelling Code (UDC) for approval and
inspection requirements.
is the project associated with any of the following:
❑ Rezone O Class A Special Use O Class B Special Use O Conditional Use O Variance
Fee payment will be made via:
❑ Check (attached) 0 Cash (attached) Aebit/credit/echeck (department to call once payment is ready to be taken)
How would you like to receive your permit card?
Mail to: OR O Email to:
N ?roperty Owner Address O Agent Address ❑ Contractor Address O Other (provide name and email or address):
Section H: Acknowledgement and Signature
All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary permit
issuance, if required, needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a
permit will result in penalties.
The local Town, Village, City, State or Federal agencies may also require permits. The new construction of one- & two-family
dwellings requires review and approval by the local Uniform Dwelling Code (UDC) authority. Additions and 4 fd
and two-family dwellings may require review and approval by the UDC authority. All municipalities are required to enforce the
UDC. JAN 28 2026
If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all gg�
approvals and recorded documents required to complete the project for which this permit is sought includ&ipurernenl J6{h
in Wisconsin statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the
property is located, and all other rules, regulations and requirements pertaining to that Condominium Association.
You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams.
Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or
modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural
Resources wetlands identification web page, dnr.wi.gov/topic/wetlands. or contact a Department of Natural Resources service
center (715)685-2900.
I (we) declare that this application, including any accompanying information, has been examined by me (us) and to the best of my
(our) knowledge and belief it is true, correct, and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and
accuracy of all information that I (we) are providing and that will be relied upon by Bayfield County in determining whether to
issue a permit. I (we) further accept liability which may be a result of Bayfield County relying on this information I (we) are
providing in or with this application. I (we) consent to county officials charged with administering county ordinances to have
access to the above -described property at any reasonable for the purpose of inspection.
time
\X
Owner(s) or Authorized Agent Printed N \� 1
Owners) or Authorized Agent Signature.- _ C a1 e.5 0 Date:.
NOTES:
1. If you are signing on behalf of the owner(s) a letter of authorization must accompany this application.
2. Specific conditions/instructions may be stated on the face of the issued Land Use Permits. Owners, agents, & contractors
must all be aware of permit details & conditions and permit card must be posted on property prior to start of project.
Application Page 3
N rent ebt
DDAVANO No.
25-08.12,49
® _,
0
NORTH ELEVATION
nan
IExtreme
II •
omae O9
W W W,P.xlremeMNfureYPlan'.
°EWON ED;
Submltt
WRI
-�
h000
b �vnlft
,APPROVED:
WA
—
Ir
Memlr uisb
EAST ELEVATION
RECEIVED
JAN 282026
Bayfield Co.
Planning and Zoe^≤ nnzncY
2
I—
cci
Z
4
1/4e = T-0'
DATE
08-08-2025
Elevations
DMWING No.
25-08-124c
JAN 2 8 Zko'
Bayfield Co.
planning and Zoning Agency
Crawl Space
Foundation Plan
LI,
Floor Plan
Extreme
Menciirec
Mat
7t5 -U1-3019 n3ao9
W W W. Catrtme Mea f are5 Plan
C
O
E
0
2
1/4"=1'-O'
onrE:
08-08-2025
Foundation
Floor Plan
door Loading Specifcations for
Wood I -Joists and Components
Floor LL = 40psf
FLoor DL= 10psf
Deflection Criteria = L/480
E New Addition _ I [Existing Home
:MCEIVED
JAN 282026
Bayfield Co.
ing and Zoning Acer
2
8
Roof Loading Speclfcatlons for
Manufactured Roof Truss
Total Load = 57psf
-LL = 40 psf
-DL = 17 psf
- top cord = 7psf
- bottom cord =10 psf
Cross Section
Scale: T
liDRAWING M.
WRE
C
O
y
D
N
Y
C
w3
p
O
'=
` 1
CD()F
-
to
o
—o
N
w
1/2" = 1_0'
WE
08-08-2025
Cro88
Sections
Bayfield County
Impervious Surface Calculations JAN 26 'L0'Lo
These calculations are REQUIRED per WI Admin Code NR 115.05(1)(e) and Section 131 °a 1� -1-
40(h) of the Bayfield County Code of Ordinances. The undersigned hereby makes application or construction,
reconstruction, expansion, replacement or relocation of any impervious surface within 300 feet of the ordinary
high water mark and agrees that all activities shall be in accordance with the requirements of the Bayfield
County Code of Ordinances and all other applicable ordinances and the laws of the State of Wisconsin.
Pursuant to Chapter 1, Title 13, Section 13-1-106(d) of the Bayfield County Zoning Ordinance(s), Planning and
Zoning Department employees assigned to inspect properties shall have access to said properties to make
inspections.
Property Owner(s):
Oh>1 $ LUso- cyM\Y
Mailing Address:
Po SOX 3e7 Lotnvrof�r WS S J7
Property Address
C oAl�' S�sk1vV,t' )o1�s
P 2 C yr nuc. p t a u/$.
g'l�dl
Legal Description:
Section, Township, Range
1/4, 1/4,
o
Sec Township
N, Range W
Authorized Agent/Cohtractor
Gov't Lot
Lot #
CSM#
�NO
Vol & Page
vS i.329
Lot(s) #
Block(s) #
Subdivision
Town of: I
�P/LI
Parcel ID # (PIN #)
Opolol�000
S'.
Tax ID #
Date:
Impervious Surface: An area that releases as runoff all or a majority of the precipitation that falls on it.
"Impervious surface" excludes frozen soil but includes rooftops, sidewalks, driveways, parking lots and streets
unless specifically designed, constructed and maintained to be pervious.
Calculation of Impervious Surface: Percentage of impervious surface shall be calculated by dividing the
surface area of existing and proposed impervious surfaces on the portion of a lot or parcel that is within 300
feet of the ordinary high water mark by the total surface area of the lot or parcel, multiplied by 100.
Impervious Surface Standard: Allow up to 15% impervious surface but not more than 30% impervious
surface on the portion of a lot or parcel that is within 300 feet of the ordinary high water mark. A permit can be
issued for development that exceeds 15% impervious surface but not more than 30% impervious surfaces with
a mitigation plan that meets the requirements of the Bayfield County Ordinance(s).
Existing Impervious Surfaces: For existing impervious surfaces that were lawfully placed when constructed
but that do not comply with the standards in Section(s) 13-1-32(g) and Section 13-1-40(h), the property owner
may do any of the following:
a. Maintenance and repair of all impervious surfaces:
b. Replacement of existing impervious surfaces with similar surfaces within the existing building footprint;
c. Relocation or modification of existing impervious surfaces with similar or different impervious surfaces,
provided that the relocation or modification does not result in an increase in the percentage that existed
on the effective date of the county shoreland ordinance, and meets the applicable setback
requirements in Section 13-1-32.
Impervious Surface Item Dimension Area (Square Footage)
5y 2>0 ( t
Existing House
l( f M
b �
Existing Accessory
N X 3
$�
Building/Garage
Existing Sidewalk(s), Patio(s) &
lx 75 -to lal"Q/
33 3
Deck(s)
x)0 t tfr X(o
Existing Covered Porch(es),
Driveway & Other Structures .
10 x as
c2S 0
Proposed Addition/House
.I q x g
) J Z
Proposed Accessory
Building/Garage
J oaX 2(p
3 1z_
Proposed Sidewalk(s) & Patio(s)
L >1' 5C
q g
Proposed Covered Porch(es) &
Deck(s)
Proposed Driveway
YZttCCJVED
Proposed Other Structures
JAN 28 2UZ6
6ayfi`d Co.
Pla
Total:
o
a. Total square footage of lot: `' O )r(}
b. Total impervious surface area: 2 ¶S 3
c. Percentage of impervious surface area: 100 x (b)/a = La '7 %O
If the proposed impervious surface area is greater than 15% mitigation is required.
Total square footage of additional impervious surface allowed: @ 15% @ 30%
Issuance Information (County Use Only)
Date of Inspection:
Inspection Record:
Zoning District ( )
Lakes Classification ( J
Condition(s):
Stormwater
Management Plan Required:
Elves ❑ No
Signature of Inspector:
Date of Approval:
u/forms/impervioussurface
Created: May 2012 (®Apr 2016; Sept 2020) Proofed by:
RECEIVED
! \
As' JA l� 2026
NA
Applicant Checklist
Yes
❑ No
Will new electrical installation occur with project/structure? If yes, contact State for inspection requirements.
❑ Yes
jx. No
Will new plumbing installation occur with project/structure? If yes, contact State for inspection requirements.
❑ Yes
$.No
Is the project/structure to be used for commercial purposes? If yes, contact the State of Wisconsin Commercial
Buildings & Structures to determine if they require review and approval.
❑ Yes
No
Is the project located in the Floodplain? If yes, additional materials and fee will be required. Reference the
FEMA Map (httos://mse.fema.gov/oortal/bome) and Title 13, Chapter 2 of Bayfield County Zoning Ordinance
(littps://www.bayfieldcounty.wi.gov/7 11/Tide-I 3---Zonin -Code .
Yes
❑ No
Is the project located in the Shorelands, within 300 feet of a river/stream OR landward side of floodplain OR
1000 feet of a lake/pond/flowage (whichever is greater)? If yes, shoreland regulations will apply.
1`'Yes
❑ No
Is your property a waterfront lot and will any part of your project be located within 300 feet of the water OR is
your entire lot located within 300 feet of the water? If yes to either, complete and include Impervious Surface
Form (https://www.bayfieldcounty.wi.gov/DocumentCenter/View/3 I 59/lmervious-Surface-PDF .
❑ Yes
SNo
Are there wetlands on the property. If yes, wetland regulations will apply. A 25 -foot setback is required to any
mapped wetlands. Reference Department of Natural Resource Surface Data Viewer Map
(https://dnrmaps.wi.gov/H5/?Viewer=SWDV).
❑ Yes
No
If applicable, did you contact the road authority to see if a driveway permit or regulations apply to placement of
driveway?
❑ yes
flNo
Was the property purchased recently? If yes, include a recorded deed. A copy of recorded deed can be acquired
from the Bayfield County Register of Deed's office.
. Yes
❑ No
is a site plan included with all information requested on Page 1 of the Land Use Permit Application
Information? If no, a site plan with all applicable information on Page 1 is required for all submissions.
�(
.. "'SYes
❑ No
Is a floor plan(s) included with all information requested on Page 4 of the Land Use Permit Application
Information? Floor plans are required for residences, commercial buildings, or additions/alterations to these
structures.
N Yes
❑ No
If structure is in Shorelands, have building elevations with all information requested on Page 5 of the Land Use
Permit Application Information been included?
❑ Yes
KNo
Is this application to correct a violation or has the project already commenced? If yes, at minimum an after -the -
fact fee will apply. If not permittable, the structure will need to be removed.
].Yes
❑ No
If addition, does the existing structure meet required setbacks, see Page 2 of the Land Use Permit Application
Information? If no, be aware that it is the property owner's responsibility to show the structure was legally
placed and there may be limitations to expansion of the structure, see Bayfield County Section 13-1-44)
(https://www.bayfieldcounty.wi.gov/7I I,Titl -13--Zoning-Code).
❑ Yes
O No
Is the use of the project/structure allowed per Bayfield County Section 13-1-62
(https://www.bayfieldcounty.wi.gov/7 1I/Title-13—Zoning-Code). If no, be aware it is the property owner's
responsibility to show the use was legally established and there may be limitation to expansion of the use, see
Hayfield County Section 13-1-40 (bttps:/'www.bayfleldcountv.wi.gov/7lllritle-13--Zoning-Code).
Yes
❑ No
Have all fees been included with the completed application? See Fee Schedule on website
(httos://www.baytieldcounty.wi.pov/I389/Fee-Schedule). If no, all applicable fees need to be paid before permit
can be issued.
❑ Yes
No
Is property owned by multiple owners or is someone aside from the property owner applying? If yes, a Letter of
Authorization Form needs to be included. Form available on website
(https://www.bayfieldcountv.wi.gov/ 1340/A lications-Forms .
❑ Yes
Z No
Is property owned by a Trust or Business entity (LLC, Corp., etc.)? If yes to either, an Affidavit of Authority
needs to be included Forms available on website (hups://www.bayfieldcounty.wi.gov/l 340/Applications-
Forms).
_______
Yes
_______
O No
Is Land Use Application completed and signed?
Land Use Permit Application Information Page 6
Land Use Permit Application Review Checklist
Submission #: p O
W t zoning district is the project located in?
12'R -1 ❑ 2❑ R-3 ❑ R-4 ❑ R-RB ❑ C ❑ 1 ❑ M ❑ A-1 ❑ A-2 ❑ F-1 ❑ F-2 ❑ W ❑ M -M
❑ Yes No
Is lot substandard (does not meet current zoning dimensional requirements)?
Deed of record:
es ❑ No
Is the project located in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR
landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)?
Yes ❑ No
Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of
navigable waterway)
❑ Yes N
Is the project located in the Floodplain? Zone:
❑ Yes 96Jo
Are there wetlands on the property?
❑ Yes E4"N,0
Is project associated with a nonconforming use or structure?
❑ Yes ltcJo
Is project associated with a variance? Case #:
❑ Yes 4p
Is project associated with a Special B or Conditional Use Permit? Permit #:
❑ Yes 44p
Is the project associated with a Special A Use Permit?
❑ Yes No
Does the project require sanitary?
0 Existing ❑ New ❑ Intercept ❑ Reconnect ❑ Non -Plumbing O Public
Sanitary Permit #: # of Bedrooms:
❑ Yes 4o
Does the project require mitigation?
Implementation Deadline: Date of Compliance:
❑ es No
Does the project require an affidavit? Affidavit #:
Yes ❑ No
Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback?
❑ Yes ❑ No
Did pplicant/property owner mark lot line(s), if project is within 30 feet of required setback?
Project use is? Residential O Commercial O Municipal
Project type is? ❑ New Construction Addition/Alteration O Change Use O Relocate ❑ RV Placement ❑ Sign
❑ Establishing a Bus' ss O Temporary O Shoreland Grading O Other, describe:
Structure Type is: Residence ❑ Principal Structure O Accessory Structure O Boathouse (one story only)
❑ Open-sided/Screened Structure (gazebo, etc.) ❑ Stairway to navigable waters ❑ Mobile Home
❑ Shipping Container ❑ Other, describe
Total Sq. Ft. of Project: tOM. Number of Stories: ) Overall Height: I (
Fee Type
Calculation
Fee Amount
❑ Dwelling Enclosed Areas — all enclosed areas within
N
$0.75 x sq ft
(minimum $125)
dwelling except attached non -habitable garages
$
❑ Dwelling Unenclosed Areas (decks, patios, etc.) or
$0.20 x sq ft
(minimum $125)
Attached Non -Habitable Garages
$
❑ Habitable Residential Accessory Structures
$0.50 x sq ft
(minimum $75)
❑ Non -Habitable Residential Principal and Accessory
$0.20 x s ft
q
(minimum $75)
Structures
$
❑ Commercial/Municipal Principal Structures
$250+$0.005 x
(minimum $250)
cost of construction
$
❑ Commercial/Municipal Accessory Structures
$150 + $0.005 x
(minimum $150)
cost of construction
$
❑ Return Inspection ❑ Land Use Revisions O Special Use Permit - Class A ❑ Floodplain horeland - Impervious
Surface ❑ Shoreland - Non -Conforming, etc. O Tower Siting/Collocation 1 ❑ Tower Collocation 2 ❑ Metallic
Mine
❑ After -the -Fact (ATF)
$
Inspected by:,ht
(
Date of Ins�je ion:
V9
Re -Inspected y:
Date of Re -Inspection:
Denied by:
Date of Denial:
Reason for Denial:
Date Denial Letter Mailed:
Approved by:
Date of Approval:
fnii( IlcfJil(tJvtci
Cond' n(s): U J
Gust
meet and maintain setbacks from furthest extension of structure including eaves and
overhangs.
O For personal storage only.
�or personal residence only.
❑Not for human habitation or sleeping purposes.
I�Town/State/DNR/Federal may require permitting
❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
ed prior to the start of construction.
Z;Zniform
Q'Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be
obtained prior to the start of construction (if applicable).
2Use best management practices to limit and prevent erosion during construction.
❑ This permit cannot be transferred if property is sold.
0 A Bayfield County Health Dept permit is required.
❑ Check with Town regarding room tax.
❑ Short -Term Rental is for a maximum occupancy of persons.
❑ Jgn must meet the requirements of Article E of the Bayfield County Zoning Ordinance.
B'To be constructed per plan.
❑ Adhere to privy agreement.
❑ Temporary permit allowing existing structure for a period of less than 1 year.
0 RV may not be used for permanent residence or storage.
❑ RV allowed for
0 RV must be removed by
❑ No sewer and pressurized water allowed in the structure.
❑ No plumbing or plumbing fixtures allowed.
❑ No additional sleeping areas allowed without obtaining necessary sanitary permit(s).
❑ Land use permits shall be required for any new residence, any building or structure erected,
relocated, rebuilt, or structurally altered
❑ Land use permits shall be obtained prior to the initiation of construction or a change in land use
❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are
required
❑ Sanitation requirements must be met (if applicable)
0 Additional conditions may be placed and need to be adhered to at the time of permit issuance
Other Conditions:
134-YFIELD Bayfield County
Planning & Zoning Department
117 E 51 Street
P.O. Box 58
Washburn, WI 54891
Phone: 715-373-6138
Fax: 715-373-0114
Property Owner: Submission Number:
EYERLY, JOHN E & LIISA A LU-02105
PO BOX 327
CORNUCOPIA, WI 54827 Transaction Number:
LU-02105-3F0B3
Description Amount
Shoreland - Impervious Surface $25.00
Habitable Residential Principal Structures - enclosed
areas $0.75/square foot (minimum $125)
$125.00
Total: $150.00
Payment Amount: $153.57
Reference: 2813331105
Paid by: John Eyerly
Payment Type: Credit Card
Transaction Date: 2/26/2026
Receipt of payment does not guarantee eligibility of
permit and is not proof of issuance of a permit.
Town, City, Village, State or Federal
Permits May Also Be Required
Substandard — No I Nonconforming — No
Shoreland — Yes / Impervious Surface - Yes
Floodplain - No / Wetlands - No
Mitigation - No / Affidavit #:
LAND USE -X
X
SANITARY -
SPECIAL A -
SPECIAL B/CONDITIONAL -
BOA -
BAYFIELD COUNTY
PERMIT
WEATHERIZE AND POST THIS PERMIT
ON THE PREMISES DURING CONSTRUCTION
No. 26-0066 Tax ID: 7442
Issued To: EYERLY, JOHN E & LIISA A
Location: S20 - T50N - R06W
Town of Bell
Legal Description: LOT 1 CSM #840 IN V.5 P.329 (LOCATED IN GOVT LOT 1) IN V.967 P.910 260
Residential Structure in R-1 zoning district
For: Addition/Alteration [1 - Story ], Residence on a Walkout Basement [104 Total sq. ft. ] Height of 11'
(Disclaimer): You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any
future expansions or development would require additional permitting.
Condition(s): See back of card
NOTE: This permit expires two years from date of issuance if the authorized construction Emily Macgillivray
work or land use has not begun.
Authorized Issuing Official
Changes in plans or specifications shall not be made without obtaining approval.
This permit may be void or revoked if any of the application information is found
to have been misrepresented, erroneous, or incomplete. February 26, 2026
This permit may be void or revoked if any performance conditions are not Date
completed or if any prohibitory conditions are violated.
Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs.
For personal residence only.
Town/State/DNR/Federal may require permitting.
A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be obtained
prior to the start of construction (if applicable).
Use best management practices to limit and prevent erosion during construction.
To be constructed per plan.