Loading...
HomeMy WebLinkAbout26-0554Return to: County Use Only: 117 E 5th Street, PO Box 58 Bayfield County Planning and Zoning Department Submission #• LU - 02S 7c - Washburn, WI 54891 LAND USE PERMIT APPLICATION Permit It: & ti Permits@bayfieldcountv.wi.gov Date: O SECTION A: General Information Property Owner Name: Authorized Agent Name (if applicable): Gary Fries Brodie Zar Telephone Number: Telephone Number: 952-693-3849 715-209-7871 E -Mail Address: E -Mail Address: freezer7591@hotmail.com bzar@no2septic.com Mailing Address: Mailing Address: Planning and Zoning Agency 85270 Apostle Highlands Blvd 50181 State Hwy 13 City, State, Zip: City, State, Zip: Bayfield, WI, 54814 Ashland, Wi, 54806 e[m Contractor: Telephone Number: E -Mail Address: 9 r-$ Dykstra Construction 715-682-9599 info@dykstraconstructioninc.com SECTION B: Property Information Project Address (if different from mailing address): Legal Description (if additional space is needed attach a separate sheet): APOSTLE HIGHLAND WOOD ADD LOT 1 LESS PART OF LOT 1 CSM#1535 IN V.9 IN V.1161 P. 714 Section, Township, Range: 515, T 50 N,R04W Town of: Bayfield Tax ID #: 34577 Lot Size (Acres/Square Feet): 1.513 SECTION C: Project Information (check all that apply) Project Use is: El Residential ❑ Commercial O Municipal If Commercial, estimated cost of construction: $ Project Type is: ID New Construction ❑ Addition/Alteration (existing structure) ❑ Change Use (existing structure) O Relocate (existing structure) ❑ RV Placement 21+ days ❑ Sign O Establishing a Business O Temporary (12 or less months) O Shoreland Grading, Class A ❑ RV Placement 4+ months, Class A 0 Other (describe): required Total sq ft): required ECTjON D: Structure Information (Does not apply to RVs and Signs, go to Section E) Structure Type is: O Residence O Principal Structure (describe): El Accessory Structure (describe): 0 Shoreland Exempt Structure (describe): O Mobile Home (provide manufactured 36'x16' Workshop/Greenhouse date): 0 Shipping Container O Other (describe): Foundation Type: ❑ Basement O Walkout Basement El Slab O Crawlspace O Ground 0 Skids O Other (explain): Existing Structure: Length: Width: Height: Proposed Structure (Provide Sq Ft based on outside dimensions, including unfinished areas, attached garages/above grade decks/porches): Basement Sq Ft: 1't Floor Sq Ft: Loft Sq Ft: 2nd Floor Sq Ft: 3rd Floor Sq Ft: 576 Garage Sq Ft: Porch Sq Ft: Deck Sq Ft: Other Sq Ft (describe): Other Sq Ft (describe): Total Sq Ft: 576 Overall Height (finished grade to peak): 14'-6" # of Stories: 1 Existing # of Bedrooms on property:4 Proposed # of Bedrooms in project: 0 SECTION E: RV and Sign Information (check all that apply) Sign is: RVis: ❑ New O Replacement ❑ New ❑ Replacement ❑ On -premise ❑ Off -premise ❑ 1 -sided O 2 -sided Year. Vin #: ❑ On -building 0 Multi -Tenant Length: Width: Height: Make: Model: Application Page 1 SECTION F: Site Plan — attach a site plan or draw site plan in box below (See pages I & 2 of Land Use Permit Application Information for information that is required to be provided on site plan) how location of: Drivewa Frontage Roads (include name)%Jxisting Structures ❑ Well (W) ❑ Septic Tank (Si') ❑ Drain Field (DF) El Holding Tank ❑ Privy (P) ❑ Lake ❑ River O Stream/Creek O Pond ❑Floodplain ❑Wetlands ❑Slopes over 20% N4 Setback or distance from furthest extent of structure County Use Only including eaves and overhangs to (include on site plan): Verified setbacks Road Centerline ft. ft. Notes/Comments: ( ( S arO J RECEIVED Front Lot Line/Right-of-Way flo i ft. ft. Side Lo ine I ? 2 ft. J J ft. (Nord(Easflouth West, circle one) Stz€ U U SideI2ttine2 p ft. '701 ft I� SEP 4 2026 orth East South es circle one 2 rr b( tL] G�1≤(� Rear Lot Line 7 ft. Sa I ` (OO4_ft. Bayfley co. Planning and Zoning Agency Septic/Holding Tank ft. ft. Drainfield ft. ft. Privy ft. ft. Well ft. ft. Existing Structure/Building 20 It. ft. Wetland ft. ft. Elevation of Floodplain ft. ft. Ordinary High -Water Mark (OHWM) ft. ft. Other (describe) ft. ft. Application Page 2 SECTION G: Additional Questions ❑ Yes ❑ No Has the location of the proposed project' been staked? If no, what date will this be completed: Note: The site will not be inspected nor permit issued until after the staking date listed above. ❑ Yes O No Did a licensed surveyor mark lot line(s) if project is within 10 feet of required setback? See page 2 of Land Use Application Information for required setbacks. ❑ Yes 0 No Did property owner or applicant mark lot line(s) if project is within 30 feet of required setback? See page 2 of Land Use Application Information for required setbacks. El Yes ❑ No Is there an existing sanitary system on the property? If yes, what kind? El Drainfield ❑ Holding Tank ❑ Municipal/Public ❑ Other (describe): El Yes 0 No Will pressurized water be installed in the structure? If yes, what kind of sanitary system will be installed or used to manage wastewater? O Drainfield ❑ Holding Tank ❑ Municipal/Public ❑ Other (describe): ❑ Yes O No Will sleeping occur in the structure? If yes, contact local Uniform Dwelling Code (UDC) for approva and inspection requirements. Is the project associated with any of the following: O Rezone O Class A Special Use O Class B Special Use O Conditional Use O Variance Cn Fee payment will be made via: Planning and Zoning Agency ❑ Check (attached) ❑ Cash (attached) .�$debit/credit/echeck (department to call once payment is ready to be taken) How would you like to receive your permit card? Mail to: OR,)Email to: O Property Owner Address Agent Address ❑ Contractor Address O Other (provide name and email or address): `Include eaves, overhangs, sanitary system, and well in staking measurements "- $ action H: Acknowledgement and Signature All Land Use Permits expire Two (2) Years from the date of issuance if construction or use has not begun. Sanitary permit issuance, if required, needs to occur prior to Land Use Permit issuance. Failure to obtain a permit or starting construction without a permit will result in penalties. The local Town, Village, City, State or Federal agencies may also require permits. The new construction of one- & two-family dwellings requires review and approval by the local Uniform Dwelling Code (UDC) authority. Additions and alterations to one - and two-family dwellings may require review and approval by the UDC authority. All municipalities are required to enforce the UDC. If subject property is part of a Condominium Plat, applicant hereby certifies and represents that applicant has all necessary approvals and recorded documents required to complete the project for which this permit is sought including requirements set forth in Wisconsin statutes pertaining to condominium associations, the Declaration of the Condominium Association in which the property is located, and all other rules, regulations and requirements pertaining to that Condominium Association. You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources wetlands identification web page, dnr.wi.sov/topic/wetlands, or contact a Department of Natural Resources service center (715)685-2900. I (we) declare that this application, including any accompanying information, has been examined by me (us) and to the best of my (our) knowledge and belief it is true, correct, and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information that I (we) are providing and that will be relied upon by Bayfield County in determining whether to issue a permit. I (we) further accept liability which may be a result of Bayfield County relying on this information I (we) are providing in or with this application. I (we) consent to county officials charged with administering county ordinances to have access to the above -described property at any reasonable time for the purpose of inspection. 6r D°\\ -%e Owner(s) or Authorized Agent Printed Name: Owner(s) or Authorized Agent Signature: i`_____C�1 Date: NOTES: I. If you are signing on behalf of the owner(s) a letter of authorization must accompany this application. 2. Specific conditions/instructions may be stated on the face of the issued Land Use Permits. Owners, agents, & contractors must all be aware of permit details & conditions and permit card must be posted on property prior to start of project Application Page 3 Yes ❑ No Will new electrical installation occur with project/structure? If yes, contact State for inspection requirements. ❑ Yes -No Will new plumbing installation occur with project/structure? If yes, contact State for inspection requirements. ❑ Yes o Is the project/structure to be used for commercial purposes? If yes, contact the State of Wisconsin Commercial Buildings & Structures to determine if threquire review and approval. ❑ Yes [a -No Is the project located in the Floodplain? If yes, additional materials and fee will be required. Reference the FEMA Map(https://msc.fema.gov/portal/home) and Title 13, Chapter 2 ofBayfield County Zoning Ordinance (https://www.bayfieldcounty.wi.gov/71_1/Title-I 3---Zonin -Code . ❑ Yes No Is the project located in the Shorelands, within 300 feet of a river/stream OR landward side of floodplain OR 1000 feet of a lake/pond/flowage (whichever is greater)? If yes, shoreland regulations will apply. El Yes No Is your property a waterfront lot and will any part of your project be located within 300 feet of the water OR is your entire lot located within 300 feet of the water? If yes to either, complete and include Impervious Surface Form (https://www.bayfieldcountv.wi.gov/DocumentCenter/View/3 159/lmervious-Surface-PD . ❑ Yes No Are there wetlands on the property. If yes, wetland regulations will apply. A 25 -foot setback is required to any mapped wetlands. Reference Department of Natural Resource Surface Data Viewer Map (https://dnrmaps.wi.gov/H5/?Viewer=SWDV). El Yes .No If applicable, did you contact the road authority to see if a driveway permit or regulations apply to placement of driveway? ❑ Yes No Was the property purchased recently? If yes, include a recorded deed. A copy of recorded deed can be acquired from the Bayfield County Register of Deed's office. C Yes El No Is a site plan included with all information requested on Page 1 of the Land Use Permit Application Information? If no, a site plan with all applicable information on Page I is required for all submissions. It -Yes El No Is a floor plan(s) included with all information requested on Page 4 of the Land Use Permit Application Information? Floor plans are required for residences, commercial buildings, or additions/alterations to these structures. 0 Yes lJA10 If structure is in Shorelands, have building elevations with all information requested on Page 5 of the Land Use Permit Application Information been included? El Yes ¢ .No Is this application to correct a violation or has the project already commenced? If yes, at minimum an after -the - fact fee willa I . If not permittable, the structure will need to be removed. Yes ❑ No If addition, does the existing structure meet required setbacks, see Page 2 of the Land Use Permit Application Information? If no, be aware that it is the property owner's responsibility to show the structure was legally placed and there may be limitations to expansion of the structure, see Bayfield County Section 13-1-40 (https://www.bayfieldcounty.wi.gov/71I/Title- fieldcoun .wi. ov/71I/Title-13---Zoning-Code). -0 Yes ❑ No Is the use of the project/structure allowed per Bayfield County Section 13-1-62 (httpsil/www.bayfieldcounty.wi.gov/71 I/Title-13—Zonine-Code). If no, be aware it is the property owner's responsibility to show the use was legally established and there may be limitation to expansion of the use, see Bayfield County Section 13-1-40 (https://www.bayfieldcountv.wi.gov/71 I/Title- 13--Zonin-Code . Yes 0 No Have all fees been included with the completed application? See Fee Schedule on website (httos://www.bayfieldcounty.wi.gov/1389/Fee-Schedule). If no, all applicable fees need to be paid before permit can be issued. $-Yes No Is property owned by multiple owners or is someone aside from the property owner applying? If yes, a Letter of Authorization Form needs to be included. Form available on website fieldcoun .wi. ov/1340/A lications-Forms . (https://www.bayfieldcounty.wi.gov/1340/Applications-Forms). El Yes No Is property owned by a Trust or Business entity (LLC, Corp., etc.)? If yes to either, an Affidavit of Authority needs to be included. Forms available on website (littps://www.bayfieldcounty.wi.gov/1340/Applications- Forns). a -Yes ❑ No Is Land Use Application completed and signed? RECEIVED SEP 24 2026 Bayneld Co. Planning and Zoning Agency Land Use Permit Application Information Page 6 Slide 1 of 8 SLAB ON GRADE CONSTRUCTION FOR A COMBINATION WORKSHOP/GREENHOUSE STRUCTURE Location: 85270 Apostle Highlands Blvd. RECEIVED Bayfield, WI 54814 SEP 247026 Point of Contact: Gary Fries, cell: 952-693-3849, email: freezer7591__@hotmail.com eayneid co. Planning and Zoning Agency Construction Notes 1. AU construction will be in accordance with applicable Wisconsin Building Code(s). 2. This building is a combined structure consisting of a 16 ft x 16 ft workshop joined through a 16 ft common wall to the 16 ft x 20 ft greenhouse. 3. Reinforced slab on grade construction with grade beams. PEX tubing with HD board insulation will be installed in both sections of the building to facilitate zoned radiant floor heating. Refer to slide 3 for more information. Note the floor differences (pavers and concrete) between the two rooms 4. All exterior and interior walls of the structure will be of 2" x 6" x 9' construction at 16" on center. Refer to slide 4 for the wall plan regarding horizontal dimensions and window and door locations. 4a. The exterior workshop walls will receive a suitable house wrap. All seams will be sealed with builders' tape to prevent air infiltration. These walls will be covered with 7/16" OSB. The common wall between the workshop and greenhouse will have plywood installed by the owner later in the construction process. 4b. The greenhouse walls will consist of a 2" x 6" x 2' knee wall, topped with 8mm clear polycarbonate twin -wall greenhouse panels. Trim and flashings will be fastened to the wall girts on the greenhouse panel sections per the manufacturer's specifications. The knee wall in the greenhouse will receive the same OSB sheeting, wrap, and siding as the workshop walls. Refer to slides 6-8 for more visual information. 5. The entire roof will have an engineered truss system design for a 6/12 pitch. The truss will be installed at 24" on center and anchored per code. 5a. The roof over the workshop will have sheeting installed per code requirements. The workshop roof area will have 12 - inch eaves. Aluminum soffit and fascia are to be installed along the overhangs. The final type of roofing material will be determined in consultation with the selected project contractor. Slide 2 of 8 SLAB ON GRADE CONSTRUCTION FOR A COMBINATION WORKSHOP/GREENHOUSE STRUCTURE Location: 85270 Apostle Highlands Blvd. RECEIVED Bayfield, WI 54814 SF_P 24 2026 Point of Contact: Gary Fries, cell: 952-693-3849, email: freezer7591Cc) hotmail.com eayfieb �o• planning and ZonM�g Agen°/ Construction Notes (continued) 5b. The roof area over the greenhouse will have 8mm clear polycarbonate twin -wall greenhouse panels installed per the manufacturer's specifications. The greenhouse will have no eaves and will terminate at the wall -roof junction. This junction wilt be secured in accordance with the polycarbonate manufacturer's specifications. 6. The owner will purchase and install the window and double exterior door for the workshop. 7. LP SmartSide® Siding and exterior trim installed for the workshop exterior and greenhouse knee walls. The color and dimension of the siding will be decided in consultation with the selected project contractor. 8. Excavation required to bury two conduits from the northwest corner of the house to the west side of the workshop. Refer to slide 5 for more information. The trenching distance is approximately 80 feet. The conduits wilt allow electrical and water access from the house's mechanical room to the workshop. 8a. The conduit size for the electrical must allow for easy movement of 100 -amp rated wire when pulled through the conduit. Additional wire length will be left for installation at each panel location. The subpanel will be placed between the entry door and the common wall in the workshop. The subpanel will be connected to the service under a future electrical permit. Refer to slide 4. 8b. The water conduit must allow the easy passage of 1 -inch PEX tubing when pulled through it. Acceptable additional tubing length will be left for installation at each plumbing location. The electrical wilt not be connected at this time. That procedure will be addressed in a future electrical permit. Additionally, a sleeve beneath the grade beam must be installed to allow the conduit and tubing to enter through the workshop floor. The water hydrant will be 2 feet to the right of the doorway on the common wall, and 1 foot out from the wall. Refer to slide 4. 9. This construction request is to give the building a completed appearance on the outside. All interior work: electrical, plumbing, insulation, wall vapor barrier, drywall, painting, etc., will be addressed in future permits. Slide 3 of 8 RECEIVED GREENHOUSE FLOOR CONSTRUCTION SEP 247076 - 1 5/8 -inch thick pavers (purchased and installed by owner) Bayfield o. Planning and Zoning Agency - 2 -inch sand bed (purchased and installed by owner) - Two, 300 -foot loops of Uponor 1/2" hePEX tubing (purchased and installed by owner) - Flat mesh panel used to secure PEX tubing (purchased and installed by owner) - 2 -inch closed -cell HD polyethylene board insulation (installing contractor) - 6 mit plastic vapor barrier (installing contractor) - Crushed stone/gravel compacted base brought to the desired grade (installing contractor) WORKSHOP FLOOR CONSTRUCTION - 4 -inch reinforced concrete slab with a smooth trowel finish (installing contractor) - Two, 300 -foot loops of Uponor 1/z" hePEX tubing (purchased and installed by owner) - Flat mesh panel used to secure PEX tubing (purchased and installed by owner) - 2 -inch closed -cell HD polyethylene board insulation (installing contractor) -6 mil plastic vapor barrier (installing contractor) - Crushed stone/gravel compacted base brought to the desired grade (installing contractor) Slide 4 of 8 RECEIVED SEP 242026 Pn 8ayf eid Co. lan 2' x 6'x 9ft stud wallwith vertical polycarbonate siding and 4 LINE OF TAANSISTION polycarbonate roofing. / Greenhouse - Wall Plan Not to Scale 2'x 6' x9ft stud waUwith plywood sheeting and shingled roofing. Slide 5 of 8 RECEIVI SEP 2 -4 2028 Baylield Co. Planning and Zoning Agency Water and Electrical Supplies to Workshop FRIES RESIDENCE FLOOR PLAN LOWER LEVEL NOT TO SCALE — DIMENSIONS APPROXIMATE Main electrical Panel WORKSHOP SECTION RECEIVED SEP 242026 eared Co. Planning and Zoning Agency x 16 ft) GREENHOUSE SECTION (16 ft x 20 tL.. D 203 Workshop / Not to Scale Greenhouse View - Endwall A Slide 6 of 8 :4 `- RECEIVED Slide 7 of 8 SEP 2 4 2026 Bay%ld co. Planning and Zoning Agency GREENHOUSE SECTION (16 ft x 20 WORKSHOP SECTION (16 ft x 16 3 a iis i 1 Y � p * qq d ps 20'0" > 160" Greenhouse! Workshop View - Endwall B Not to Scale 14 5 1 Slide 8 of 8 RECEIVED SEP 24 2026 Bayfleld Co. Planning and Zoning Agency a i 1 14'6 9 t __________________________________q B 160 160 Greenhouse View - Sidewall C Workshop View - Sidewall D Not to Scale Not to Scale ZY/.'str:� CONSTRUCTION Inc. July 1, 2026 Workshop Gary Fries Bayriea co. 85270 Apostle Highlands Blvd. Plannkg and zoning Agency Bayfield, WI 54814 We Gary Fries , give Tim Dykstra & Dykstra Construction Inc., the authority to sign permit documents, on our behalf, for the duration of the Workshop 7860 US Hwy 2 - Iron River WI 54847 (715) 682-9599 Info@dykstraconstructioninc.com RECEIVED SEP 242026 Gary */&c 2 Client Name W�tHl/.Np BUILDERS • NABA• ASSOCIATION Am/ w\ O0 07/01/2026 Date f l F Arrow Authorize to Sign - Fries GreenShop - 'I Final Audit Report 2026-07-01 Created: 2026-07-01 By: Jordan Herlevi Qhedevi@dykstraconstructioninc.com) Status: Signed Transaction ID: CBJCHBCAABAA1_R9jn365ZgtgzxSq-xsQVLj7-G4SK2X "Authorize to Sign - Fries GreenShop -" History ti Document created by Jordan Herleviaherlevi@dykstraconstructioninc.com) 2026-07-01 - 2:37:24 PM GMT C•'. Document emailed to Gary Fries (freezer7591 @hotmail.com) for signature 2026-07-01 - 2:37:30 PM GMT Email viewed by Gary Fries (freezer7591@hotmail.com) 2026-07-01 - 6:07:27 PM GMT 6o Document e -signed by Gary Fries (freezer7591 @hotmail.com) Signature Date: 2026-07-01 - 6:08:08 PM GMT - Time Source: server - Signature Appearance Selected: TYPE o Agreement completed. 2026-07-01 - 6:08:08 PM GMT Q Adobe Acrobat Sign RECEIVED SEP 2 4 2026 Bayfieid Co. Planning and Zoning Agency Bayfield County, WI � • II `k R Ry,Rpfd o -,t 1.>•. .. r ``4.' `• Ron ' 7 . A p � l � w q , >.. � R � + � ,y 4� L SIR Pb .;I ₹�•,, r AGF 14 ° f,�:a.rb xr ��YM� ,to S' Y ₹ ro Op,OoAAp,oAVq K Z p Q' � AI '✓'� l ,�. AN1 A M Yy�q,�y i.. o a 'fi �' 1P€ai� r �. J'�. ift tl i�'� ^ �Ii ti'VLV r.. ( f ••',M iIK a h 6 a l rt i '� , `• r ARN M p A RAiR A VGMVEREDERICK T r Ti TRUST - rµ 10/2/2026, 10:01:35 AM Rivers Road Type •••••• Private Lakes County Building Footprint 2015 Approximate Parcel Boundary Town Building 1:3,104 0 0.04 0.07 0.15mi �Tr� 0 0.05 0.1 0.2 km Bayfiae County Land Remfds Department Bayfiee County Zoning Appll®gon hllpsalnraps.Cay0C1Cmunly.wl.govIZoning WABI 10/2/26, 10:02 AM Real Estate Bayfield County Property Listing Today's Date: 10/2/2026 Novus-Wisconsin Access rev. 12.0206 Property Status: Current Created On: 8/23/2007 1:58:12 PM Description Updated: 4/15/2025 Tax ID: 34577 PIN: 04-006-2-50-04-15-4 00-107-11000 Legacy PIN: Map ID: Municipality: (006) TOWN OF BAYFIELD STR: S15 TSON R04W Description: APOSTLE HIGHLAND WOOD ADD LOT 1 IN V.1161 P.714 Recorded Acres: 1.513 Calculated Acres: 1.513 Lottery Claims: 1 First Dollar: Yes Zoning: (R-RB) Residential -Recreational Business ESN: 105 �I Tax Districts Updated: 8/23/2007 1 STATE 04 COUNTY 006 TOWN OF BAYFIELD 040315 SCHL-BAYFIELD 001700 TECHNICAL COLLEGE 047060 PIKES BAY SANITARY 4 Recorded Documents Updated: 3/9/2009 ® WARRANTY DEED Date Recorded: 6/10/2016 2016R-563913 1161-714 91 WARRANTY DEED Date Recorded: 3/2/2009 2009R-525251 1011-736 O CERTIFIED SURVEY MAP Date Recorded: 8/23/2007 2007R-513430 9-150 ® WARRANTY DEED Date Recorded: 5/1/2007 2007R-513569 969-122 1 Ownership _ Updated: 4/15/2025 GARY] & ELAINE E FRIES BAYFIELD WI Billing Address: Mailing Address: GARY] & ELAINE E FRIES GARY] & ELAINE E FRIES PO BOX 804 PO BOX 804 BAYFIELD WI 54814 BAYFIELD WI 54814 11 Site Address * indicates Private Road 85270 APOSTLE HIGHLANDS BLVD * BAYFIELD 54814 ® Property Assessment Updated: 7/27/2026 2026 Assessment Detail Code Acres Land Imp. G1 -RESIDENTIAL 1.513 30,100 391,300 2 -Year Comparison 2025 2026 Change Land: 22,700 30,100 32.6% Improved: 100,400 391,300 289.7% Total: 123,100 421,400 242.3% M Property History Parent Properties Tax ID 04-006-2-50-04-15-4 04-000-10000 4708 04-006-2-50-04-15-4 00-107-10000 6031 HISTORY ® Expand All History, White=Current Parcels Pink=Retired Parcels 34577 This Parcel U Parents `r Children https://novus.bayreldcounty.wi.gov/access/master.asp?paprpid=34577 1/1 Bayfield County, WI S. St 10/2/2026, 10:02:14 AM Approximate Parcel Boundary Road Type Private Building 6AR_ [J16EL EFRIES 01OILRAuIO#'6092 OROID%TGw ID#60 GARY J d ELAINE iFRIE6 6ARY J 6ELHB E FI vI C♦\1A ,y `F t. lA �t \ t .w5 ' IL c-5 ] 1 i E AEIAIII st Ol uA in tJ lr1 J L v 4-iln� I Al 1 .p 1:791 0 0.01 0.01 0 0.01 0.03 0.03 ml Bayfiee County Land Records DeparMent 0.06 km Beyleid Cwnly Zoning Application Mlps:l/mape.bayfoidcwntywf.gw/ZaningWABI Land Use Permit Application Review Checklist Submission #: What zoning district is the project j%cated in? ❑ R-1 ❑ R-2 ❑ R-3 ❑ R-4 U'R-RB ❑ C ❑ I ❑ M ❑ A-1 ❑ A-2 ❑ F-1 ❑ F-2 ❑ W ❑ M -M ❑ Yes �j4o Is lot substandard (does not meet current zoning dimensional requirements)? Deed of record: ❑ Yes o Is the project located in the Shorelands (Shorelands are lands within 300 feet of a river/stream OR landward side of floodplain OR 1000 feet of a lake/pond/flowage, whichever is greater)? ❑ Yes No Is impervious surface required? (Required if riparian lot OR lot is entirely within 300 feet of OHWM of navigable waterway) ❑ Yes 4i0 Is the project located in the Floodplain? Zone: ❑ Yes M No Are there wetlands on the property? ❑ Yes l,No Is project associated with a nonconforming use or structure? ❑ Yes 4Jo Is project associated with a variance? Case #: ❑ Yes D4p Is project associated with a Special B or Conditional Use Permit? Permit #: ❑ Yes E34p Is the project associated with a Special A Use Permit? ❑ Yes o Does the project require sanitary? O Existing ❑ New ❑ Intercept ❑ Reconnect O Non -Plumbing O Public Sanitary Permit #: # of Bedrooms: ❑ Yes D4o / Does the project require mitigation? Implementation Deadline: Date of Compliance: ❑ Yes 044o Does the project require an affidavit? Affidavit if: ❑ Yes O No Did licensed surveyor mark lot line(s), if project is within 10 feet of required setback? ❑ Yes 0 No Did applicant/property owner mark lot line(s), if project is within 30 feet of required setback? Project use is? VReidential ❑ Commercial ❑ Municipal Project type is? New Construction ❑ Addition/Alteration ❑ Change Use ❑ Relocate ❑ RV Placement O Sign 0 Establishing a Business 0 Temporary 0 Shoreland Gradjag ❑ Other, describe: Structure Type is: 0 Residence ❑ Principal Structure Accessory Structure ❑ Boathouse (one story only) ❑ Open-sided/Screened Structure (gazebo, etc.) 0 Stairway to navigable waters ❑ Mobile Home ❑ Shipping Container ❑ Other, describe 5,P Total Sq. Ft. of Project: Number of Stories: I Overall Height: -f Fee Type Calculation Fee Amount ❑ Habitable Residential Principal and Accessory Structures - Enclosed Areas — all enclosed areas within dwelling except attached non -habitable garages $0.50 x sq ft (minimum $125) $ ❑ Dwelling Unenclosed Areas (decks, patios, etc.) or Attached Non -Habitable Garages $0.20 x sq ft (minimum $125) $ ❑ Non -Habitable Residential Principal and Accessory Structures $0.20 x r7(� sq ft (minimum $75) $ G ❑ Commercial Principal Structures $250 + $0.005 x cost of construction (minimum $250) $ ❑ Commercial AccessoryStructures $150 + $0.005 x cost of construction (minimum $150) $ ❑ Municipal Principal and Accessory Structures n/a $0 (exempt from fees) ❑ Return Inspection ❑ Land Use Revisions 0 Special Use Permit - Class A 0 Floodplain 0 Shoreland - Impervious Surface ❑ Shoreland - Non -Conforming, etc. 0 Tower Siting/Collocation 1 0 Tower Collocation 2 O Metallic Mine ❑ After -the -Fact (ATF) $ Inspected by: /fl/cecc1 Date of Inspectio Re -Inspected by: U Date of Re -Inspection: Denied by: Date of Denial: Reason for Denial: Date Denial Letter Mailed: Approved by: Date of Approval: I l d c'9&-c; Conditio ): ust meet and maintain setbacks from fu hest extension of structure including eaves and overhangs. ❑ For personal storage only. ersonal residence only. lr V human habitation or gslee in purposes. P may require permitting ❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be obtained prior to the start of construction. ❑ A Uniform Dwelling Code (UDC) Permit from the locally contracted UDC Inspection Agency must be obtained prior to the start of construction (if applicable). ❑ Use best management practices to limit and prevent erosion during construction. ❑ This permit cannot be transferred if property is sold. ❑ A Bayfield County Health Dept permit is required. ❑ Check with Town regarding room tax. ❑ Short -Term Rental is for a maximum occupancy of persons. ❑ Si meet the requirements of Article E of the Bayfield County Zoning Ordinance. C'fo be constructed plan. P lan. ❑ Adhere to privy agreement. ❑ Temporary permit allowing existing structure for a period of less than 1 year. ❑ RV may not be used for permanent residence or storage. ❑ RV allowed for ❑ RV must be removed by ❑ sewer and pressurized water allowed in the structure. No plumbing or plumbing fixtures allowed. ❑ No additional sleeping areas allowed without obtaining necessary sanitary permit(s). ❑ Land use permits shall be required for any new residence, any building or structure erected, relocated, rebuilt, or structurally altered ❑ Land use permits shall be obtained prior to the initiation of construction or a change in land use ❑ Requirements (e.g., permits/licensing/tax) of Local Town, Village, City, State or Federal agencies are required ❑ Sanitation requirements must be met (if applicable) ❑ Additional conditions may be placed and need to be adhered to at the time of permit issuance Other Conditions: K: Applications and Forms/Applications/Land Use/Updated 2/25/2026 mdk P YFIELD Bayfield County Planning & Zoning Department 117 E 5th Street P.O. Box 58 Washburn, WI 54891 Phone: 715-373-6138 Fax: 715-373-0114 Property Owner: FRIES, GARY J & ELAINE E 85270 APOSTLE HIGHLANDS BLVD BAYFIELD, WI 54814 Description Non -Habitable Residential Principal and Accessory Structures - $0.20/square foot (minimum $75) Submission Number: LU-02572 Transaction Number: LU-02572-57731 Amount $115.20 Total: $115.20 Payment Amount: $117.94 Reference: 1793225455 Paid by: Brodie Zar Payment Type: Credit Card Transaction Date: 10/12/2026 Receipt of payment does not guarantee eligibility of permit and is not proof of issuance of a permit. Town, City, Village, State or Federal Permits May Also Be Required Substandard — No / Nonconforming — No Shoreland - No / Impervious Surface - No Floodplain - No! Wetlands - No Mitigation - No / Affidavit #: LAND USE - X SANITARY - SPECIAL A - SPECIAL B/CONDITIONAL - BOA - BAYFIELD COUNTY PERMIT WEATHERIZE AND POST THIS PERMIT ON THE PREMISES DURING CONSTRUCTION No. 26-0554 Tax ID: 34577 Issued To: FRIES, GARY J & ELAINE E Location: S15 - T50N - R04W Town of Bayfield Legal Description: APOSTLE HIGHLAND WOOD ADD LOT 1 IN V.1161 P.714 Residential Structure in R-RB zoning district For: New Construction [1 - Story ], Accessory Structure on a Slab [576 Total sq. ft. ] Height of 14 6" (Disclaimer): You are responsible tot complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Any future expansions or development would require additional permitting. Condition(s): See back of card NOTE: This permit expires two years from date of issuance if the authorized construction Emily Macgillivray work or land use has not begun. Authorized Issuing Official Changes in plans or specifications shall not be made without obtaining approval. This permit may be void or revoked if any of the application information is found to have been misrepresented, erroneous, or incomplete. October 12, 2026 This permit may be void or revoked if any performance conditions are not Date completed or if any prohibitory conditions are violated. Condition(s): Must meet and maintain setbacks from furthest extension of structure including eaves and overhangs. Not for human habitation or sleeping purposes. Town/State/DNR/Federal may require permitting. To be constructed per plan. No plumbing or plumbing fixtures allowed.